NYC Department of Buildings • Closed-Book Written Exam • Practical Skills • 2025 NYC Electrical Code
Welcome to a practical contractor licensing and examination guide prepared for Contractor Exam Preps. New York does not operate one uniform statewide Master Electrician examination or license. New York City licenses Master Electricians through the Department of Buildings and requires both written and practical exams. Other municipalities in New York may have their own rules. This blog uses New York City's process as a specific example, not as an exam specification for all New York locations.
The examination and legal licensing process can look similar across states, but the details can be very different. New York licensing varies by city and county. This guide uses NYC as a specific local example and does not imply every New York municipality follows the NYC exam.
The 2025 New York City Electrical Code took full effect December 21, 2025 and incorporates NYC amendments to the 2020 NEC. The NYC exam provider's published content outline still references NYC Electrical Code 2011, based on the 2008 NEC. Because the two documents are not synchronized, confirm the code basis for your scheduled exam with the exam administrator. The 2026 NEC in store study packages is not automatically the NYC exam code. NYC's written exam is CLOSED BOOK, 80 questions, 180 minutes, 70% to pass; a separate practical exam is also required.
Experienced electricians know how much responsibility sits behind a commercial service installation. Choosing conductors, sizing feeders, grounding equipment and coordinating motors requires math, code knowledge and careful workmanship.
Master-level electrical licensing is different in New York because licensing is not controlled by one statewide electrician board. New York City has a formal Department of Buildings examination, but other jurisdictions can use their own licensing system.
The NYC Master Electrician license permits contracting work throughout the city within the authorized scope. A Special Electrician license is different: it is tied to work on specific buildings or premises.
Before purchasing reference books, identify the licensing authority where you plan to operate. A city examination specification should not be used as if it applied everywhere in New York.
New York City uses a written and practical examination process. The written test is closed book and focuses on NYC electrical code, rules, technical knowledge and calculations.
The practical test is distinct from a multiple-choice exam. It tests plan reading, bending, lighting, starters, meters and motor work, with separate time limits.
The city adopted a 2025 NYC Electrical Code effective December 21, 2025, based on the 2020 NEC with city amendments. An older exam-provider outline still names the 2011 NYC code, so candidates need current exam-administrator guidance.
NEC 2026 books on Contractor Exam Preps provide technical learning and code navigation practice at home. They are not a replacement for the currently adopted city code and cannot be brought into the NYC closed-book examination.
The current NYC DOB site lists separate exam payment fees of $585 written and $530 practical, and applications are handled through the DOB NOW public portal.
Use a schedule that balances code concepts, mental recall, calculation drills and hands-on practical preparation. A good calculator answer is less useful if you cannot perform a practical meter task safely.
NYC published written-test category. Study branch circuits, feeders, service calculations, grounding and bonding, required outlets, overcurrent protection and surge equipment.
For exam preparation, identify the relevant definitions, work through practical examples and practice the associated code or calculation steps. When an exam topic depends on local requirements, compare your study book with the current official examination instructions before deciding what is permitted.
Study wiring methods, conductor installation, equipment, cable and conduit types, enclosures, boxes, motors, general-use equipment and specialized installation practices.
For exam preparation, identify the relevant definitions, work through practical examples and practice the associated code or calculation steps. When an exam topic depends on local requirements, compare your study book with the current official examination instructions before deciding what is permitted.
Review conduit fill, equipment and installation requirements, communication systems, special systems and applicable NYC administrative rules.
For exam preparation, identify the relevant definitions, work through practical examples and practice the associated code or calculation steps. When an exam topic depends on local requirements, compare your study book with the current official examination instructions before deciding what is permitted.
Review hazardous locations, special occupancies, emergency systems, fire alarm circuits, solar equipment, special equipment and wiring conditions.
For exam preparation, identify the relevant definitions, work through practical examples and practice the associated code or calculation steps. When an exam topic depends on local requirements, compare your study book with the current official examination instructions before deciding what is permitted.
Study a timed 50-minute electrical plan-reading assessment, with a required 71% passing score.
For exam preparation, identify the relevant definitions, work through practical examples and practice the associated code or calculation steps. When an exam topic depends on local requirements, compare your study book with the current official examination instructions before deciding what is permitted.
Perform the hands-on bending exercise with a 20-minute limit.
For exam preparation, identify the relevant definitions, work through practical examples and practice the associated code or calculation steps. When an exam topic depends on local requirements, compare your study book with the current official examination instructions before deciding what is permitted.
Practice lighting circuit assembly and interpretation of specifications with a 20-minute limit.
For exam preparation, identify the relevant definitions, work through practical examples and practice the associated code or calculation steps. When an exam topic depends on local requirements, compare your study book with the current official examination instructions before deciding what is permitted.
Practice motor-starter controls, wiring and identification of components with a 20-minute limit.
For exam preparation, identify the relevant definitions, work through practical examples and practice the associated code or calculation steps. When an exam topic depends on local requirements, compare your study book with the current official examination instructions before deciding what is permitted.
Practice safe electrical meter identification and testing concepts under a 20-minute limit.
For exam preparation, identify the relevant definitions, work through practical examples and practice the associated code or calculation steps. When an exam topic depends on local requirements, compare your study book with the current official examination instructions before deciding what is permitted.
Practice motor connections and relevant controls under a 20-minute limit.
For exam preparation, identify the relevant definitions, work through practical examples and practice the associated code or calculation steps. When an exam topic depends on local requirements, compare your study book with the current official examination instructions before deciding what is permitted.
Contractor Exam Preps offers state-focused study guides, electrical calculation review, NEC study references and flash cards. Practice exams and codebook navigation can build confidence, but an exam-room code edition must match the regulating authority’s approved list.
Important: The New York City Master Electrician license is only one local jurisdiction example. Always verify your own New York city or county licensing requirements.
Important 2026 licensing and exam update: The 2025 New York City Electrical Code took full effect December 21, 2025 and incorporates NYC amendments to the 2020 NEC. The NYC exam provider's published content outline still references NYC Electrical Code 2011, based on the 2008 NEC. Because the two documents are not synchronized, confirm the code basis for your scheduled exam with the exam administrator. The 2026 NEC in store study packages is not automatically the NYC exam code. NYC's written exam is CLOSED BOOK, 80 questions, 180 minutes, 70% to pass; a separate practical exam is also required.
New York does not operate one uniform statewide Master Electrician examination or license. New York City licenses Master Electricians through the Department of Buildings and requires both written and practical exams. Other municipalities in New York may have their own rules. This blog uses New York City's process as a specific example, not as an exam specification for all New York locations.
The New York City Master Electrician license is only one local jurisdiction example. Always verify your own New York city or county licensing requirements.
| Requirement | Description |
|---|---|
| Credential | New York City Master Electrician license; elsewhere in New York licensing is local |
| Governing authority | New York City Master Electrician |
| Candidate exam preparation | Individual licensing eligibility and technical study |
| Official exam rules | Verify current issuer bulletins |
| Reference rules | Follow exact exam-room requirements |
| Study emphasis | Electrical theory, grounding, services, wiring and controls |
| Contractor business | Meet separate business and licensing rules |
| Exam organizer | CPS HR Consulting for the published NYC outline |
| Written exam | 80 multiple-choice questions, closed book |
| Written duration | 180 minutes / 3 hours |
| Written passing | 70%, 56 correct |
| Practical exam | Two parts: plans and five hands-on exercises |
| Plan reading | 50 minutes, 71% required |
| Five exercises | Bending, lights, starter, meters, motors |
| Practical time | 20 minutes for each of five exercises |
| Practical exercise average | 70% to pass Part 2 |
| Current NYC installation code | 2025 NYC Electrical Code, based on 2020 NEC |
| Older NYC exam content outline | 2011 NYC Electrical Code, based on 2008 NEC |
| Code discrepancy | Confirm with current exam administrator before scheduling |
| Written exam fee | DOB currently lists $585 |
| Practical exam fee | DOB currently lists $530 |
| Practical deadline | Pass within 24 months of written result notice |
| License application | DOB NOW: Licensing, required since Feb 23, 2026 |
| Reference materials | Not allowed during NYC written or practical exams |
| Experience standard | Seven years supervised trade experience in standard pathway; multiple alternatives |
| Minimum age | 18 years |
| Written exam source | NYC DOB / CPS HR published outline |
| Scheduled test | Check current exam administrator confirmation |
| Reference marking | Review approved highlighting and tabs |
| Product-year warning | Store 2026 NEC products may be newer than the code tested |
New York licensing varies by city and county. This guide uses NYC as a specific local example and does not imply every New York municipality follows the NYC exam.
| Exam portion | Questions or format | Time allowed | Passing requirement |
|---|---|---|---|
| NYC written • closed book | 80 | 180 minutes | 70%, 56 correct |
| NYC practical Part 1 • plan reading | Practical | 50 minutes | 71% |
| NYC practical Part 2 • five exercises | 5 exercises | 20 minutes each | 70% average |
The 2025 New York City Electrical Code took full effect December 21, 2025 and incorporates NYC amendments to the 2020 NEC. The NYC exam provider's published content outline still references NYC Electrical Code 2011, based on the 2008 NEC. Because the two documents are not synchronized, confirm the code basis for your scheduled exam with the exam administrator. The 2026 NEC in store study packages is not automatically the NYC exam code. NYC's written exam is CLOSED BOOK, 80 questions, 180 minutes, 70% to pass; a separate practical exam is also required.
NYC published written-test category. Study branch circuits, feeders, service calculations, grounding and bonding, required outlets, overcurrent protection and surge equipment.
Study the practical reasoning behind this area. Identify the applicable electrical concepts, learn common formulas and terminology, and complete short review problems. For open-book sections, practice code navigation; for closed-book sections, practice answering without a reference.
Study wiring methods, conductor installation, equipment, cable and conduit types, enclosures, boxes, motors, general-use equipment and specialized installation practices.
Study the practical reasoning behind this area. Identify the applicable electrical concepts, learn common formulas and terminology, and complete short review problems. For open-book sections, practice code navigation; for closed-book sections, practice answering without a reference.
Review conduit fill, equipment and installation requirements, communication systems, special systems and applicable NYC administrative rules.
Study the practical reasoning behind this area. Identify the applicable electrical concepts, learn common formulas and terminology, and complete short review problems. For open-book sections, practice code navigation; for closed-book sections, practice answering without a reference.
Review hazardous locations, special occupancies, emergency systems, fire alarm circuits, solar equipment, special equipment and wiring conditions.
Study the practical reasoning behind this area. Identify the applicable electrical concepts, learn common formulas and terminology, and complete short review problems. For open-book sections, practice code navigation; for closed-book sections, practice answering without a reference.
Study a timed 50-minute electrical plan-reading assessment, with a required 71% passing score.
Study the practical reasoning behind this area. Identify the applicable electrical concepts, learn common formulas and terminology, and complete short review problems. For open-book sections, practice code navigation; for closed-book sections, practice answering without a reference.
Perform the hands-on bending exercise with a 20-minute limit.
Study the practical reasoning behind this area. Identify the applicable electrical concepts, learn common formulas and terminology, and complete short review problems. For open-book sections, practice code navigation; for closed-book sections, practice answering without a reference.
Practice lighting circuit assembly and interpretation of specifications with a 20-minute limit.
Study the practical reasoning behind this area. Identify the applicable electrical concepts, learn common formulas and terminology, and complete short review problems. For open-book sections, practice code navigation; for closed-book sections, practice answering without a reference.
Practice motor-starter controls, wiring and identification of components with a 20-minute limit.
Study the practical reasoning behind this area. Identify the applicable electrical concepts, learn common formulas and terminology, and complete short review problems. For open-book sections, practice code navigation; for closed-book sections, practice answering without a reference.
Practice safe electrical meter identification and testing concepts under a 20-minute limit.
Study the practical reasoning behind this area. Identify the applicable electrical concepts, learn common formulas and terminology, and complete short review problems. For open-book sections, practice code navigation; for closed-book sections, practice answering without a reference.
Practice motor connections and relevant controls under a 20-minute limit.
Study the practical reasoning behind this area. Identify the applicable electrical concepts, learn common formulas and terminology, and complete short review problems. For open-book sections, practice code navigation; for closed-book sections, practice answering without a reference.
Start by identifying the credential and exam administrator rather than relying on a generic master electrician outline.
Keep a printed copy of the current exam bulletin or local exam instructions next to your study schedule.
Study general electrical knowledge, power calculations and NEC organization before tackling difficult scenarios.
Separate code-book study from closed-book recall. Each develops a different skill.
Use regular timed mini-exams to measure progress and keep a notebook outside the exam room to track mistakes.
Practice service, feeder and motor calculations with both straightforward and word-based questions.
Review grounding and bonding, overcurrent protection, conductor sizing and wiring methods repeatedly.
Use approved reference editions. A newer published NEC does not automatically replace an earlier tested edition.
Prepare for any separate business, licensing or practical examination requirements.
Schedule final simulated tests under the actual published time limits.
Master-level preparation becomes easier when service, feeders, panelboards, grounding and final circuits are viewed as parts of one system.
Educational concept drawing only. Actual design and installation must follow the adopted code and approved plans.
Identify the city, county or municipality that regulates the work location.
For NYC, review DOB Master Electrician experience and eligibility pathways.
Prepare for the closed-book written test; study NYC code and rules as directed by the examiner.
Apply through DOB NOW and pay the written examination fee.
Pass the 80-question, three-hour written examination.
Apply and pass the separate hands-on practical exam within 24 months.
Submit the DOB background application, verified experience and supporting documents.
Complete NYC license issuance, insurance/business registration and renewal requirements.
These percentages are within the named individual written exam part. Practical exercises are separately scored where applicable.
The progress bars show category emphasis within a portion of the exam, not a combined overall passing score.
| Book or reference | Edition | Use |
|---|---|---|
| 2025 NYC Electrical Code | 2025; based on 2020 NEC | Current installation code, effective Dec 21, 2025 |
| NYC CPS HR exam content outline | References NYC Electrical Code 2011 / NEC 2008 | Older published exam outline; verify current exam basis |
| NYC Rules and Regulations | Current NYC rules | Study applicable license and electrical requirements |
| NEC 2026 with tabs | 2026 | Store study resource; NOT approved for closed-book NYC examination |
| Master Electrician Calculations Study Guide | 2026 | Home practice of motors, conductors and load formulas |
| Master Electrician Flash Cards | 2026 | Closed-book recall practice |
| Hand tools and measurement equipment | As specified by examiner | Practical preparation |
| NYC DOB Master Electrician instructions | Current website | Experience, fees, applications and deadlines |
The 2025 New York City Electrical Code took full effect December 21, 2025 and incorporates NYC amendments to the 2020 NEC. The NYC exam provider's published content outline still references NYC Electrical Code 2011, based on the 2008 NEC. Because the two documents are not synchronized, confirm the code basis for your scheduled exam with the exam administrator. The 2026 NEC in store study packages is not automatically the NYC exam code. NYC's written exam is CLOSED BOOK, 80 questions, 180 minutes, 70% to pass; a separate practical exam is also required.
Exam access policies vary. Follow the rule that applies to your exact exam and location.
New York does not operate one uniform statewide Master Electrician examination or license. New York City licenses Master Electricians through the Department of Buildings and requires both written and practical exams. Other municipalities in New York may have their own rules. This blog uses New York City's process as a specific example, not as an exam specification for all New York locations.
Electrical contracting work can involve services, feeders, circuits, controls, equipment, lighting and specialized electrical installations, subject to the relevant licensing scope and code rules. Being familiar with the work is not the same as having authority to contract for it.
The New York City Master Electrician license is only one local jurisdiction example. Always verify your own New York city or county licensing requirements.
| Path | Purpose | Distinction |
|---|---|---|
| Official local or state credential | New York City Master Electrician license; elsewhere in New York licensing is local | License scope is determined by the applicable regulator |
| Master Electrician study product | Educational preparation | Does not issue a license |
| Journeyman electrical experience | Qualifying field work | May satisfy part of experience requirements |
| Contractor business requirements | Company approvals | Additional registration and financial requirements |
| Electrical technical testing | Electrical theory and code | May contain multiple parts |
| Practical examination | Hands-on trade performance | Required only where the official jurisdiction specifies it |
80 • 180 minutes • 70%, 56 correct
Practical • 50 minutes • 71%
5 exercises • 20 minutes each • 70% average
Advanced electrical licensing can be challenging because it tests both familiar field skills and careful interpretation of technical rules.
Typical subjects include grounding and bonding, conductor ampacity, electrical service calculations, motors and controls, and code exceptions.
A candidate may work with equipment every day yet still need extra practice to answer questions in a timed exam.
Electrical calculations require accuracy. Mixing conductor ratings, incorrect demand factors or skipping a table note can produce a wrong answer.
The right preparation depends on the test format. Closed-book exams reward memory and application; open-book exams also reward fast reference lookup.
Practical exams test the ability to demonstrate hands-on skills rather than choose a multiple-choice answer.
Start well before your examination date and review your weakest topics several times.
An organized study system, code review, calculations and flash cards can support exam readiness, but no preparation product guarantees a passing score.
These are actual state-specific or general master-level products from ContractorExamPreps.com. Check their exact code editions against the official testing rules.
Actual Contractor Exam Preps product image. This is a study-package image, not a state-issued license.
NYC Department of Buildings • Closed-Book Written Exam • Practical Skills • 2025 NYC Electrical Code
Licensing and Eligibility
No. Electrical licensing is handled by local jurisdictions. This guide uses New York City as a specific example.
The New York City Department of Buildings.
The published NYC exam outline lists 80 multiple-choice questions.
Three hours, or 180 minutes.
70%, or 56 correct answers.
Exam Questions and Scoring
No. NYC states that reference materials are not allowed.
Yes. Candidates must pass written and practical examinations.
Plan reading and five exercises: wire or conduit bending, lights, starter, meters and motors.
50 minutes, with a 71% passing requirement.
Each is scheduled for 20 minutes and the five-exercise Part 2 requires an average of 70%.
Codes and References
The 2025 NYC Electrical Code, based on the 2020 NEC with New York City amendments, effective December 21, 2025.
The public NYC testing outline still references NYC Electrical Code 2011 / NEC 2008. Confirm the code version for your scheduled exam with the exam administrator.
No. The published NYC written and practical exams prohibit reference books in the test room.
Yes. The verified product describes a state-focused guide, calculations guide, NEC 2026 and Master Electrician flash cards.
The NYC DOB application page lists $585 for the written exam.
Business, Practice and Study
The NYC DOB page lists $530 for the practical.
NYC DOB states 24 months after written-exam result notification.
Yes. The standard pathway lists seven years of supervised work, including at least two years in NYC. Alternative education and apprenticeship routes are specified.
Through DOB NOW: Licensing, which became mandatory for these applications on February 23, 2026.
No. Verify other jurisdictions separately.
Related Contractor Exam Preps Products
No. Prepare for the current local code and the examination administrator’s confirmed blueprint. The 2026 NEC is supplementary study material.
This general 1ExamPrep Master Electrician video covers study guides, electrical calculations, NEC navigation and practical exam preparation. It is not an official examination bulletin for the jurisdiction in this article.
The 2025 New York City Electrical Code took full effect December 21, 2025 and incorporates NYC amendments to the 2020 NEC. The NYC exam provider's published content outline still references NYC Electrical Code 2011, based on the 2008 NEC. Because the two documents are not synchronized, confirm the code basis for your scheduled exam with the exam administrator. The 2026 NEC in store study packages is not automatically the NYC exam code. NYC's written exam is CLOSED BOOK, 80 questions, 180 minutes, 70% to pass; a separate practical exam is also required.
Follow the official licensing authority for current eligibility and exam requirements. Use matching store products to support study.
Preparation for an advanced electrical contractor examination is a serious professional project. Good electrical work depends on correct designs, safe installation procedures, careful calculations and compliance with the laws that govern a contractor or license holder.
The first study decision should always be identifying the legal credential. Product names sometimes use Master Electrician as a broad educational category, while the government may define a different license title or place licensing responsibility with a city instead of the state.
Electrical theory is the foundation of a good study plan. Voltage, current, resistance, power and circuit behavior help explain why code requirements exist and how equipment operates. Studying theory is especially helpful when a test question is worded differently from a familiar practice example.
Grounding and bonding deserve regular attention. Candidates should understand grounding electrodes, bonding jumpers, fault-current paths and the relationship between system grounding and protection of equipment. These concepts apply to many installations and can appear in complex situations.
Load calculations and conductor sizing can also be demanding. Review service calculations, feeder demands, branch circuits, motor loads, overcurrent protection, conductor ampacity and temperature conditions. Practice setting up the solution before choosing numbers from a table.
Study electrical materials as complete systems rather than isolated vocabulary. A correct installation may require appropriate cables, raceways, fittings, electrical boxes, conductor insulation, circuit protection and equipment disconnects. Each part must be suitable for the surrounding conditions.
Modern systems bring additional subjects such as generators, transformers, controls, lighting, special occupancies, communication systems and alarms. Candidates should pay attention to the official examination blueprint instead of spending all of their time on the work they encounter most frequently.
Exam rules are just as important as technical study. Some electrical examinations permit approved references, while others prohibit all books. Some include hands-on practical tasks or a separate contractor business component. Familiarity with a different state exam is not proof that the same rules apply here.
Contractor Exam Preps offers study guides, electrical calculations resources, practice examinations, flash cards and NEC reference packages. Use those materials to build skills and reinforce difficult topics. Study products do not replace approval by the licensing agency.
Make a weekly plan and set aside short review periods for difficult concepts. After each practice test, review incorrect answers and explain why the correct response fits the rule. Return to the same weak topics several times rather than reading the entire textbook without practice.
As your exam approaches, complete a simulation using the official time limit and format. Practice calculations accurately and use only the materials your examination actually permits. A good study schedule should prepare both your knowledge and your testing habits.
Finally, keep licensing requirements separate from exam requirements. Passing a trade test may still leave applications, work experience verification, business approvals, continuing education or other legal steps. Use the state or city licensing website as the controlling source.
New York does not operate one uniform statewide Master Electrician examination or license. New York City licenses Master Electricians through the Department of Buildings and requires both written and practical exams. Other municipalities in New York may have their own rules. This blog uses New York City's process as a specific example, not as an exam specification for all New York locations.
The 2025 New York City Electrical Code took full effect December 21, 2025 and incorporates NYC amendments to the 2020 NEC. The NYC exam provider's published content outline still references NYC Electrical Code 2011, based on the 2008 NEC. Because the two documents are not synchronized, confirm the code basis for your scheduled exam with the exam administrator. The 2026 NEC in store study packages is not automatically the NYC exam code. NYC's written exam is CLOSED BOOK, 80 questions, 180 minutes, 70% to pass; a separate practical exam is also required.
The official examination and licensing references are the final authority for the questions you will face. New York licensing varies by city and county. This guide uses NYC as a specific local example and does not imply every New York municipality follows the NYC exam.
This guide explains the advanced electrician examination and contracting pathway identified in the title. It is intended for candidates who want to understand the official process, study electrical subjects and identify related resources sold by Contractor Exam Preps.
The most important step is confirming the exact credential with the right authority. The words Master Electrician appear on study materials in many states, but a state contractor classification and a city-issued electrician license are not necessarily identical.
After identifying the credential, read the current examination instructions carefully. Record the number of questions, passing rules, time limit, calculator rules, reference permissions and any extra practical or business tests.
An effective electrical study plan starts with theory, including voltage, current, resistance, electrical power and circuit behavior. These basic ideas support more complicated calculations.
Students should then review services, feeders, branch circuits, grounding and bonding, conductor ampacity, raceway selection, box fill and overcurrent protection. Practice problems help make each topic more familiar.
Motor and transformer questions often combine several technical rules. Learn how to read the question, choose the appropriate procedure and check whether a special requirement applies.
Special electrical systems can include alarm circuits, low-voltage systems, signs, generators, emergency power, communications and wiring in specialized occupancies. Give them study time when they appear in the official outline.
Code editions matter. A newer electrical code is not automatically the one used by an examination administrator. A book that teaches current NEC organization can support study while still being different from the edition approved for test day.
Open-book and closed-book exams require different habits. For open-book tests, practice locating sections quickly in approved references. For closed-book exams, practice recall and calculations without opening a book.
If a practical examination is required, study the actual exercises and practice them safely. If Business and Law is required, schedule separate preparation for licensing, contracts, taxes and contractor responsibilities.
Contractor Exam Preps sells state-focused study-guide packages, calculation materials, flash cards and codebooks. Product details should always be compared with the official examination references before buying.
Keep a record of mistakes, complete timed tests, check administrative deadlines and use official licensing sources for final decisions. Consistent preparation is more useful than relying on one practice examination or a last-minute reading session.
New York licensing varies by city and county. This guide uses NYC as a specific local example and does not imply every New York municipality follows the NYC exam.
The 2025 New York City Electrical Code took full effect December 21, 2025 and incorporates NYC amendments to the 2020 NEC. The NYC exam provider's published content outline still references NYC Electrical Code 2011, based on the 2008 NEC. Because the two documents are not synchronized, confirm the code basis for your scheduled exam with the exam administrator. The 2026 NEC in store study packages is not automatically the NYC exam code. NYC's written exam is CLOSED BOOK, 80 questions, 180 minutes, 70% to pass; a separate practical exam is also required.