{"product_id":"arizona-c-77-cr-77-plumbing-including-solar-certification-package","title":"Arizona C-77 (CR-77) Plumbing (including solar) Contractor Exam Book Package","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eARIZONA C-77 (CR-77) PLUMBING (INCLUDING SOLAR) CONTRACTOR EXAM BOOK PACKAGE\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe Arizona C-77 (CR-77) Plumbing (Including Solar) Contractor Exam Book Package by Contractor Exam Preps is structured to help candidates prepare for the Arizona Registrar of Contractors (ROC) licensing exam. This set aligns with the C-77 trade classification, covering plumbing installation, maintenance, and solar water heating systems. The package includes reference manuals such as the Uniform Plumbing Code and the Solar Water Heating Systems Design and Installation Manual, ensuring compliance with state testing standards. Developed for both commercial and residential scopes, it supports mastery of Arizona-specific plumbing codes, system sizing, and energy-efficient solar integration, key components of the ROC contractor license examination.\u003c\/p\u003e\u003cbr\u003e\n\u003ch3\u003eFor C-77 exam: The first 8 materials may be brought into the PSI exam center. The next 5 may not.\u003cbr\u003e\n\u003c\/h3\u003e\n\u003cp\u003eThe following reference material \u003cstrong\u003eis allowed\u003c\/strong\u003e in the examination center:\u003c\/p\u003e\n\u003cp\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/p\u003e\n\u003cp\u003eInternational Fuel Gas Code, 2018\u003c\/p\u003e\n\u003cp\u003eInternational Mechanical Code, 2018\u003c\/p\u003e\n\u003cp\u003eInternational Plumbing Code, 2018\u003c\/p\u003e\n\u003cp\u003eNFPA 13 - Installation of Sprinkler Systems, 2016 Edition\u003c\/p\u003e\n\u003cp\u003eNFPA 13D - Installation of Sprinkler Systems in One- and Two Family Dwellings and Manufactured Homes, 2007 Edition\u003c\/p\u003e\n\u003cp\u003eNFPA 13R -Sprinkler Systems for Residential Occupancies up to and Including Four Stories in Height, 2007 Edition\u003c\/p\u003e\n\u003cp\u003eOn-site Wastewater Treatment Facility Provisions in Unified Water Quality Permit Rule, Arizona Administrative Code Title 18, Chapter 9, 2006,\u003c\/p\u003e\n\u003cp\u003eThe following reference material is \u003cstrong\u003enot allowed\u003c\/strong\u003e in the examination center:\u003c\/p\u003e\n\u003cp\u003eMathematics for Plumbers and Pipefitters, 7th Edition, 2008\u003c\/p\u003e\n\u003cp\u003eIPT's Pipe Trades Handbook\u003c\/p\u003e\n\u003cp\u003eBoiler Operator's Guide, 4th edition\u003c\/p\u003e\n\u003cp\u003eArizona 811\u003c\/p\u003e\n\u003cp\u003eModern Hydronic Heating for Residential and Light Commercial Buildings, Second Edition, 2004\u003c\/p\u003e\n\u003ch3\u003eFor the C-77 Solar exam: Only the 4th book may be brought into the PSI exam center, and the last book specifically for the C-77 solar exam may not be brought into the exam center.  \u003c\/h3\u003e\n\u003cp\u003eThe following reference material \u003cstrong\u003eis allowed\u003c\/strong\u003e in the examination center:\u003c\/p\u003e\n\u003cp\u003eInternational Plumbing Code, 2018 Edition\u003c\/p\u003e\n\u003cp\u003eThe following reference material is\u003cstrong\u003e not allowed\u003c\/strong\u003e in the examination center:\u003c\/p\u003e\n\u003cp\u003eSolar Water and Pool Heating Design and Installation Manual\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003eThis is a dual license. \u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eSCOPE OF WORK\u003c\/span\u003e\u003cbr\u003eInstallation, alteration and repair of all plumbing when performed solely within property lines and not on public easements or right-of-ways, except as hereinafter provided.\u003cbr\u003eInstallation, alteration and repair of all piping, fixtures and appliances related to water supply, including pressure vessels and tanks (excluding municipal or related water supply systems); venting and sanitary drainage systems for all fluid, semi-fluid and organic wastes; septic tanks and leaching lines; roof leaders; lawn sprinklers; water conditioning equipment; piping and equipment for swimming pools.\u003cbr\u003eAlso included are piping, fixtures, appliances and pressure vessels for manufactured and natural gases, compressed air and vacuum systems, petroleum, fuel oil, non-potable liquids, hot water heating and hot water supply systems operating at pressures not exceeding 30 psig or temperatures not exceeding 220°F; steam heating and steam supply systems not exceeding 15 psig operating pressure; gas or oil fired space heaters and furnaces, excluding duct work. Piping for water cooling systems, excluding the refrigerant piping and equipment. Testing and balancing of hydronics systems.\u003cbr\u003eSewer, gas and water lines, and connections from structure to the nearest point of public supply or disposal may cross public or private easements or be installed within private easements. Pipe installed across public property may not be increased in size or make any other connection between the point of exit from private property to the point of connection at public supply or disposal. These lines shall not be installed parallel to main lines in public easements or right-of-ways.\u003c\/p\u003e\n\u003cp\u003eThe C-77 exam is 100 questions taken over 240 minutes. The minimum required score to pass is a 70%.\u003c\/p\u003e\n\u003cp\u003eThe C-77 Solar exam is 30 questions taken over 75 minutes. The minimum required score to pass is a 70%. \u003c\/p\u003e\n\u003cp\u003eThe reference material listed above was used to prepare the questions for this examination. The examination may also contain questions based on trade knowledge or general industry practices. Except for Code books, you can base your answers on later editions of references as they become available. For Code questions, the examinations will be based only on the edition of the Code book that is listed.\u003cbr\u003e\u003cbr\u003eCandidates may use a silent, nonprinting, non-programmable calculator in the examination center.\u003c\/p\u003e\n\u003cp\u003eCandidates are responsible for bringing their own references to the examination center. Reference materials may be highlighted, underlined, annotated and\/or indexed prior to the examination session. However, references may not be written in during the examination session. Any candidate caught writing, highlighting, underlining and\/or indexing in the references during the examination will be reported to the Arizona Registrar of Contractors. Furthermore, candidates are not permitted to bring in any additional papers (loose or attached) with their approved references. References may be tabbed\/indexed with permanent tabs only. (permanent tabs are defined as tabs that would tear the page if removed). Temporary tabs, (defined as Post-It notes, or other tabs that may be removed without tearing the page) are not allowed and must be removed from the reference before the exam will begin. If you are downloading from the Internet, you may bring this reference into the testing center with you as long as it is bound. You can have it spiral bound or you may hole-punch it and put it in a binder. \u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e","brand":"brown-states","offers":[{"title":"Default Title","offer_id":45014862561333,"sku":"19021214744633","price":1754.24,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/arizona_1024x1024_2x_642c8048-48a0-465f-a333-498469fd3ae2.png?v=1772081987","url":"https:\/\/contractorexampreps.com\/products\/arizona-c-77-cr-77-plumbing-including-solar-certification-package","provider":"Contractor Exam Preps","version":"1.0","type":"link"}