{"product_id":"north-carolina-electrical-ahead-of-point-of-delivery-contractor-book-package","title":"North Carolina Electrical Ahead of Point of Delivery Contractor Exam Book Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Electrical Ahead of Point of Delivery Contractor Exam Book Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Electrical Ahead of Point of Delivery Contractor Exam with a complete seven-book package that brings together the technical references permitted in the testing center and additional study resources used to understand contractor law, electrical practices, and North Carolina licensing requirements.\u003c\/p\u003e\n\u003cp\u003eThis package is designed for candidates pursuing the North Carolina PU Electrical–Ahead of Point of Delivery classification through the North Carolina Licensing Board for General Contractors. The classification addresses electrical systems on the utility side of the point of delivery, including wiring systems, substations, distribution equipment, overhead and underground lines, grounding, conductors, service equipment, and related safety practices.\u003c\/p\u003e\n\u003cp\u003eThe package includes the four references identified for use during the open-book examination: the 2017 National Electrical Safety Code, the 13th edition of \u003cem\u003eLineman’s and Cableman’s Handbook\u003c\/em\u003e, the 2008 National Electrical Code, and the North Carolina Occupational Safety and Health Standards for the Construction Industry with the latest available amendments.\u003c\/p\u003e\n\u003cp\u003eIt also includes three additional study references that are not permitted inside the examination center: \u003cem\u003eContractor’s Guide to Business, Law and Project Management – North Carolina General Contractors Edition, 10th Edition\u003c\/em\u003e, \u003cem\u003eAmerican Electricians’ Handbook, 17th Edition\u003c\/em\u003e, and \u003cem\u003eLaws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/em\u003e. These books can support preparation for subjects such as business practices, licensing, liens, legal responsibilities, project administration, electrical theory, equipment, and general trade knowledge.\u003c\/p\u003e\n\u003cp\u003eHaving the full collection in one package helps eliminate the need to locate each publication separately. Candidates can organize their preparation around the official exam content areas while developing familiarity with the references they will use during testing. Because the examination is timed, knowing where information is located can be as important as understanding the underlying concepts.\u003c\/p\u003e\n\u003cp\u003eThis is a book package only. It does not include examination registration, application filing, licensing approval, testing fees, or a guarantee of examination success. Eligibility to take the examination and eligibility to receive a contractor license are determined by the North Carolina Licensing Board for General Contractors.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cstrong\u003eNational Electrical Safety Code 2017\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eLineman’s and Cableman’s Handbook, 13th Edition\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eNational Electrical Code, 2008\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with latest available amendments\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eContractor’s Guide to Business, Law and Project Management – North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eAmerican Electricians’ Handbook, 17th Edition\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eLaws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThe first four books listed above are the references identified for admission into the examination center. The remaining three books are included as supporting preparation materials and are not allowed in the testing room for this examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Electrical Ahead of Point of Delivery Contractor Exam is administered by PSI for the North Carolina Licensing Board for General Contractors. Eligibility to test must be granted by the Board before a candidate schedules an examination appointment with PSI.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eExamination classification:\u003c\/strong\u003e PU Electrical–Ahead of Point of Delivery\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNumber of questions:\u003c\/strong\u003e 50\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTime allowed:\u003c\/strong\u003e 120 minutes\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRequired passing score:\u003c\/strong\u003e 70 percent\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTesting provider:\u003c\/strong\u003e PSI Services\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eExam format:\u003c\/strong\u003e Computer-based contractor licensing examination\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReference status:\u003c\/strong\u003e Open book with only the approved references permitted\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThe examination content outline assigns questions to transformers, electrical knowledge, conductors, overhead lines, underground lines, equipment and safety, grounding methods, service drops and laterals, poles and structures, electric supply stations, laws and regulations, and liens.\u003c\/p\u003e\n\u003cp\u003eEquipment and safety represents the largest individual content area in the published outline. Conductors, transformers, and general electrical knowledge also account for a substantial portion of the examination. A balanced preparation plan should address every subject rather than concentrating exclusively on code lookup.\u003c\/p\u003e\n\u003cp\u003eThe examination may include questions developed from the listed references, trade knowledge, and general industry practices. Candidates should understand how electrical distribution systems are installed and maintained, how conductors and equipment are selected and protected, how overhead and underground systems differ, and how safety requirements apply to utility-related construction.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThis is an open-book examination, but only specifically approved references may be taken into the testing center. For the PU Electrical–Ahead of Point of Delivery examination, the permitted references are the 2017 National Electrical Safety Code, \u003cem\u003eLineman’s and Cableman’s Handbook\u003c\/em\u003e, 13th Edition, the 2008 National Electrical Code or its corresponding handbook, and the North Carolina Occupational Safety and Health Standards for the Construction Industry with the latest available amendments.\u003c\/p\u003e\n\u003cp\u003eCandidates are responsible for bringing their own approved references. The examination center does not supply the books. Complete references must be used; partial references are not accepted.\u003c\/p\u003e\n\u003cp\u003eApproved books may be highlighted, underlined, and indexed before the examination. Permanent tabs may be used, but removable tabs such as Post-it flags are not permitted. Notes cannot be written on tabs. References may not contain loose papers or additional attached materials, and candidates may not write in their books before or during the examination under the testing rules published for this contractor examination.\u003c\/p\u003e\n\u003cp\u003eBook familiarity is essential. With 50 questions and 120 minutes, candidates have an average of approximately two minutes and twenty-four seconds per question. Time spent searching aimlessly through a reference can reduce the time available for calculations, interpretation, and review. Practice locating tables, definitions, safety provisions, conductor information, grounding rules, and system requirements before exam day.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eChoose the appropriate classification.\u003c\/strong\u003e Review the scope of the PU Electrical–Ahead of Point of Delivery classification and confirm that it corresponds to the contracting work the business intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the required application or examination request.\u003c\/strong\u003e The application process begins with the North Carolina Licensing Board for General Contractors. The Board reviews the applicant’s information and determines examination eligibility.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination authorization.\u003c\/strong\u003e Approved candidates receive an eligibility letter containing the information needed to register for the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule the examination with PSI.\u003c\/strong\u003e The candidate contacts PSI, selects an available testing appointment, and completes the testing-provider registration process.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrepare using the content outline and references.\u003c\/strong\u003e Study the technical subject areas, organize the approved books, and practice locating information under timed conditions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTake the examination.\u003c\/strong\u003e Bring the required identification and only those reference materials and personal items permitted under PSI testing-center rules.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the licensing process.\u003c\/strong\u003e Passing the examination is part of the process. The Board must also determine that all applicable licensing requirements have been met before a license is issued.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003cp\u003eThe examination eligibility letter is valid for 120 days and permits one examination attempt during that authorization period. Missing a scheduled examination may count as an attempt. Candidates should read their eligibility notice and PSI instructions carefully before selecting an appointment.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates this classification. The PU Electrical–Ahead of Point of Delivery classification covers the construction, installation, alteration, maintenance, or repair of electrical wiring systems, including substations or their components, when those systems are or are intended to be owned, operated, and maintained by an electric power supplier.\u003c\/p\u003e\n\u003cp\u003eAn electric power supplier may include a public utility, private utility, utility cooperative, or another properly franchised supplier furnishing electrical service to one or more customers. The classification also includes the construction of solar arrays within the scope established by the Board’s classification rules.\u003c\/p\u003e\n\u003cp\u003eThe classification concerns work associated with utility electrical infrastructure ahead of the point where electrical service is delivered to the customer. It is distinct from ordinary premises-wiring work performed beyond the point of delivery under other electrical licensing classifications.\u003c\/p\u003e\n\u003cp\u003eApplicants must receive authorization from the North Carolina Licensing Board for General Contractors before scheduling the examination. Passing the trade examination does not by itself create a contractor license. Applicants must satisfy the Board’s application, qualification, financial, organizational, and licensing requirements applicable to the requested license and limitation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNational Electrical Safety Code 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis safety code addresses the installation, operation, and maintenance of electric supply and communication lines and associated equipment. It is a principal technical reference for utility distribution, overhead systems, underground systems, clearances, grounding, and worker safety. This book is allowed in the examination center.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLineman’s and Cableman’s Handbook, 13th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis industry handbook covers practical utility-line construction and maintenance topics, including conductors, cables, poles, transformers, substations, tools, rigging, grounding, overhead distribution, underground distribution, and field safety. This book is allowed in the examination center.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNational Electrical Code, 2008\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe 2008 National Electrical Code contains requirements for electrical installations, wiring methods, conductors, grounding and bonding, equipment, services, and related electrical safety provisions. The listed code edition is used for code-based questions on this examination. This book is allowed in the examination center.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference contains construction-industry workplace safety requirements applicable in North Carolina. It supports preparation for questions involving employee protection, electrical safety, personal protective equipment, excavation, fall protection, tools, equipment, and other construction hazards. This reference is allowed in the examination center.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractor’s Guide to Business, Law and Project Management – North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis contractor-oriented resource addresses business organization, project management, contracts, accounting, insurance, employment responsibilities, safety administration, and North Carolina-specific contractor topics. It is included as a study resource but is not allowed in the examination center for the PU Electrical–Ahead of Point of Delivery examination.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eAmerican Electricians’ Handbook, 17th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis broad electrical reference provides explanations, tables, calculations, and practical information involving electrical theory, conductors, equipment, motors, transformers, wiring, distribution, testing, and maintenance. It is included for additional technical study but is not allowed in the examination center.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLaws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis publication supports review of North Carolina contractor licensing law, Board rules, legal responsibilities, liens, license administration, and regulatory obligations. It is included for study and licensing-process awareness but is not allowed in the examination center for this trade examination.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cp\u003eOnly the following four references from this package are approved for use inside the examination center:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNational Electrical Safety Code 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eApproved for use during the North Carolina PU Electrical–Ahead of Point of Delivery examination.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLineman’s and Cableman’s Handbook, 13th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eApproved for use during the North Carolina PU Electrical–Ahead of Point of Delivery examination.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNational Electrical Code, 2008\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eApproved for use during the examination. Code questions are based on the listed 2008 edition.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eApproved for use during the examination when prepared and bound according to the testing-center rules.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThe Contractor’s Guide, American Electricians’ Handbook, and North Carolina laws and regulations publication must remain outside the examination room. They are included for preparation purposes only.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBegin by reviewing the official content outline and assigning study time according to the number of questions in each category. Equipment and safety accounts for ten questions, conductors for seven, transformers for six, and electrical knowledge for six. Together, these areas represent more than half of the examination.\u003c\/p\u003e\n\u003cp\u003eStudy overhead and underground construction separately. Overhead-line questions may involve pole systems, line components, conductors, clearances, support structures, protective devices, grounding, and safe work practices. Underground-line preparation may include cable systems, raceways, direct-burial considerations, access points, grounding, and installation practices.\u003c\/p\u003e\n\u003cp\u003ePractice transformer fundamentals, including voltage relationships, current relationships, loading, connections, protection, and typical distribution applications. Review grounding methods and the relationship between system grounding, equipment grounding, bonding, fault-current paths, and utility safety.\u003c\/p\u003e\n\u003cp\u003eUse the non-exam-room books to strengthen general understanding before relying on code searches. A candidate who understands the subject can identify the correct reference and section more quickly than someone attempting to learn every concept during the test.\u003c\/p\u003e\n\u003cp\u003eOrganize approved books with permanent tabs placed at major chapters, tables, and frequently used sections. Do not write notes on the tabs. Practice with the exact editions intended for the examination so that page numbering, section numbering, and table locations remain familiar.\u003c\/p\u003e\n\u003cp\u003eComplete timed lookup drills. Select a technical topic, locate the governing provision, and confirm the answer within two minutes. Repeat the exercise across all four approved references. This develops speed while reducing the temptation to search the wrong book.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps contractor candidates build a more organized path toward examination day. Instead of approaching the North Carolina Electrical Ahead of Point of Delivery exam as one large collection of unrelated facts, students can structure their preparation around the published content areas, approved references, and practical trade topics.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review helps connect code provisions to the systems encountered in utility construction, including transformers, conductors, overhead lines, underground lines, grounding, substations, service drops, laterals, poles, structures, and electrical safety. Practice-oriented preparation encourages candidates to work through technical questions, improve reference navigation, and recognize the type of information each book contains.\u003c\/p\u003e\n\u003cp\u003eReference navigation is especially valuable for an open-book examination. Organized highlighting, permanent tabbing, repeated lookup exercises, and timed practice can help students use the approved books more efficiently. The goal is not simply to own the references but to understand how they are arranged and where important provisions can be found.\u003c\/p\u003e\n\u003cp\u003eContractor Exam Prep also supports confidence-building study habits through structured review, realistic preparation, and a clear focus on the examination outline. No course or book package can guarantee a passing score, but disciplined preparation can help candidates approach the exam with greater familiarity and a stronger plan for managing their time.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the North Carolina Electrical Ahead of Point of Delivery exam open book?\u003c\/h2\u003e\n\u003cp\u003eYes. The examination is open book, but only the four references specifically approved for this classification may be taken into the testing center.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich books in this package are allowed in the exam room?\u003c\/h2\u003e\n\u003cp\u003eThe approved books are the 2017 National Electrical Safety Code, \u003cem\u003eLineman’s and Cableman’s Handbook\u003c\/em\u003e, 13th Edition, the 2008 National Electrical Code, and the North Carolina Occupational Safety and Health Standards for the Construction Industry with the latest available amendments.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhy does the package include books that are not allowed in the examination center?\u003c\/h2\u003e\n\u003cp\u003eThe additional books provide useful background in business, law, project management, licensing, electrical theory, equipment, and general industry practices. They are intended for preparation before the examination and must not be taken into the testing room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow many questions are on the exam?\u003c\/h2\u003e\n\u003cp\u003eThe examination contains 50 questions. Candidates are allowed 120 minutes and must earn a score of at least 70 percent.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWho administers the examination?\u003c\/h2\u003e\n\u003cp\u003ePSI administers the examination for the North Carolina Licensing Board for General Contractors. Candidates must first receive examination eligibility from the Board.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat work does the classification cover?\u003c\/h2\u003e\n\u003cp\u003eThe classification covers electrical wiring systems, substations, and related components that are or are intended to be owned, operated, and maintained by an electric power supplier for furnishing electrical service to customers. The classification also includes solar-array construction within the Board’s defined scope.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan I use removable tabs in my books?\u003c\/h2\u003e\n\u003cp\u003eNo. References may be indexed with permanent tabs, but removable tabs such as Post-it flags are not accepted. Notes may not be written on tabs.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes purchasing this package register me for the examination?\u003c\/h2\u003e\n\u003cp\u003eNo. Examination approval, registration, scheduling, testing fees, and contractor licensing are separate from the purchase of this book package.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue a contractor license?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing the examination is one part of the licensing process. The North Carolina Licensing Board for General Contractors determines whether an applicant has satisfied all requirements for license issuance.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919394693173,"sku":null,"price":1150.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-11-NC-ELECTRICAL-POD-BOOKS.jpg?v=1787552641","url":"https:\/\/contractorexampreps.com\/products\/north-carolina-electrical-ahead-of-point-of-delivery-contractor-book-package","provider":"Contractor Exam Preps","version":"1.0","type":"link"}