{"product_id":"north-carolina-wind-turbine-contractor-book-package","title":"North Carolina Wind Turbine Contractor Exam Book Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Wind Turbine Contractor Exam Book Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Wind Turbine Contractor examination with a focused reference package covering wind-energy principles, turbine installation, generators, gearboxes, towers, foundations, crane operations, rigging hardware, excavation, concrete work, electrical fundamentals, maintenance, troubleshooting, and construction safety.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Wind Turbine specialty classification covers the construction, installation, and repair of wind turbines, wind generators, and wind power units. The scope includes the assembly of blades, generators, turbine structures, and towers, along with ancillary foundation work, field fabrication of metal equipment, and structural support components.\u003c\/p\u003e\n\u003cp\u003eThis exam book package brings together six references that support the major technical subjects found on the examination. Candidates can study wind-turbine operation, mechanical systems, generating equipment, structural components, crane safety, hooks, underground work, site preparation, concrete mixtures, and occupational safety using books directly related to the work performed on wind-energy projects.\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003eIntroduction to Wind Principles 2011\u003c\/em\u003e provides the foundation for understanding wind-energy systems. It supports preparation involving wind characteristics, turbine operation, generators, gearboxes, direct-drive systems, electrical concepts, controls, towers, installation, maintenance, and troubleshooting.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Occupational Safety and Health Standards for the Construction Industry supports review of workplace safety requirements that apply to turbine erection, elevated work, excavation, concrete operations, crane activity, electrical hazards, personal protective equipment, fall protection, material handling, and equipment use.\u003c\/p\u003e\n\u003cp\u003eASME B30.5-2007 addresses mobile and locomotive cranes used to lift turbine sections, blades, nacelles, generators, tower components, reinforcing materials, and construction equipment. ASME B30.10-2009 addresses hooks used in lifting and load-handling systems. Together, these standards support preparation for the hoisting portion of the examination.\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003ePipe and Excavation Contracting\u003c\/em\u003e supports study of site development, excavation, trenching, grading, underground work, dewatering, equipment selection, backfill, compaction, estimating, and production. These topics relate to ancillary foundation work and preparation of wind-turbine sites.\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003eDesign and Control of Concrete Mixtures, 17th Edition\u003c\/em\u003e supports study of concrete materials, proportioning, placement, consolidation, curing, testing, durability, admixtures, and quality control. This package includes the 17th Edition selected for this product. The current PSI examination reference list identifies the 16th Edition, 2016, for exam-room use, so candidates should obtain the listed edition when preparing their examination-day references.\u003c\/p\u003e\n\u003cp\u003eEffective preparation requires more than reading individual chapters. Wind-turbine projects combine mechanical, structural, electrical, lifting, foundation, excavation, and safety responsibilities. Candidates should understand how these subjects interact during transportation, staging, assembly, erection, connection, commissioning, inspection, maintenance, troubleshooting, and repair.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Wind Turbine Contractor examination contains 40 questions. Candidates have 90 minutes to complete the examination, and a minimum score of 70 percent is required to pass.\u003c\/p\u003e\n\u003cp\u003eThe examination is administered by PSI for the North Carolina Licensing Board for General Contractors. Candidates must first complete the applicable licensing application process and receive examination eligibility before scheduling a testing appointment.\u003c\/p\u003e\n\u003cp\u003eThe examination content includes installation of wind turbines, maintenance and troubleshooting, generators, gearboxes and direct-drive systems, structures and towers, ancillary foundation work, hoisting, fundamental electrical knowledge, and safety.\u003c\/p\u003e\n\u003cp\u003eInstallation questions may involve site preparation, delivery, staging, tower assembly, component identification, blade installation, nacelle placement, generator installation, alignment, bolting, lifting sequences, commissioning, inspection, and coordination among crews.\u003c\/p\u003e\n\u003cp\u003eMaintenance and troubleshooting topics may include scheduled inspections, lubrication, vibration, wear, overheating, unusual noise, electrical faults, brake systems, bearings, controls, sensors, blade condition, tower condition, and documentation of corrective work.\u003c\/p\u003e\n\u003cp\u003eGenerator preparation should include basic operating principles, mechanical-to-electrical energy conversion, generator components, rotational speed, electrical output, controls, protection, inspection, and common causes of reduced performance.\u003c\/p\u003e\n\u003cp\u003eGearbox and direct-drive preparation may address speed conversion, gears, shafts, bearings, lubrication, cooling, alignment, vibration, maintenance, failure indicators, and differences between geared and direct-drive turbine systems.\u003c\/p\u003e\n\u003cp\u003eStructures and tower questions may involve tower sections, flanges, fasteners, bolting sequences, alignment, structural supports, access systems, ladders, platforms, corrosion protection, fatigue, inspection, foundations, and safe assembly procedures.\u003c\/p\u003e\n\u003cp\u003eAncillary foundation work may involve excavation, subgrade preparation, reinforcement, anchor systems, concrete proportioning, placement, consolidation, curing, testing, backfill, drainage, compaction, and protection of completed work.\u003c\/p\u003e\n\u003cp\u003eHoisting questions may address crane setup, load charts, rated capacity, load weight, boom configuration, outriggers, ground conditions, swing radius, hooks, inspections, signaling, load control, side loading, weather, and communication among lifting personnel.\u003c\/p\u003e\n\u003cp\u003eFundamental electrical preparation may include voltage, current, resistance, power, grounding, conductors, generators, basic circuits, electrical safety, control systems, and the relationship between turbine rotation and electrical production.\u003c\/p\u003e\n\u003cp\u003eSafety preparation may involve fall protection, personal protective equipment, crane operations, excavation hazards, electrical hazards, ladders, scaffolds, material handling, severe weather, lockout procedures, emergency planning, and work at elevation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Wind Turbine Contractor examination is an open-book test. Candidates may bring the references specifically identified on the current PSI examination reference list, provided the books comply with the testing center’s rules.\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003eIntroduction to Wind Principles 2011\u003c\/em\u003e is an approved exam-room reference. It supports questions involving wind-energy fundamentals, turbine components, installation, maintenance, generators, gearboxes, direct-drive systems, electrical principles, towers, and troubleshooting.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Occupational Safety and Health Standards for the Construction Industry, with the latest available amendments, is an approved reference for safety questions involving fall protection, excavation, cranes, access, personal protective equipment, electrical hazards, concrete operations, and construction equipment.\u003c\/p\u003e\n\u003cp\u003eASME B30.5-2007, \u003cem\u003eMobile and Locomotive Cranes\u003c\/em\u003e, is an approved exam-room standard. It supports questions involving crane construction, operation, inspection, setup, maintenance, rated capacity, load handling, and safe lifting practices.\u003c\/p\u003e\n\u003cp\u003eASME B30.10-2009, \u003cem\u003eHooks\u003c\/em\u003e, is also approved for use during the examination. It supports questions involving hook types, identification, inspection, removal criteria, maintenance, testing, and safe load-handling practices.\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003ePipe and Excavation Contracting\u003c\/em\u003e is an approved reference supporting ancillary foundation and site-work questions involving excavation, equipment, grading, dewatering, underground work, backfill, compaction, estimating, and productivity.\u003c\/p\u003e\n\u003cp\u003eThe current PSI reference list identifies \u003cem\u003eDesign and Control of Concrete Mixtures, 16th Edition, 2016\u003c\/em\u003e as the approved concrete reference. This package includes the 17th Edition for study. Candidates should obtain the listed 16th Edition for examination-room use unless PSI updates the approved edition before their scheduled test date.\u003c\/p\u003e\n\u003cp\u003eCandidates are responsible for bringing their own approved references to the examination center. The testing center does not provide personal copies of the books.\u003c\/p\u003e\n\u003cp\u003eReference materials may be highlighted, underlined, or indexed before the examination. Permanent tabs may be used, but removable tabs, temporary flags, loose papers, attached notes, and unauthorized inserts are not accepted.\u003c\/p\u003e\n\u003cp\u003eNotes may not be written in the books before or during the examination. Candidates should prepare references through compliant highlighting and permanent indexing rather than handwritten study notes.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing still requires strong familiarity with the references. With 40 questions and 90 minutes, candidates have limited time to search. Preparation should include timed practice locating turbine topics, crane provisions, safety standards, excavation procedures, and concrete information.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eConfirm the specialty classification.\u003c\/strong\u003e Review the scope of the North Carolina Wind Turbine classification and determine that it matches the work the business plans to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect a license limitation.\u003c\/strong\u003e Choose the Limited, Intermediate, or Unlimited limitation that matches the company’s intended project size and financial qualifications.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the qualifying party.\u003c\/strong\u003e Designate the individual who will complete the Wind Turbine examination and qualify the business for the specialty classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the license application.\u003c\/strong\u003e Submit the required business, ownership, qualifier, and financial information to the North Carolina Licensing Board for General Contractors.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide supporting documents.\u003c\/strong\u003e Include the organizational, financial, and qualifier records required for the selected limitation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e The Board reviews the application and sends approved candidates the information needed to schedule with PSI.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule the examination.\u003c\/strong\u003e Register with PSI and select an available testing appointment within the eligibility period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStudy the examination outline.\u003c\/strong\u003e Prepare for turbine installation, maintenance, generators, gearboxes, towers, foundations, hoisting, electrical fundamentals, and safety.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrepare the approved references.\u003c\/strong\u003e Confirm that the books and standards comply with current PSI rules involving editions, binding, tabs, highlighting, and added materials.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eObtain the listed concrete edition.\u003c\/strong\u003e Use the concrete reference edition currently identified by PSI for examination-room admission.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination.\u003c\/strong\u003e Bring the required identification and approved references to the testing center.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete remaining licensing requirements.\u003c\/strong\u003e Satisfy any outstanding financial, business, qualifier, or organizational requirements.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive the license.\u003c\/strong\u003e Do not offer or perform regulated general contracting until the license has been issued and is active.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMaintain the license.\u003c\/strong\u003e Keep the business information, qualifying-party status, annual renewal, continuing education, and financial qualifications current.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates the Wind Turbine specialty classification. The classification covers construction, installation, and repair involving wind turbines, wind generators, and wind power units.\u003c\/p\u003e\n\u003cp\u003eThe approved scope includes assembly of blades, generators, turbine structures, and towers. It also includes ancillary foundation work, field fabrication of metal equipment, and structural support components associated with wind-energy installations.\u003c\/p\u003e\n\u003cp\u003eA North Carolina general contractor license is required when the cost of a construction undertaking meets or exceeds the state licensing threshold. The licensed business must hold the classification and limitation appropriate for the work being contracted.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina licenses are issued with Limited, Intermediate, or Unlimited limitations. The limitation controls the value of projects the business may undertake and is connected to the applicant’s financial qualifications.\u003c\/p\u003e\n\u003cp\u003eThe business applying for the license must use its correct legal name and provide the ownership, organizational, qualifier, and financial information required by the Board.\u003c\/p\u003e\n\u003cp\u003eEach licensed entity must maintain a qualifying party for the Wind Turbine classification. The qualifying party is the individual whose examination qualification supports the business license.\u003c\/p\u003e\n\u003cp\u003ePassing the Wind Turbine examination does not automatically issue the contractor license. The business must complete the Board’s application, financial, qualifier, and organizational requirements before the license becomes active.\u003c\/p\u003e\n\u003cp\u003eLicensed contractors remain responsible for compliance with project plans, engineering requirements, crane standards, safety rules, permits, inspections, environmental requirements, manufacturer instructions, contract terms, and professional standards.\u003c\/p\u003e\n\u003cp\u003eWind-turbine work may involve specialized engineering, electrical, structural, crane, transportation, and commissioning responsibilities beyond the scope of the trade examination. Contractors should coordinate with properly qualified professionals and specialty contractors when required.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIntroduction to Wind Principles 2011\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis exam-room reference supports preparation involving wind-energy fundamentals, turbine components, generators, gearboxes, direct-drive systems, installation, tower structures, controls, maintenance, troubleshooting, and electrical principles.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis exam-room reference covers construction safety, fall protection, excavation, crane operations, ladders, scaffolds, personal protective equipment, electrical hazards, material handling, concrete work, and workplace health requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eASME B30.5-2007, Mobile and Locomotive Cranes\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis exam-room standard addresses mobile crane construction, inspection, operation, maintenance, setup, load handling, rated capacity, signals, wire rope, outriggers, and safe lifting practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eASME B30.10-2009, Hooks\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis exam-room standard covers hook types, markings, inspections, maintenance, testing, operating practices, deformation, cracks, wear, throat opening, twist, and removal criteria.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis exam-room reference supports study involving excavation, grading, site preparation, underground work, dewatering, equipment selection, production, backfill, compaction, estimating, and ancillary foundation operations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesign and Control of Concrete Mixtures, 17th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis package includes the 17th Edition for study of concrete materials, proportioning, mixing, placement, consolidation, curing, testing, admixtures, durability, and quality control. The current PSI exam-room list identifies the 16th Edition, 2016.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIntroduction to Wind Principles 2011\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference may be used for open-book questions involving turbine operation, installation, maintenance, generators, gearboxes, direct-drive systems, towers, electrical fundamentals, and troubleshooting.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference may be used for questions involving construction safety, elevated work, excavation, cranes, access, electrical hazards, and personal protective equipment.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eASME B30.5-2007, Mobile and Locomotive Cranes\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis standard may be used for questions involving crane setup, capacity, inspection, operation, load handling, maintenance, and safe lifting practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eASME B30.10-2009, Hooks\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis standard may be used for questions involving hook inspection, operation, testing, maintenance, wear, damage, and removal criteria.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference may be used for questions involving site preparation, excavation, grading, equipment, dewatering, backfill, compaction, and foundation-related work.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBuild a study schedule around the examination outline. Give dedicated study time to wind-turbine installation, maintenance, generators, gearboxes, towers, foundations, hoisting, electrical principles, and safety.\u003c\/p\u003e\n\u003cp\u003eUse \u003cem\u003eIntroduction to Wind Principles\u003c\/em\u003e to learn the function of each major turbine component and how the complete system converts wind energy into electrical output. Review both geared and direct-drive configurations.\u003c\/p\u003e\n\u003cp\u003eStudy crane setup and lifting procedures carefully. Wind-turbine components can create unusual lifting conditions because of their size, weight, shape, elevation, and sensitivity to wind. Understand rated capacity, load control, setup, hooks, signaling, inspections, and operating limitations.\u003c\/p\u003e\n\u003cp\u003eReview foundation work from excavation through completed concrete placement. Study soil preparation, dewatering, reinforcing systems, anchor assemblies, concrete properties, placement, consolidation, curing, testing, and backfill.\u003c\/p\u003e\n\u003cp\u003ePractice locating information in each approved exam-room reference under timed conditions. Focus on direct navigation through indexes, tables of contents, defined terms, section headings, and permanent tabs.\u003c\/p\u003e\n\u003cp\u003eReview maintenance and troubleshooting as a systematic process. Candidates should understand inspection, symptom recognition, likely causes, safe shutdown, documentation, and correction of mechanical, structural, and electrical issues.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Wind Turbine Contractor candidates organize a specialized examination into practical technical and safety subjects.\u003c\/p\u003e\n\u003cp\u003eTrade-focused preparation connects wind principles with installation, maintenance, generators, gearboxes, towers, crane operations, foundations, excavation, concrete, and electrical fundamentals.\u003c\/p\u003e\n\u003cp\u003eReference-navigation practice helps candidates identify the correct book, locate the applicable section, interpret the requirement, and apply the information efficiently during an open-book examination.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented review reinforces how multiple subjects interact on a wind-turbine project. A single installation may involve excavation, concrete, crane setup, tower assembly, mechanical components, electrical equipment, elevated work, and safety coordination.\u003c\/p\u003e\n\u003cp\u003eOrganized study guidance helps candidates track completed subjects, revisit weaker areas, and balance turbine-system review with safety, hoisting, concrete, and site-work preparation.\u003c\/p\u003e\n\u003cp\u003eNo exam book package can guarantee examination passage, application approval, or license issuance. Results depend on the candidate’s qualifications, field experience, study effort, familiarity with the references, and performance during the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat books are included in this package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes \u003cem\u003eIntroduction to Wind Principles 2011\u003c\/em\u003e, North Carolina construction safety standards, ASME B30.5-2007, ASME B30.10-2009, \u003cem\u003ePipe and Excavation Contracting\u003c\/em\u003e, and \u003cem\u003eDesign and Control of Concrete Mixtures, 17th Edition\u003c\/em\u003e.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the North Carolina Wind Turbine examination open book?\u003c\/h2\u003e\n\u003cp\u003eYes. Candidates may use the references specifically approved under the current PSI examination rules.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the included concrete book the listed exam-room edition?\u003c\/h2\u003e\n\u003cp\u003eNo. This package includes the 17th Edition for study. The current PSI reference list identifies the 16th Edition, 2016, for exam-room use.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow many questions are on the examination?\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Wind Turbine Contractor examination contains 40 questions.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much time is allowed?\u003c\/h2\u003e\n\u003cp\u003eCandidates have 90 minutes to complete the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat score is required to pass?\u003c\/h2\u003e\n\u003cp\u003eA minimum score of 70 percent is required to pass.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat subjects are covered?\u003c\/h2\u003e\n\u003cp\u003eThe examination covers turbine installation, maintenance and troubleshooting, generators, gearboxes and direct-drive systems, structures and towers, foundation work, hoisting, electrical fundamentals, and safety.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWho administers the examination?\u003c\/h2\u003e\n\u003cp\u003ePSI administers the examination for the North Carolina Licensing Board for General Contractors.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan the exam-room books be highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eApproved references may be highlighted, underlined, and indexed before the examination. Permanent tabs may be used, but removable tabs, loose papers, notes, and unauthorized inserts are not allowed.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue a license?\u003c\/h2\u003e\n\u003cp\u003eNo. The applicant must complete the Board’s business, financial, organizational, qualifier, and licensing requirements before the license is issued.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919393775669,"sku":null,"price":1900.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-18-NC-WIND-TURBINE-BOOKS.jpg?v=1787552619","url":"https:\/\/contractorexampreps.com\/products\/north-carolina-wind-turbine-contractor-book-package","provider":"Contractor Exam Preps","version":"1.0","type":"link"}