Ohio Construction Industry Licensing Board • PSI Electrical Contractor • 100 Scored Questions • 240 Minutes • 70% Passing • 2023 NEC • Ohio Business and Law
Getting ready for Ohio's Master Electrician Contractor exam? This guide explains the statewide Electrical Contractor license, OCILB requirements, PSI trade and Business and Law examinations, approved 2023 National Electrical Code references, exam subjects, preparation strategies, and related study products from Contractor Exam Preps.
Electrical contractors keep buildings powered, equipment working, and the lights on.
That sounds simple until you start counting conductors, transformers, feeders, circuits, motors, disconnects, and protective devices.
Then comes the National Electrical Code.
And suddenly that little electrical panel looks like it has enough rules to run a small country.
Experienced electricians understand that safe installation takes knowledge and careful planning.
They also understand that contractor licensing requires more than working with tools.
Electrical contractors must interpret code requirements, solve calculations, supervise work, manage contracts, understand insurance, and follow state laws.
Ohio has a statewide licensing system for contractors performing covered commercial electrical work.
The state regulates these contractors through the Ohio Construction Industry Licensing Board.
Contractor licensing examinations are administered by PSI.
The correct state license is called Electrical Contractor.
Ohio's statewide commercial electrical credential is the Electrical Contractor license issued by the Ohio Construction Industry Licensing Board, commonly called OCILB.
The Board describes its state contractor credentials as Contractor Licenses, also referred to as Master Licenses.
That is why many electricians and preparation companies use the phrase Ohio Master Electrician.
However, Ohio does not have the same statewide individual Master Electrician license system used by certain other states.
Journeyman and master electrician requirements for particular kinds of work may also be established by local jurisdictions.
This guide focuses on the statewide OCILB Electrical Contractor examination.
It is the appropriate statewide contractor licensing topic for advanced electrical exam preparation.
The Ohio Construction Industry Licensing Board operates under the Ohio Department of Commerce, Division of Industrial Compliance.
The Board licenses qualifying commercial contractors in electrical, heating, ventilation, air conditioning, hydronics, plumbing, and refrigeration.
OCILB determines whether an applicant qualifies to take the state contractor examination.
PSI administers the testing.
Candidates must receive Board approval before scheduling their examinations.
Approved applicants must complete required state and federal background checks before taking the examination.
Once approved and qualified, applicants complete the required examination and licensing steps.
Ohio's statewide contractor examination has two required parts.
Each portion has its own exam outline and passing requirement.
Applicants must pass both portions to meet the normal examination requirement.
Ohio Administrative Code Rule 4101:16-2-03 sets a minimum passing score of 70% on each part.
The Business and Law passing result can remain valid for three years when an already licensed contractor applies to add another qualifying trade, subject to the applicable rule.
The official PSI Electrical Contractor trade exam contains 100 scored questions.
The exam also includes 10 unscored pretest questions.
Candidates may therefore see 110 questions during the session.
The time limit is four hours, or 240 minutes.
The required passing score is 70%.
That means candidates need at least 70 correct answers on the 100 scored questions.
Pretest questions do not count toward the final score.
PSI does not identify the unscored questions during testing.
Answer every question carefully.
Ohio's Business and Law examination contains 50 scored questions.
It also contains five unscored pretest questions.
The exam time limit is two hours, or 120 minutes.
The required passing score is 70%.
Candidates therefore need 35 correct answers on the 50 scored questions.
Topics include licensing, business organization, estimating, bidding, contracts, project management, insurance, bonding, safety, financial management, personnel regulations, taxes, and lien law.
Being able to install an electrical service is important.
Being able to manage the contract and avoid financial problems is also important.
The publicly available PSI Ohio Contractor Trade Examinations Candidate Information Bulletin, updated February 7, 2024, identifies the 2023 National Electrical Code.
PSI permits the 2023 NEC or the 2023 National Electrical Code Handbook.
Either book alone is sufficient, and candidates may use both.
The trade reference list also includes Ugly's Electrical References, 2023.
An additional approved electrical field reference may be used as described in the bulletin.
Candidates must bring their own approved trade reference books.
Unlike certain states where the testing provider supplies the electrical codebook, Ohio's Electrical Contractor trade exam requires candidates to bring permitted references.
Contractor Exam Preps sells Ohio Master Electrician study packages based on the 2023 NEC.
These are a closer edition match to the published PSI reference list than newer 2026 NEC packages.
Yes, a 2026 NEC package can be helpful for learning newer electrical code requirements.
However, exam-specific practice should use the code edition listed in the examination bulletin.
The published Ohio PSI Electrical Contractor reference list specifies the 2023 NEC.
Do not assume a newer code edition is automatically permitted during testing.
A rule that changes between editions can affect an examination answer.
Use 2026 books for updated-code education and choose 2023 NEC-based products for the closest match to the published examination.
The PSI examination includes nine official scored subject categories.
These nine categories total 100 scored questions.
Service Feeders and Branch Circuits is the largest category, with sixteen questions.
Several other categories contain twelve questions each.
That means contractors should prepare broadly rather than relying on one favorite subject.
This category contains ten questions.
Study voltage, current, resistance, power, and electrical circuit behavior.
Review Ohm's law.
Practice calculations involving watts, amperes, volts, resistance, and electrical power.
Understand single-phase and three-phase systems.
Review common electrical symbols and drawings.
Strong fundamentals make code questions and equipment calculations easier.
This category contains twelve questions.
Study transformer ratings, primary and secondary protection, conductor sizing, equipment installation, and related NEC requirements.
Review NEC Article 450.
Practice transformer calculations and understanding nameplate information.
Learn how different transformer configurations affect electrical distribution.
Review grounding and bonding requirements where relevant.
This is the largest official category, with sixteen questions.
Study NEC Articles 210, 215, and 230.
Review branch-circuit requirements, electrical feeders, service disconnecting means, and service equipment.
Practice load calculations and conductor selection.
Study overcurrent protection, grounding, and bonding for distribution systems.
Review GFCI and AFCI requirements where applicable.
Learn how electrical power moves from the service to panels and final loads.
This category contains ten questions.
Study conduit systems, raceway installation, electrical boxes, fittings, and panelboards.
Review NEC Chapter 9 for raceway fill.
Practice box-fill calculations using NEC Article 314.
Understand raceway support and protection from damage.
Review electrical panelboard installation requirements and equipment ratings.
This category contains twelve questions.
Study conductor ampacity, insulation temperature ratings, adjustment factors, and wiring materials.
Practice using NEC conductor ampacity tables.
Review voltage drop as a design consideration.
Understand conductor correction and adjustment requirements.
Learn why cable type and installation location affect permitted use.
Control Devices contains eight questions.
Study switches, relays, contactors, motor controllers, control circuits, disconnecting means, and equipment ratings.
Review practical control applications and basic wiring diagrams.
Learn how electrical controls operate equipment safely and reliably.
Motors and Generators contains twelve questions.
Review NEC Article 430.
Study motor full-load current, overload protection, branch-circuit protection, and disconnecting means.
Practice conductor and overcurrent device sizing for motor circuits.
Review generator-related installation and electrical protection concepts.
Understand how motor protection differs from ordinary branch-circuit protection.
This category contains eight questions.
Study equipment that uses electrical energy.
Examples include appliances, luminaires, heating equipment, receptacles, and other electrical devices.
Review equipment ratings, disconnects, installation methods, and protective requirements.
Understand how manufacturer instructions affect code-compliant installation.
This category contains twelve questions.
Study NEC Chapters 5 and 6, along with applicable special-condition rules.
Review hazardous locations, health care spaces, emergency equipment, specialized installations, and electrical systems requiring additional protection.
Understand that special locations may have requirements beyond ordinary wiring rules.
Practice locating the correct NEC article for unusual equipment and occupancies.
Ohio normally requires at least five years of qualifying experience as an electrical tradesperson immediately before the application is submitted.
The applicant must be at least eighteen years old.
Ohio permits certain alternative qualifications.
One route involves a currently registered Ohio professional engineer with three years of relevant construction-industry business experience.
The Board may also evaluate other acceptable experience under its regulations.
Applicants must submit documentation proving appropriate electrical work.
This can include tax records, permits, apprenticeship completion records, or other approved evidence.
General construction experience unrelated to electrical work is not automatically sufficient.
Yes. Candidates approved to take the electrical contractor exam must complete state and federal background checks.
These are generally referred to as BCI and FBI background checks.
OCILB approval and the background checks are time-sensitive.
The PSI bulletin states that examination eligibility is valid for one year.
Candidates should complete the required steps within the approved period.
Yes. Ohio requires a minimum of $500,000 in contractor liability coverage.
The contractor must maintain coverage under the appropriate contracting company name.
The license must be assigned to a contracting company according to Ohio law and Board procedures.
A state electrical contractor license does not eliminate local registration, permitting, or inspection requirements.
Ohio's published application fee is $25.
The PSI bulletin lists an examination registration fee of $69.
Examination fees should be checked at the time of scheduling, particularly when registering separately or retaking a portion.
A separate license issuance fee applies after examination success.
Background checks, insurance, continuing education, and local registrations may involve additional costs.
Ohio offers annual and three-year license renewal arrangements under applicable OCILB rules.
The published renewal fees are $60 annually or $180 for a three-year renewal.
Ohio Administrative Code Rule 4101:16-2-08 currently describes ten approved continuing education hours per year.
For a licensee holding only an electrical contractor license, at least five of those hours must involve approved electrical code instruction.
The remaining hours may cover approved safety, business, or technology subjects.
Licensees should confirm their individual continuing education cycle and accepted courses through OCILB.
Contractor Exam Preps offers Ohio-specific products built around the 2023 NEC.
The 2023 Ohio Master Electrician Super Combo includes an Ohio study guide, electrician calculations guide, 2023 NEC with tabs, and flash cards.
The 2023 Ohio Master Electrician Ultimate Combo adds an online test success kit and related preparation support.
The 2023 Ohio Master Electrician Calculations and NEC Combo offers a focused study option.
The store also carries Ohio Master Electrician Practice Exams based on the 2026 NEC.
Use the 2023 materials when matching the published PSI code edition.
Start with the official electrical trade outline.
Study the nine subject categories.
Spend extra time on services, feeders, branch circuits, conductors, transformers, motors, and special equipment.
Practice electrical calculations daily.
Use the 2023 NEC to build faster article and table navigation.
Review Ugly's Electrical References and the applicable field reference.
Study the Ohio Contractor's Business and Law examination separately.
Practice estimating, contracts, safety, licensing, financial management, and personnel regulations.
Complete timed practice tests for both portions.
Good preparation should make you more comfortable using the correct rules under a time limit.
Important Ohio Electrical Contractor Exam Update: The publicly available PSI Ohio Construction Industry Licensing Board examination bulletin specifies 100 scored Electrical Contractor questions, ten unscored pretest items, four hours, and 70% passing. The separate Ohio Contractor's Business and Law exam contains 50 scored questions, five unscored pretest items, two hours, and 70% passing. The electrical trade reference list specifies the 2023 NEC or 2023 NEC Handbook, Ugly's Electrical References 2023, and a listed electrical field reference. Candidates bring their own approved electrical trade books. PSI supplies the Ohio NASCLA Business and Law reference in the testing center. Ohio's official statewide credential is Electrical Contractor, also referred to as a Master License. Store products based on the 2026 NEC may support updated-code learning, but candidates should use the 2023 NEC for preparation aligned with the published trade bulletin. Verify any newly issued PSI instructions before your scheduled test.
Ohio's statewide Electrical Contractor license authorizes qualifying commercial electrical contracting activity within the scope established by state law.
The term Master Electrician is often used when discussing experienced electricians or high-level electrical contractor qualifications.
Ohio's OCILB also refers to its issued contractor credentials as Master Licenses.
The official statewide classification is Electrical Contractor.
Residential electrician and contractor requirements may vary by city or local building department.
Always distinguish the state commercial contractor license from any separate local credential.
State license: Electrical Contractor.
Common term: Master Electrician.
State licensing board: OCILB.
Examination provider: PSI.
Required exam parts: Electrical Contractor and Business and Law.
State focus: Commercial electrical contracting.
| Requirement | Ohio Information | What to Prepare |
|---|---|---|
| State | Ohio | Follow OCILB requirements. |
| Official Credential | Electrical Contractor | Apply for state electrical classification. |
| Alternative Term | Master License | State Board also uses this term. |
| Licensing Authority | OCILB | Ohio Construction Industry Licensing Board. |
| Department | Ohio Department of Commerce | Division of Industrial Compliance. |
| Minimum Age | 18 | Verify eligibility. |
| Standard Experience | Five Years | Electrical tradesperson work. |
| Experience Timing | Immediately Before Application | Other recognized pathways may apply. |
| Engineer Alternative | Ohio Registered Engineer | Three years relevant business experience. |
| Other Alternatives | OCILB-Approved | Check Rule 4101:16-2-01. |
| Work Documents | Tax, Permit, or Training Records | Gather proof of qualifying trade experience. |
| Exam Application | $25 | Submit notarized application. |
| Board Approval | Required | Apply before PSI scheduling. |
| State Background Check | BCI | Complete as instructed. |
| Federal Background Check | FBI | Complete as instructed. |
| Eligibility Period | One Year | Schedule within approval window. |
| Testing Provider | PSI | Schedule after approval. |
| Trade Exam | Electrical Contractor | Study electrical blueprint. |
| Trade Scored Questions | 100 | 70 correct needed. |
| Trade Pretest Items | 10 | Unscored. |
| Trade Time | 240 Minutes | Four-hour practice tests. |
| Trade Passing | 70% | 70 of 100 scored items. |
| Trade Open Book | Yes | Bring approved books. |
| Approved NEC | 2023 | NEC or NEC Handbook. |
| Ugly's Reference | 2023 | Approved trade reference. |
| Field Reference | Approved Option | See PSI reference list. |
| Business and Law | Required | Separate examination portion. |
| Business Questions | 50 Scored | Plus five pretest items. |
| Business Time | 120 Minutes | Two-hour practice. |
| Business Passing | 70% | 35 correct. |
| Business Reference | Ohio NASCLA 4th Edition | PSI provides book at testing center. |
| PSI Fee | $69 Published Per Registration | Verify at scheduling. |
| Retest Waiting | 60 Days | After failed portion. |
| Retest Limit | Five Per Year | Follow PSI rules. |
| Liability Insurance | $500,000 Minimum | Maintain coverage. |
| Company Assignment | Required | Use proper contracting company. |
| License Issuance | Separate Fee | Complete OCILB issuance process. |
| Annual Renewal | $60 | Maintain license. |
| Three-Year Renewal | $180 | When using triennial renewal. |
| Continuing Education | 10 Hours Per Year | Subject to current OCILB requirements. |
| Electrical Code CE | At Least Five Hours | For electrical-only licensees. |
| Local Permits | May Apply | Check local building department. |
| Detail | Category | Information |
|---|---|---|
| State Credential | License | Electrical Contractor |
| Board | License | OCILB |
| Testing Provider | Exam | PSI |
| Trade Scored Questions | Electrical | 100 |
| Trade Pretest | Electrical | 10 |
| Trade Presented | Electrical | 110 |
| Trade Time | Electrical | Four Hours |
| Trade Pass | Electrical | 70% |
| Business Scored Questions | Business | 50 |
| Business Pretest | Business | 5 |
| Business Presented | Business | 55 |
| Business Time | Business | Two Hours |
| Business Pass | Business | 70% |
| Combined Scored | Exam | 150 |
| Combined Presented | Exam | 165 |
| Electrical Knowledge | Trade | 10 Questions |
| Transformers and Equipment | Trade | 12 Questions |
| Services, Feeders, Branch Circuits | Trade | 16 Questions |
| Raceways, Boxes, Panelboards | Trade | 10 Questions |
| Conductors and Cables | Trade | 12 Questions |
| Control Devices | Trade | 8 Questions |
| Motors and Generators | Trade | 12 Questions |
| Utilization Equipment | Trade | 8 Questions |
| Special Occupancies and Equipment | Trade | 12 Questions |
| Business Organization | Business | 2 Questions |
| Licensing | Business | 3 Questions |
| Estimating and Bidding | Business | 8 Questions |
| Contract Management | Business | 5 Questions |
| Project Management | Business | 4 Questions |
| Insurance and Bonding | Business | 5 Questions |
| OSHA and Safety Records | Business | 5 Questions |
| Personnel Regulations | Business | 5 Questions |
| Financial Management | Business | 6 Questions |
| Tax Laws | Business | 5 Questions |
| Lien Laws | Business | 2 Questions |
| Trade NEC | Reference | 2023 NEC or NEC Handbook |
| Ugly's Electrical References | Reference | 2023 |
| Electrical Field Reference | Reference | Listed PSI Option |
| Business Book | Reference | Ohio NASCLA 4th Edition |
| Trade Book Source | Reference | Candidate Brings Approved Books |
| Business Book Source | Reference | PSI Provides Approved Book |
| Examination Fee | Fees | $69 Per Registration Published |
Study electrical theory, Ohm's law, power formulas, circuits, voltage, current, resistance, electrical symbols, calculations, and equipment fundamentals.
Review transformer ratings, conductor sizing, overcurrent protection, secondary circuits, equipment installation, and appropriate code requirements.
Study load calculations, electrical service equipment, feeder conductors, branch-circuit requirements, disconnecting means, and electrical distribution.
Review conduit, raceway fill, box fill, raceway support, wiring methods, panelboards, fittings, and electrical enclosures.
Study conductor ampacity, insulation ratings, correction factors, temperature limitations, wiring types, conductor selection, and installation requirements.
Study switches, relays, motor controls, contactors, starters, control circuits, disconnecting means, and equipment ratings.
Review NEC Article 430, motor full-load currents, overload protection, branch-circuit protection, motor controllers, generators, and electrical equipment.
Study receptacles, luminaires, appliances, equipment ratings, disconnects, and other equipment that uses electrical energy.
Review special electrical installations, hazardous areas, equipment rules, emergency systems, and specialized wiring applications.
Total: 100 scored trade questions.
Largest topic: Services, Feeders, and Branch Circuits, 16 questions.
Four 12-question subjects: Transformers and Equipment; Conductors and Cables; Motors and Generators; Special Occupancies and Equipment.
Passing: 70%.
Begin with the current official OCILB and PSI examination requirements.
Study the Electrical Contractor exam blueprint carefully.
Organize your 2023 NEC reference by article and subject.
Practice general electrical theory and power calculations.
Review transformers, services, feeders, and branch circuits.
Spend extra time on conductor ampacity and motor protection.
Practice raceway fill and box fill.
Review specialized occupancies and electrical equipment.
Learn how to navigate Ugly's Electrical References.
Study the approved field reference option.
For Business and Law, review Ohio licensing, contracts, estimating, financial management, insurance, bonding, and construction law.
Practice questions with a timer.
Use the 2023 Ohio Master Electrician Ultimate Combo for code-based technical review, calculations, flash cards, and online test practice.
Technical priority: Services, feeders, branch circuits, transformers, conductors, motors, and special equipment.
Reference priority: 2023 NEC and listed PSI electrical references.
Business priority: Estimating, contracts, finances, licensing, safety, and insurance.
Practice: Complete both the four-hour trade exam and two-hour Business and Law simulations.
This simplified diagram shows major electrical distribution equipment and the relationship between services, feeders, panels, and final loads.
Educational diagram only. Actual installations require properly designed and code-compliant equipment, grounding, bonding, protection, and conductors.
Review the statewide OCILB Electrical Contractor license and check whether your city has additional requirements.
Document the required qualifying five years or an accepted alternative under Ohio's licensing rules.
Prepare the notarized application, supporting documentation, and the applicable application fee.
Follow OCILB instructions for required BCI and FBI checks before taking the examination.
Study electrical theory, calculations, code lookup, trade questions, and the official Business and Law outline.
Earn at least 70% on the Electrical Contractor trade exam and the Contractor's Business and Law exam.
Provide the required $500,000 minimum contractor liability insurance and follow company assignment procedures.
Submit remaining fees and paperwork, meet local requirements, and maintain continuing education and renewal compliance.
These categories and percentages reflect the official 100-scored-question electrical trade examination outline.
Official total: 100 scored questions.
Additional pretest items: 10.
Largest subject: Service Feeders and Branch Circuits.
Time: 240 minutes.
Passing: 70%.
| Book or Reference | Edition | Exam-Day Rule |
|---|---|---|
| NFPA 70 National Electrical Code | 2023 | Approved Electrical Contractor trade reference. Candidate supplies. |
| National Electrical Code Handbook | 2023 | Approved alternate or companion to 2023 NEC. |
| Ugly's Electrical References | 2023 | Approved electrical field reference. |
| Electrical Field Reference Handbook | Revised for NEC 2008 | Listed approved field reference option. |
| IBEW-NECA Field Reference Book | Listed Reference | Alternative to Electrical Field Reference Handbook. |
| Contractor's Guide to Business, Law, and Project Management, Ohio | 4th Edition | Business and Law reference provided by PSI. Personal approved copy may also be brought. |
| 2023 Ohio Master Electrician Study Guide | 2023 NEC-Based | Study resource, not an additional authorized exam-room book. |
| 2023 Electrician Calculations Study Guide | 2023 | Study and calculation practice. |
| 2023 Master Electrician Flash Cards | 2023 | Study resource, not an exam-room reference. |
| 2026 Ohio Master Electrician Study Guide | 2026 NEC-Based | Updated-code study; not a replacement for PSI's 2023 NEC reference. |
| 2026 NEC Paperback | 2026 | Not the code edition listed for the published Ohio PSI exam. |
Electrical trade: Bring permitted reference books yourself.
2023 NEC: The published approved edition.
Business and Law: PSI provides the Ohio NASCLA 4th Edition at the testing center.
Book marking: Prior highlighting, underlining, and indexing are allowed. Writing during testing and extra loose or attached papers are prohibited.
Ohio permits approved reference books during testing.
That is useful when you know where the information is located.
It becomes a problem when you spend several minutes searching for every answer.
Learn the 2023 NEC organization and approved reference tables.
Practice finding articles quickly without relying entirely on tabs.
For Business and Law, become familiar with the Ohio NASCLA 4th Edition.
Plan separate study sessions for both examination portions.
Ohio's statewide Electrical Contractor license supports electrical contracting within the commercial scope defined by Ohio law.
Electrical work may involve installations, alterations, repairs, and changes to wiring, equipment, appliances, fixtures, conduits, and associated electrical systems.
Commercial projects may include electrical services, feeders, branch circuits, panels, transformers, motors, and lighting.
All installations must meet applicable code, permit, and inspection requirements.
The statewide license does not remove every local registration or permitting obligation.
Residential electrical licensing and permit requirements can depend on the city or local building department.
Contractors should review the project jurisdiction before performing work.
Official license: Electrical Contractor.
Primary scope: State-regulated commercial electrical contracting.
Board: OCILB.
Local rules: May also apply.
Insurance: At least $500,000 contractor liability coverage.
| License or Term | Purpose | Important Difference |
|---|---|---|
| Ohio Electrical Contractor | Statewide commercial electrical contracting. | OCILB-issued state license. |
| Master Electrician | Common advanced electrician terminology. | Not a separate statewide OCILB individual license classification. |
| OCILB Master License | Common Board term for issued contractor credentials. | Refers to a state contractor license. |
| Local Master Electrician | City or local electrical credential, where established. | Rules depend on jurisdiction. |
| Local Journeyman Electrician | Local trade qualification, where required. | Not equivalent to OCILB state contractor license. |
| Electrical Contractor PSI Exam | State electrical trade knowledge. | 100 scored questions, four hours, 70%. |
| Ohio Contractor's Business and Law | Business and legal knowledge. | 50 scored questions, two hours, 70%. |
| Electrical Contracting Company Assignment | Business licensing compliance. | Separate administrative requirement. |
100 Scored • 10 Pretest • 240 Minutes
50 Scored • 5 Pretest • 120 Minutes
Five Years Experience • $500,000 Liability • Background Checks
The Ohio Electrical Contractor examination covers many different electrical subjects.
Candidates must answer 100 scored questions within four hours.
There are also ten additional unscored pretest items.
Service Feeders and Branch Circuits is the largest subject.
Transformers, conductors, motors, and special equipment also carry significant weight.
Many questions require more than remembering a definition.
Candidates may need to locate a code requirement, interpret a table, and apply it to an installation.
The open-book format is helpful, but unfamiliar references can slow you down.
Business and Law adds another examination covering contracts, financial decisions, insurance, and regulation.
Experienced electricians often have strong practical skills.
Turning those skills into consistent performance on a timed examination requires practice.
The best preparation includes reading, calculations, reference navigation, timed questions, and review of mistakes.
Contractor Exam Preps offers Ohio-specific Master Electrician study products that support NEC review, electrical calculations, reference navigation, and exam-style preparation.
The 2023 NEC packages below are especially relevant because the published Ohio PSI Electrical Contractor exam reference list uses the 2023 National Electrical Code.
Study Guide • Calculations • 2023 NEC • Tabs • Flash Cards
Best for: Electricians who want a coordinated Ohio-focused technical study package using the same NEC edition listed in the published PSI bulletin.
Study Books • Online Test Success Kit • 2023 NEC
Best for: Candidates who want books and online practice support together.
Master Study Guide • Electrical Calculations • 2023 NEC
Best for: Electricians who want focused code and electrical calculation preparation without purchasing the largest package.
Best edition match: Ohio Master Electrician packages based on the 2023 NEC.
Updated-code study: The store also sells Ohio Master Electrician products based on the 2026 NEC.
Business and Law: Study the Ohio Contractor's Guide to Business, Law, and Project Management, 4th Edition, identified in the PSI bulletin.
Exam-room distinction: Study guides and flash cards are preparation materials, not automatically approved testing references.
Ohio Master Electrician product image sourced directly from ContractorExamPreps.com.
The image is loaded from the store's own Ohio 2023 Master Electrician Super Combo product listing. It represents a related study package rather than a state-issued Electrical Contractor license.
Ohio Electrical Contractor • OCILB • PSI • 2023 NEC • Master License • Business and Law • Electrical Calculations
Ohio Master Electrician and Contractor Licensing
Ohio's statewide commercial electrical credential is officially called Electrical Contractor. The Board also refers to its contractor credentials as Master Licenses. Local master electrician qualifications may be different.
The Ohio Construction Industry Licensing Board, part of the Ohio Department of Commerce, Division of Industrial Compliance.
Applicants must be at least eighteen years old and meet the other qualifications established by OCILB.
The standard route requires five years of qualifying electrical tradesperson experience immediately before application. Ohio regulations also describe certain accepted alternative routes.
Ohio recognizes a pathway for a currently registered Ohio professional engineer with three years of relevant construction-industry business experience. Applicants must still meet OCILB requirements.
Yes. Board-approved examination candidates must complete the required state and federal background checks according to OCILB instructions.
Ohio Electrical Contractor PSI Examination
The PSI examination contains 100 scored electrical trade questions.
Yes. The bulletin lists ten additional unscored pretest questions for the Electrical Contractor exam.
Candidates have four hours, or 240 minutes.
The required passing score is 70%, or 70 correct answers on the 100 scored trade questions.
Yes. Candidates may bring approved references listed in the PSI bulletin.
No. The Ohio PSI bulletin states that electrical trade candidates are responsible for bringing their own approved references.
NEC Editions and Electrical Subjects
The publicly available Ohio Electrical Contractor PSI bulletin specifies the 2023 National Electrical Code or the 2023 NEC Handbook.
Yes. PSI's reference list states that either 2023 publication is sufficient, and both may be used together.
Yes. Ugly's Electrical References, 2023 edition, is included in the current published PSI reference list.
You can use it for updated-code study. However, the published Ohio PSI exam reference list specifies the 2023 NEC. Verify any newer bulletin before bringing a different edition to the testing center.
Service Feeders and Branch Circuits is the largest category, with sixteen scored questions.
Transformers and Equipment contains twelve scored questions.
Yes. Motors and Generators contains twelve questions. NEC Article 430 and motor-related calculations are important study subjects.
Yes. Special Occupancies and Equipment contains twelve scored questions.
Ohio Business and Law
Yes. Ohio requires the separate Contractor's Business and Law exam in addition to the electrical trade exam for normal commercial contractor licensure.
There are fifty scored questions plus five unscored pretest questions.
The time limit is two hours, or 120 minutes.
The passing score is 70%, meaning at least 35 correct answers on the fifty scored questions.
Contractor's Guide to Business, Law, and Project Management, Ohio, 4th Edition, is the specified reference.
Yes. PSI supplies the approved Ohio NASCLA 4th Edition during Business and Law testing. Candidates may also bring their own compliant approved copy.
Estimating and Bidding is the largest topic, with eight scored questions.
Application, Fees, and Renewal
The current administrative rule lists a $25 application fee.
The publicly available PSI bulletin lists $69 per examination registration. Verify current scheduling charges directly with PSI.
The PSI bulletin states that OCILB examination approval is valid for one year.
The PSI bulletin states that candidates must wait sixty days after a failed examination portion and permits up to five retests in one year.
Ohio requires a minimum of $500,000 in contractor liability coverage.
Ohio Administrative Code Rule 4101:16-2-08 currently describes ten approved continuing education hours per year. Electrical-only licensees need at least five electrical code hours. Confirm your renewal requirements with OCILB.
Contractor Exam Preps Products
Yes. The store offers Ohio-specific Master Electrician study guides, electrical calculations books, NEC packages, flash cards, and online preparation.
Yes. The 2023 Ohio Master Electrician Super Combo includes the Ohio guide, calculations guide, 2023 NEC paperback with tabs, and flash cards.
The 2023 package includes a Master Electrician study guide, Electrician Calculations guide, 2023 NEC paperback with tabs, flash cards, online test success kit, and the course access and support described on the product page.
Yes. The store also offers 2026 NEC-based Ohio Master Electrician study products. Candidates should distinguish updated-code study from the 2023 NEC edition specified by the published PSI examination bulletin.
No. Study resources support preparation but do not guarantee examination results, Board approval, or issuance of an Ohio Electrical Contractor license.
Watch this related 1ExamPrep video about Master Electrician exam preparation, electrical calculations, codebook navigation, and study techniques.
The video covers general advanced electrician preparation.
It is not an official Ohio OCILB or PSI examination tutorial.
It discusses newer 2026 NEC study resources. Ohio candidates should use the 2023 NEC edition listed in the published PSI trade exam bulletin for exam-specific preparation.
Creator: 1ExamPrep.
Video: 2026 Master Electrician Exam Prep License Study Guide.
Study subjects: NEC navigation, electrical calculations, trade knowledge, and exam preparation.
Ohio credential: Electrical Contractor.
Official published trade exam code: 2023 NEC.
Trade format: 100 scored questions, 240 minutes, 70% passing.
Use OCILB and PSI for examination approval, current reference editions, business licensing, continuing education, and renewal instructions.
Use Contractor Exam Preps for Ohio Master Electrician study materials, calculations books, practice examinations, NEC packages, and flash cards.
Official credential: Ohio Electrical Contractor.
Trade examination: 100 scored, ten unscored, four hours, 70% passing.
Business and Law: 50 scored, five unscored, two hours, 70% passing.
Published trade reference: 2023 NEC.
Best store edition match: Ohio 2023 NEC-based Master Electrician packages.
Licensing: OCILB approval, qualifying experience, exams, liability insurance, and other requirements.
Preparing for Ohio Electrical Contractor licensing is an important goal for experienced electricians who want to take on greater responsibility in the electrical contracting field.
Electrical contractors install and manage systems that provide power, lighting, controls, and equipment connections throughout commercial buildings.
These systems include services, feeders, branch circuits, transformers, motors, generators, panelboards, conductors, raceways, and many types of electrical equipment.
Correct electrical installation requires safety, training, careful calculations, and an understanding of code requirements.
Ohio regulates its statewide commercial electrical contractors through the Ohio Construction Industry Licensing Board.
OCILB operates under the Ohio Department of Commerce.
The official statewide license is Electrical Contractor.
The Board also refers to its contractor licenses as Master Licenses.
This explains why Master Electrician is commonly used as a study term.
However, an Ohio statewide Electrical Contractor license is not the same as every local Master Electrician or Journeyman Electrician credential.
Some cities and local authorities have additional rules.
Applicants should check the specific requirements in the jurisdiction where they plan to work.
The normal OCILB qualification pathway includes five years of appropriate electrical tradesperson experience.
Applicants must be at least eighteen.
The Board also recognizes certain alternative experience and engineering pathways.
Applicants must provide adequate proof of qualifying electrical work.
The licensing process includes an application, Board approval, and required background checks.
Candidates must complete the state and federal background check procedures before taking their examinations.
PSI administers the Electrical Contractor and Business and Law examinations.
The Electrical Contractor trade examination contains 100 scored questions.
It also includes ten unscored pretest items.
Candidates have four hours.
The passing score is 70%.
That means 70 correct answers are required on the scored questions.
The Business and Law examination contains 50 scored questions and five unscored pretest items.
It allows two hours.
The required passing score is also 70%.
Passing both portions is part of the state's normal electrical contractor licensing process.
The Electrical Contractor trade examination covers nine official subject categories.
General Electrical Knowledge includes ten questions.
Transformers and Equipment includes twelve.
Service Feeders and Branch Circuits includes sixteen.
Raceways, Boxes, and Panelboards includes ten.
Conductors and Cables includes twelve.
Control Devices includes eight.
Motors and Generators includes twelve.
Utilization Equipment includes eight.
Special Occupancies and Equipment includes twelve.
Together these subjects total 100 scored questions.
Services, Feeders, and Branch Circuits is the largest category.
Candidates should spend consistent time studying electrical distribution, load calculations, feeder conductors, service disconnects, and branch-circuit rules.
Transformers and Equipment also deserve attention.
Review transformer ratings, conductor sizing, overcurrent devices, and equipment installation requirements.
Conductors and Cables includes ampacity tables, insulation ratings, temperature adjustments, and wiring methods.
Motors and Generators includes motor currents, overload protection, controllers, disconnecting means, and generator-related rules.
Raceways, Boxes, and Panelboards includes conduit fill, box fill, wiring methods, and electrical equipment installation.
Control Devices covers switching and control equipment.
Utilization Equipment includes electrical devices and equipment that use electrical power.
Special Occupancies and Equipment includes installations that require additional code attention.
Electrical calculations are important throughout these subjects.
Candidates should practice load calculations, conductor ampacity, service sizing, transformer calculations, and motor protection.
Grounding and bonding principles are also important, even when included within broader trade categories.
The Ohio Electrical Contractor trade examination is open book.
However, the candidate must provide approved reference materials.
The publicly available PSI bulletin specifies the 2023 National Electrical Code or 2023 NEC Handbook.
It allows Ugly's Electrical References, 2023, and certain approved electrical field references.
Candidates should study the code articles and tables before testing.
They should practice using the table of contents, index, definitions, and applicable rules.
Prior highlighting, underlining, and reference indexing may be permitted.
Writing in books during testing and bringing loose or attached notes are not allowed.
Business and Law preparation is equally important.
Its subjects include business organization, licensing, estimating, bidding, contract management, project management, insurance, bonding, OSHA safety, personnel regulations, financial management, tax laws, and liens.
Estimating and Bidding is the largest Business and Law category, with eight questions.
The approved Business and Law reference is Contractor's Guide to Business, Law, and Project Management, Ohio, 4th Edition.
PSI provides the book in the testing center.
Candidates may also bring their own approved copy.
Contractor Exam Preps sells several Ohio-specific Master Electrician study packages.
The 2023 Ohio Master Electrician Super Combo includes the Ohio guide, electrical calculations study guide, 2023 NEC paperback with tabs, and flash cards.
The 2023 Ohio Master Electrician Ultimate Combo provides additional online test preparation and course support.
The 2023 Ohio Master Electrician Calculations and NEC Combo is another focused study option.
The store also offers newer 2026 NEC-based Ohio Master Electrician materials.
These books can support updated-code learning.
However, students should distinguish newer code education from the approved 2023 NEC examination reference.
Ohio also requires contractor liability insurance.
The minimum coverage is $500,000.
The license must be assigned to the appropriate contracting company.
Contractors must maintain licensing, renewal, and continuing education compliance.
They should also follow local registration and permitting requirements.
A six-week study plan can make the preparation process easier to manage.
Start with electrical theory and licensing rules.
Continue with services, feeders, conductors, transformers, and motors.
Study raceways, equipment, and specialized installation rules.
Prepare separately for Business and Law.
Finish with timed practice examinations and a review of mistakes.
With consistent study, the correct references, and a clear understanding of Ohio licensing requirements, candidates can approach the Electrical Contractor examination with greater confidence.
Ohio Master Electrician Contractor Exam Prep helps experienced electrical professionals prepare for the state's Electrical Contractor examination and licensing process.
The official statewide electrical contractor credential is issued by the Ohio Construction Industry Licensing Board.
OCILB is part of the Ohio Department of Commerce, Division of Industrial Compliance.
The state commonly refers to its contractor licenses as Master Licenses.
This is why many electricians use the phrase Master Electrician when discussing advanced electrical contractor preparation.
Ohio's statewide license primarily regulates commercial electrical contracting work.
Local cities and building departments may have additional electrical licensing, registration, permit, and inspection requirements.
Applicants normally need five years of qualifying electrical tradesperson experience.
They must be at least eighteen years old.
Some engineering or alternative experience pathways may be accepted under Ohio's licensing regulations.
Applicants should provide supporting records that demonstrate their electrical work history.
They must submit the proper examination application.
OCILB reviews and approves eligibility.
State and federal background checks are also required.
After approval, applicants schedule the examination through PSI.
Ohio's normal Electrical Contractor examination process has two required parts.
The first is the Electrical Contractor trade examination.
The second is the Ohio Contractor's Business and Law examination.
Both require a passing score of 70%.
The electrical trade examination contains 100 scored questions.
Ten additional unscored pretest questions are included.
Candidates have four hours.
They need at least seventy correct scored answers to pass.
The Business and Law examination contains fifty scored questions and five pretest items.
Candidates have two hours.
Thirty-five correct scored answers are needed to meet the 70% passing requirement.
The Electrical Contractor examination covers nine official subject categories.
General Electrical Knowledge contains ten questions.
Transformers and Equipment contains twelve questions.
Service Feeders and Branch Circuits contains sixteen questions.
Raceways, Boxes, and Panelboards contains ten questions.
Conductors and Cables contains twelve questions.
Control Devices contains eight questions.
Motors and Generators contains twelve questions.
Utilization Equipment contains eight questions.
Special Occupancies and Equipment contains twelve questions.
These categories total one hundred scored questions.
Service Feeders and Branch Circuits is the largest subject.
Contractors should study NEC Articles 210, 215, and 230.
They should practice service and feeder calculations.
They should also review branch-circuit requirements, electrical distribution, and protective equipment.
Transformers and Equipment includes transformer ratings, equipment sizing, and installation rules.
Conductors and Cables includes ampacity, temperature ratings, insulation, and wiring methods.
Motors and Generators includes equipment protection, motor full-load currents, controllers, and disconnecting means.
Raceways, Boxes, and Panelboards includes conduit sizing, raceway fill, electrical boxes, and panelboard installation.
Control Devices covers switches, relays, contactors, and electrical controls.
Utilization Equipment covers electrical devices that use power.
Special Occupancies and Equipment includes electrical installations subject to additional NEC requirements.
Electrical calculations should be practiced throughout preparation.
Important skills include load calculations, conductor sizing, overcurrent protection, box fill, conduit fill, motor calculations, and transformer calculations.
The electrical trade examination is open book.
Candidates are responsible for bringing approved references.
The published Ohio PSI bulletin specifies the 2023 National Electrical Code or 2023 NEC Handbook.
Either may be used alone, or both may be used together.
Ugly's Electrical References, 2023, is also listed.
PSI allows an electrical field reference option such as the Electrical Field Reference Handbook or IBEW-NECA Field Reference Book.
Candidates should review the full approved reference list before testing.
Approved personal references may be highlighted and indexed before the examination.
Writing in them during testing is prohibited.
Loose or attached extra papers are not permitted.
Ohio Business and Law is a separate subject that covers the business responsibilities of an electrical contractor.
Its categories include business organization, licensing, estimating, bidding, contracts, project management, insurance, bonding, OSHA safety, personnel rules, finances, taxes, and lien law.
The approved reference is Contractor's Guide to Business, Law, and Project Management, Ohio, 4th Edition.
PSI provides that book during the Business and Law examination.
Applicants should practice this portion separately from the technical electrical test.
Contractor Exam Preps offers Ohio-specific electrical preparation products.
The 2023 Ohio Master Electrician Super Combo includes a Master Electrician study guide, Electrician Calculations Study Guide, 2023 NEC paperback with tabs, and flash cards.
The 2023 Ohio Master Electrician Ultimate Combo adds online exam preparation and the support described by the store.
The Ohio Master Electrician Calculations and NEC Combo provides another focused study package.
These 2023 NEC packages are relevant to the code edition listed in the published PSI examination bulletin.
The store also offers 2026 NEC-based Ohio Master Electrician books for newer code-cycle education.
Exam candidates should confirm the latest approved references before deciding which books to bring to the test center.
Ohio Electrical Contractor licensing involves more than passing exams.
Applicants must meet qualifying experience and background-check requirements.
They must provide the required application and fees.
They must maintain at least $500,000 in contractor liability insurance.
The license must be associated with the appropriate contracting company.
Local permits and registrations may also apply.
Ohio requires ongoing continuing education and license renewal.
The current administrative rule describes ten approved continuing education hours per year, including at least five electrical code hours for electrical-only licensees.
Applicants should verify their renewal obligations directly with OCILB.
A six-week study schedule can organize preparation.
The first week can cover electrical theory and licensing requirements.
The second can focus on services, feeders, and conductors.
The third can cover transformers, motors, and control devices.
The fourth can review raceways, equipment, and special occupancies.
The fifth can address Business and Law.
The final week can focus on full timed examinations and review of weak subjects.
Regular practice with the approved 2023 NEC, electrical calculation problems, and realistic test questions can strengthen preparation.
With appropriate experience, organized study materials, and careful attention to Ohio's licensing requirements, electricians can move toward the Electrical Contractor examination with greater confidence.
Explore Ohio Master Electrician study guides, electrical calculations, 2023 NEC books, flash cards, practice examinations, and contractor exam resources at ContractorExamPreps.com.