{"product_id":"psi-arizona-r-37-plumbing-including-solar-residential-certification-package","title":"Arizona R-37 Plumbing, including Solar (Residential) Contractor Exam Book Package","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eARIZONA R-37 PLUMBING, INCLUDING SOLAR (RESIDENTIAL) CONTRACTOR EXAM BOOK PACKAGE\u003c\/h1\u003e\n\u003cp style=\"text-align:center;\"\u003eThe Arizona R-37 Plumbing, Including Solar (Residential) Contractor Exam Book Package by Contractor Exam Preps is aligned with PSI and the Arizona Registrar of Contractors (ROC) standards. This package prepares candidates for the residential plumbing and solar installation contractor license exam, covering topics such as drainage, waste, vent systems, solar water heating, gas piping, and Arizona-specific business and trade regulations. It references the Uniform Plumbing Code and includes PSI-approved reference materials to help meet Arizona ROC licensing requirements for R-37 classification under residential construction law.\u003c\/p\u003e\u003cbr\u003e\n\u003ch1\u003e\u003cbr\u003e\u003c\/h1\u003e\n\u003cp\u003e\u003cspan style=\"text-decoration: underline;\"\u003eSCOPE OF WORK \u003c\/span\u003e\u003cbr\u003eInstallation and repair of water and gas piping systems, fire protection systems, and sewage treatment systems. Included are all fixtures, vents, and devices common to the industry, as well as solar applications. This scope includes all R-37R subclassifications\u003c\/p\u003e\n\u003cp\u003eThe R-37 exam is 100 questions in 240 minutes, with a minimum passing score of 70%. The R-37 Solar exam is 30 questions in 75 minutes, with a minimum passing score of 70%.\u003c\/p\u003e\n\u003ch1\u003eFor the R-37 exam:\u003c\/h1\u003e\n\u003cp\u003eThe reference material listed below was used to prepare the questions for this examination. The examination may also contain questions based on trade knowledge or general industry practices. Except for Code books, you can base your answers on later editions of references as they become available. For Code questions, the examinations will be based only on the edition of the Code book that is listed. \u003cbr\u003e \u003cbr\u003eCandidates may use a silent, nonprinting, non-programmable calculator in the examination center.\u003c\/p\u003e\n\u003cp\u003eThe following reference material \u003cstrong\u003eis allowed\u003c\/strong\u003e in the examination center:\u003c\/p\u003e\n\u003cp\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA),\u003c\/p\u003e\n\u003cp\u003eInternational Fuel Gas Code, 2018\u003c\/p\u003e\n\u003cp\u003eInternational Mechanical Code, 2018\u003c\/p\u003e\n\u003cp\u003eInternational Plumbing Code, 2018\u003c\/p\u003e\n\u003cp\u003eNFPA 13 - Installation of Sprinkler Systems, 2016 Edition\u003c\/p\u003e\n\u003cp\u003eNFPA 13D - Installation of Sprinkler Systems in One- and TwoFamily Dwellings and Manufactured Homes, 2007 Edition\u003c\/p\u003e\n\u003cp\u003eNFPA 13R -Sprinkler Systems for Residential Occupancies up to and Including Four Stories in Height, 2007 Edition\u003c\/p\u003e\n\u003cp\u003eOn-site Wastewater Treatment Facility Provisions in Unified Water Quality Permit Rule, Arizona Administrative Code Title 18, Chapter 9, 2006. \u003cbr\u003e \u003cbr\u003eThe following reference material is\u003cstrong\u003e NOT allowed\u003c\/strong\u003e in the examination center:\u003c\/p\u003e\n\u003cp\u003eMathematics for Plumbers and Pipefitters, 7th Edition\u003c\/p\u003e\n\u003cp\u003eIPT's Pipe Trades Handbook, 1991\u003c\/p\u003e\n\u003cp\u003eBoiler Operator's Guide, 4th edition\u003c\/p\u003e\n\u003cp\u003eArizona 811: Arizona Blue Stake \u003c\/p\u003e\n\u003cp\u003eModern Hydronic Heating for Residential and Light Commercial Buildings, 2nd edition\u003c\/p\u003e\n\u003cp\u003eCandidates are responsible for bringing their own references to the examination center. Reference materials may be highlighted, underlined, annotated and\/or indexed prior to the examination session. However, references may not be written in during the examination session. Any candidate caught writing, highlighting, underlining and\/or indexing in the references during the examination will be reported to the Arizona Registrar of Contractors. Furthermore, candidates are not permitted to bring in any additional papers (loose or attached) with their approved references. References may be tabbed\/indexed with permanent tabs only. (permanent tabs are defined as tabs that would tear the page if removed). Temporary tabs, (defined as Post-It notes, or other tabs that may be removed without tearing the page) are not allowed and must be removed from the reference before the exam will begin. If you are downloading from the Internet, you may bring this reference into the testing center with you as long as it is bound. You can have it spiral bound or you may hole-punch it and put it in a binder. \u003c\/p\u003e\n\u003ch1\u003eFor the R-37 Solar Exam:\u003c\/h1\u003e\n\u003cp\u003eThe following reference material \u003cstrong\u003eis allowed\u003c\/strong\u003e in the examination center:\u003c\/p\u003e\n\u003cp\u003eInternational Plumbing Code, 2018 Edition,\u003cbr\u003e\u003cbr\u003eThe following reference material is \u003cstrong\u003eNOT allowed\u003c\/strong\u003e in the examination center:\u003c\/p\u003e\n\u003cp\u003eSolar Water and Pool Heating Design and Installation Manual\u003c\/p\u003e","brand":"brown-states","offers":[{"title":"Default Title","offer_id":45014862790709,"sku":"19021206519865","price":1744.41,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/arizona_1024x1024_2x_55027409-996f-45b9-92c6-8d97c8db4b0f.png?v=1772081998","url":"https:\/\/contractorexampreps.com\/products\/psi-arizona-r-37-plumbing-including-solar-residential-certification-package","provider":"Contractor Exam Preps","version":"1.0","type":"link"}