{"product_id":"arkansas-commercial-insulation-contractor-exam-highlighted-tabbed-book-package","title":"Arkansas Commercial Insulation Contractor Exam  Highlighted \u0026 Tabbed Book Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eArkansas Commercial Insulation Contractor Exam Highlighted \u0026amp; Tabbed Book Package\u003c\/h1\u003e\n\n\u003cp\u003ePrepare for the Arkansas Commercial Insulation Contractor examination with a professionally organized three-book reference package covering construction safety, building construction, insulation materials, thermal performance, moisture control, sound control, and commercial insulation installation practices.\u003c\/p\u003e\n\n\u003cp\u003eThis package is designed for candidates who want the technical trade references prepared for focused study and open-book navigation. Each included book is highlighted and tabbed before shipment, reducing the time required to create a personal reference system and helping candidates begin working with the books as soon as the package arrives.\u003c\/p\u003e\n\n\u003cp\u003eThe included references support preparation across the major areas connected with commercial insulation work. Candidates can review federal construction-safety requirements, understand the building assemblies into which insulation is installed, and study insulation materials, heat transfer, thermal resistance, vapor movement, condensation, acoustical performance, and installation considerations.\u003c\/p\u003e\n\n\u003cp\u003eEvery included book is highlighted and tabbed. Important safety provisions, construction concepts, insulation principles, definitions, tables, installation topics, and technical information are highlighted for focused review. Permanent tabs divide the references into organized sections so candidates can practice locating information efficiently during timed study sessions.\u003c\/p\u003e\n\n\u003cp\u003eThe package includes the Code of Federal Regulations, 29 CFR Part 1926; Carpentry and Building Construction, 2016; and Insulation Handbook, 2001. Together, these books provide a practical foundation for preparing for commercial insulation questions involving jobsite safety, building systems, insulation selection, application methods, thermal control, moisture management, and field performance.\u003c\/p\u003e\n\n\u003cp\u003eThis is a highlighted and tabbed book-purchase package. It does not include an online course, live instruction, practice examinations, the NASCLA Arkansas business and law book, Application Service, examination registration, testing fees, licensing fees, business formation, EIN filing, book rentals, or refundable deposits.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePlease allow up to 15 business days for tabbed and highlighted book package orders.\u003c\/strong\u003e This preparation period allows the complete book set to be highlighted, permanently tabbed, inspected, and organized before shipment.\u003c\/p\u003e\n\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n  \u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n  \u003cul\u003e\n    \u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e Code of Federal Regulations — 29 CFR Part 1926 (OSHA), highlighted and tabbed.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e Carpentry and Building Construction, 2016, highlighted and tabbed.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e Insulation Handbook, 2001, highlighted and tabbed.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003eProfessional Book Preparation:\u003c\/strong\u003e Important trade material is highlighted for focused review.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003ePermanent Tabs:\u003c\/strong\u003e Each book is divided into organized sections for efficient reference navigation.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003eOrder Processing:\u003c\/strong\u003e Please allow up to 15 business days for tabbed and highlighted book package orders.\u003c\/li\u003e\n  \u003c\/ul\u003e\n\u003c\/div\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\n\u003cp\u003eArkansas includes Insulation — Commercial among the trade-specific examination categories connected with commercial contractor licensing. Candidates pursuing this classification should prepare for technical subjects involving insulation products, thermal principles, building assemblies, installation methods, moisture control, acoustical performance, construction safety, and commercial jobsite practices.\u003c\/p\u003e\n\n\u003cp\u003eCommercial insulation work can involve framed walls, masonry walls, ceilings, floors, roofs, metal buildings, mechanical spaces, ducts, pipes, equipment, and other building components. The appropriate insulation system depends on the building assembly, project specifications, climate, service conditions, fire requirements, sound-control objectives, moisture exposure, and intended use of the structure.\u003c\/p\u003e\n\n\u003cp\u003eThe Code of Federal Regulations, 29 CFR Part 1926, supports preparation involving construction safety. Insulation contractors may work from ladders, scaffolds, lifts, roofs, platforms, and unfinished floor levels. They may also encounter airborne fibers, dust, chemicals, sharp tools, electrical hazards, falling objects, and material-handling risks.\u003c\/p\u003e\n\n\u003cp\u003eCarpentry and Building Construction, 2016 helps candidates understand the building systems into which insulation is installed. Relevant topics can include structural framing, floors, walls, ceilings, roofs, openings, exterior assemblies, ventilation, moisture management, and coordination among building materials.\u003c\/p\u003e\n\n\u003cp\u003eInsulation Handbook, 2001 supports technical preparation involving heat transfer, thermal resistance, insulation materials, vapor movement, condensation, sound control, system selection, installation practices, and long-term performance.\u003c\/p\u003e\n\n\u003cp\u003eCandidates should understand the relationship between insulation and the complete building assembly. Insulation performance can be affected by compression, gaps, voids, thermal bridging, air movement, moisture, improper supports, incompatible materials, and poor coordination with mechanical, electrical, plumbing, roofing, or framing work.\u003c\/p\u003e\n\n\u003cp\u003ePreparation should also include reading plans, specifications, schedules, sections, and construction details. Candidates may need to identify insulation types, thicknesses, locations, attachment methods, vapor-control requirements, fire-related conditions, and transitions between assemblies.\u003c\/p\u003e\n\n\u003cp\u003eThe Arkansas contractor licensing process also requires contractor Business and Law preparation. The NASCLA Contractors Guide to Business, Law and Project Management, Arkansas, 8th Edition is not included in this trade-only package and must be obtained separately when required.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\n\u003cp\u003eThe applicable Arkansas contractor examinations allow approved reference materials to be used during testing. Candidates should confirm the current approved-reference list, edition requirements, testing procedures, and book-preparation rules before scheduling the examination.\u003c\/p\u003e\n\n\u003cp\u003eAn open-book examination still requires substantial preparation. Testing time is limited, and candidates cannot depend on reading every chapter while answering questions. Strong preparation combines technical knowledge with the ability to identify the correct reference and locate the applicable information efficiently.\u003c\/p\u003e\n\n\u003cp\u003eThe highlighted and tabbed books in this package support that process. Highlighting draws attention to important safety provisions, insulation principles, construction details, definitions, tables, and installation considerations. Permanent tabs provide organized access points for commonly reviewed sections.\u003c\/p\u003e\n\n\u003cp\u003eA question involving personal protective equipment, respiratory protection, ladders, scaffolds, fall hazards, electrical exposure, material handling, housekeeping, or employer responsibilities may require the OSHA construction reference.\u003c\/p\u003e\n\n\u003cp\u003eA question involving framing, floors, walls, ceilings, roofs, openings, ventilation, moisture control, or general construction methods may require Carpentry and Building Construction.\u003c\/p\u003e\n\n\u003cp\u003eA question involving thermal resistance, heat flow, insulation materials, vapor movement, condensation, sound control, system selection, or installation performance may require the Insulation Handbook.\u003c\/p\u003e\n\n\u003cp\u003eCandidates should practice reading each question, identifying its main subject, selecting the most relevant book, using the installed tabs or index, and locating the applicable section. Surrounding material should also be reviewed because definitions, conditions, limitations, exceptions, tables, and illustrations can affect the answer.\u003c\/p\u003e\n\n\u003cp\u003eApproved references may be highlighted, underlined, annotated, and indexed before the examination session. Permanent tabs are permitted. Temporary removable tabs, loose papers, and attached sheets are not allowed, and candidates may not write in their references during testing.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\n\u003cp\u003eThis product provides highlighted and tabbed trade books only. It does not include licensing Application Service or examination scheduling.\u003c\/p\u003e\n\n\u003col\u003e\n  \u003cli\u003e\n\u003cstrong\u003eConfirm the commercial insulation classification.\u003c\/strong\u003e Make sure Insulation — Commercial matches the work the company intends to perform.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eReview the commercial licensing threshold.\u003c\/strong\u003e Determine whether the value and type of the planned projects require an Arkansas commercial contractor license.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eObtain the current application.\u003c\/strong\u003e Use the commercial contractor application and instructions issued by the Arkansas Contractors Licensing Board.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSelect the appropriate license type.\u003c\/strong\u003e Determine whether a restricted or unrestricted commercial license matches the company’s planned project scope.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePrepare business information.\u003c\/strong\u003e Gather the legal business name, entity documents, ownership details, tax-identification information, addresses, and contact information requested by the application.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eDocument relevant experience.\u003c\/strong\u003e Prepare accurate descriptions of commercial insulation, building-envelope, mechanical-insulation, or related construction projects.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eObtain experience references.\u003c\/strong\u003e Arrange for the references required by the commercial contractor application.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePrepare financial documentation.\u003c\/strong\u003e Obtain the financial records required for the selected commercial license.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eAddress contractor bond requirements.\u003c\/strong\u003e Complete the applicable Arkansas contractor bond process.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePrepare for the insulation examination.\u003c\/strong\u003e Study construction safety, building systems, insulation materials, thermal performance, moisture control, and installation practices.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePrepare for Business and Law separately.\u003c\/strong\u003e Obtain the NASCLA Arkansas business reference and review the required contractor business subjects.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePractice open-book navigation.\u003c\/strong\u003e Complete timed study exercises using the highlighted and tabbed trade books.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSchedule the required examinations.\u003c\/strong\u003e Follow the current testing provider’s registration and scheduling procedures.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eComplete the examinations.\u003c\/strong\u003e Bring the required identification and only the approved books and materials.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eComplete the licensing submission.\u003c\/strong\u003e Submit all required documents, fees, examination results, financial information, references, and bond materials.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eRespond to licensing requests.\u003c\/strong\u003e Provide any additional documents or explanations requested during the application review.\u003c\/li\u003e\n\u003c\/ol\u003e\n\n\u003cp\u003ePassing the examination is one part of the licensing process. The Arkansas Contractors Licensing Board must review and approve the complete application before the contractor may operate under the requested classification.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\n\u003cp\u003eThe Arkansas Contractors Licensing Board regulates commercial contractors and establishes standards involving construction experience, business ability, financial stability, examinations, and professional conduct.\u003c\/p\u003e\n\n\u003cp\u003eAn Arkansas commercial contractor license is generally required for commercial contracting work valued at $50,000 or more, including labor and materials. Contractors must obtain the proper license and classification before bidding, contracting, supervising, or performing regulated work at or above the applicable threshold.\u003c\/p\u003e\n\n\u003cp\u003eApplicants should request only classifications and specialties that accurately match their experience and intended services. A contractor approved for Insulation — Commercial should perform work within the classifications and specialties shown on the issued license.\u003c\/p\u003e\n\n\u003cp\u003eThe application process can include entity and ownership information, qualifying experience, references, financial documentation, examination results, applicant disclosures, filing fees, and other supporting materials.\u003c\/p\u003e\n\n\u003cp\u003eArkansas offers restricted and unrestricted commercial license options. The appropriate license depends on the contractor’s intended project size and the financial information provided with the application.\u003c\/p\u003e\n\n\u003cp\u003eCommercial applicants must satisfy applicable financial requirements and provide the required contractor bond before an approved license can be released. The current commercial application identifies a $10,000 contractor bond requirement.\u003c\/p\u003e\n\n\u003cp\u003eArkansas contractor license classifications must complete the Contractor Business and Law Examination in addition to any required trade-specific examination. The business reference and Business and Law preparation are not included in this package.\u003c\/p\u003e\n\n\u003cp\u003ePassing the trade and Business and Law examinations does not independently issue a contractor license. The Board must review the applicant’s experience, references, financial information, bond, examination results, and supporting documentation.\u003c\/p\u003e\n\n\u003cp\u003eCommercial insulation contractors may also need to address business registration, insurance, workers’ compensation when applicable, permits, inspections, taxes, contracts, safety programs, employment requirements, recordkeeping, and local rules.\u003c\/p\u003e\n\n\u003cp\u003ePurchasing this package does not establish examination eligibility, submit an application, provide a contractor bond, pay government fees, register the customer for testing, or authorize the performance of regulated work.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n    \u003cstrong\u003eCode of Federal Regulations — 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e\u003cbr\u003e\n    \u003cspan\u003eThis highlighted and tabbed construction-safety reference supports review of personal protective equipment, respiratory protection, ladders, scaffolds, fall protection, electrical hazards, tools, material handling, housekeeping, and employer safety responsibilities.\u003c\/span\u003e\n  \u003c\/li\u003e\n  \u003cli\u003e\n    \u003cstrong\u003eCarpentry and Building Construction, 2016\u003c\/strong\u003e\u003cbr\u003e\n    \u003cspan\u003eThis highlighted and tabbed building-construction reference supports study of framing, floors, walls, ceilings, roofs, openings, ventilation, moisture control, materials, and construction methods that affect insulation installations.\u003c\/span\u003e\n  \u003c\/li\u003e\n  \u003cli\u003e\n    \u003cstrong\u003eInsulation Handbook, 2001\u003c\/strong\u003e\u003cbr\u003e\n    \u003cspan\u003eThis highlighted and tabbed technical reference supports review of insulation materials, heat transfer, thermal resistance, moisture movement, condensation, sound control, system selection, installation practices, and performance considerations.\u003c\/span\u003e\n  \u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eAll three books are professionally highlighted and permanently tabbed. The prepared format supports focused review and repeated navigation practice during independent study or a separately purchased exam-preparation course.\u003c\/p\u003e\n\n\u003cp\u003eThe highlighting identifies important technical content, but candidates should still read the surrounding material. Definitions, tables, exceptions, illustrations, and related provisions may be necessary to understand the complete requirement.\u003c\/p\u003e\n\n\u003cp\u003eThe NASCLA Contractors Guide to Business, Law and Project Management, Arkansas, 8th Edition is not included. Candidates who need Business and Law preparation should obtain that book separately or select a package that specifically includes it.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePlease allow up to 15 business days for tabbed and highlighted book package orders.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\n\u003cp\u003eCreate a study schedule that divides preparation among construction safety, building systems, insulation technology, plan reading, and open-book navigation. Working with all three references regularly helps candidates become familiar with the complete trade package.\u003c\/p\u003e\n\n\u003cp\u003eSafety preparation should include respiratory protection, personal protective equipment, ladders, scaffolds, fall protection, electrical hazards, material handling, housekeeping, sharp tools, airborne fibers, and dust.\u003c\/p\u003e\n\n\u003cp\u003eBuilding-construction preparation should include walls, ceilings, roofs, floors, framed cavities, masonry conditions, metal-building assemblies, openings, ventilation, moisture control, and coordination with other trades.\u003c\/p\u003e\n\n\u003cp\u003eInsulation study should include heat flow, thermal resistance, insulation types, vapor movement, condensation, sound control, material selection, application methods, installation quality, and system performance.\u003c\/p\u003e\n\n\u003cp\u003eCandidates should understand how gaps, compression, poor fitting, thermal bridges, moisture, air leakage, and incompatible materials can reduce performance. Review how insulation interacts with air barriers, vapor-control layers, framing, exterior assemblies, roofing systems, mechanical systems, and interior finishes.\u003c\/p\u003e\n\n\u003cp\u003ePractice reading construction drawings and specifications. Identify insulation locations, product requirements, thicknesses, attachment methods, assembly details, transitions, penetrations, and areas requiring coordination with other trades.\u003c\/p\u003e\n\n\u003cp\u003eComplete timed reference exercises. Read each question, identify the central subject, select the correct book, use the installed tabs or index, locate the applicable section, and confirm the answer.\u003c\/p\u003e\n\n\u003cp\u003eReview missed questions carefully. Determine whether the difficulty involved technical knowledge, unfamiliar terminology, incorrect reference selection, slow navigation, or misinterpretation of the material.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\n\u003cp\u003eContractor Exam Prep helps candidates organize trade preparation by providing reference packages matched to contractor examination subjects. This package brings together three highlighted and tabbed books for studying commercial insulation, building systems, and construction safety.\u003c\/p\u003e\n\n\u003cp\u003eThe professionally prepared references reduce the time required to build a personal open-book navigation system. Students can begin working with the highlighted content and permanent tabs when the package arrives.\u003c\/p\u003e\n\n\u003cp\u003eTrade-focused review helps candidates concentrate on insulation materials, thermal performance, moisture movement, sound control, installation methods, building assemblies, and workplace safety.\u003c\/p\u003e\n\n\u003cp\u003ePractice-oriented preparation helps turn technical reading into usable exam skills. Candidates should work with the books while answering questions, reviewing field situations, interpreting construction details, and locating technical information under timed conditions.\u003c\/p\u003e\n\n\u003cp\u003eReference navigation is especially important for open-book testing. Repeated use helps candidates recognize which book applies to a subject and where important information is located.\u003c\/p\u003e\n\n\u003cp\u003eThe package can be used with a separately purchased Contractor Exam Prep online course, live class, tutoring program, practice-question system, or independent study schedule.\u003c\/p\u003e\n\n\u003cp\u003eNo book package guarantees a passing examination score, application approval, license issuance, or business outcome. Results depend on the applicant’s qualifications, experience, documentation, preparation, reference familiarity, and examination performance.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eFAQ Section\u003c\/h2\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in this highlighted and tabbed book package?\u003c\/h2\u003e\n\n\u003cp\u003eThe package includes three trade references covering OSHA construction safety, building construction, and commercial insulation materials and methods.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all three books highlighted and tabbed?\u003c\/h2\u003e\n\n\u003cp\u003eYes. Every included reference is professionally highlighted and permanently tabbed.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich OSHA reference is included?\u003c\/h2\u003e\n\n\u003cp\u003eThe package includes the Code of Federal Regulations, 29 CFR Part 1926.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich building-construction book is included?\u003c\/h2\u003e\n\n\u003cp\u003eThe package includes Carpentry and Building Construction, 2016.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich insulation reference is included?\u003c\/h2\u003e\n\n\u003cp\u003eThe package includes Insulation Handbook, 2001.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the NASCLA Arkansas business book included?\u003c\/h2\u003e\n\n\u003cp\u003eNo. The NASCLA Arkansas business and law reference is not included in this trade-only package.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs an online course included?\u003c\/h2\u003e\n\n\u003cp\u003eNo. Online instruction, live classes, tutoring, and practice examinations are not included.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs this a rental package?\u003c\/h2\u003e\n\n\u003cp\u003eNo. This is a book-purchase package and does not include a rental term, return requirement, or refundable deposit.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the package include Application Service?\u003c\/h2\u003e\n\n\u003cp\u003eNo. Licensing application preparation, submission, and follow-up services are not included.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the applicable examinations open book?\u003c\/h2\u003e\n\n\u003cp\u003eApproved reference materials may be used during the applicable Arkansas contractor examinations, subject to the current testing provider’s rules and approved-reference list.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long should I allow for the order?\u003c\/h2\u003e\n\n\u003cp\u003ePlease allow up to 15 business days for tabbed and highlighted book package orders.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes purchasing the package register me for the examination?\u003c\/h2\u003e\n\n\u003cp\u003eNo. Examination registration, testing fees, application fees, licensing fees, bonds, insurance, and government charges are separate.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the package guarantee a passing score?\u003c\/h2\u003e\n\n\u003cp\u003eNo. The package provides professionally prepared trade references for study, but examination and licensing outcomes cannot be guaranteed.\u003c\/p\u003e\n","brand":"1 Exam Prep","offers":[{"title":"Highlighted \u0026 Tabbed Book Package","offer_id":45919391416373,"sku":null,"price":500.0,"currency_code":"USD","in_stock":true},{"title":"Highlighted \u0026 Tabbed Book Package + Online Courses [+$295]","offer_id":45919391449141,"sku":null,"price":795.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-76-AR-commercialinsulation-HT.jpg?v=1787552572","url":"https:\/\/contractorexampreps.com\/products\/arkansas-commercial-insulation-contractor-exam-highlighted-tabbed-book-package","provider":"Contractor Exam Preps","version":"1.0","type":"link"}