{"title":"North Carolina","description":"","products":[{"product_id":"north-carolina-psi-building-contractor-exam-prep","title":"North Carolina PSI Building Contractor Exam Prep Course","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eNorth Carolina PSI Building Contractor Exam Prep Course\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eNorth Carolina PSI Building Contractor Exam Prep Course, for the North Carolina Licensing Board for General Contractors Building Contractor classification, prepares candidates for the PSI computer-based, open-book North Carolina Building Contractor license exam, which consists of 90 questions in 200 minutes with a 70% minimum passing score. :contentReference[oaicite:0]{index=0} The course provides one year of online access with instruction videos and reading material on test-taking techniques, highlighting and tabbing locations for every required reference book, and hundreds of practice questions and final exams organized by book so candidates learn where to locate answers quickly during the PSI exam. :contentReference[oaicite:1]{index=1} Aligned with the Building Contractor classification scope, the training reinforces content related to commercial, industrial, institutional, and all residential building construction, parking decks, site work, grading and paving, storm drainage, retaining and screen walls, and indoor and outdoor recreational facilities, while integrating business and law, OSHA safety, structural concrete, masonry, roofing, and North Carolina State Building Code requirements that appear in the approved exam book list and are supported by optional pre-printed tab sets. \u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eNorth Carolina Building Contractor Course for PSI Exams\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eAt 1 Exam Prep, we have the proven process of passing any open book contractor exam.\u003c\/p\u003e\n\u003cp\u003eOur online instruction videos make it convenient and easy for EVERY type of student who is attempting to obtain a contractors license.\u003c\/p\u003e\n\u003cp\u003eOur course gives you:\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003eOne (1) year of access to our online course.\u003c\/li\u003e\n\u003cli\u003eHighlighting and tabbing locations for every required book. \u003c\/li\u003e\n\u003cli\u003eHundreds of practice questions. We base these per book so you can understand which questions come from which book to better know where to find the answer, as well as final exams to reinforce your test taking skills.\u003c\/li\u003e\n\u003cli\u003eOver an hour of videos and reading material of test taking techniques, which from our feedback is the most effective part of any open book exam.\u003c\/li\u003e\n\u003cli\u003e We also have a price match guarantee and will beat any price on the books.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003cp\u003eNote: This classification covers all building construction activity including: commercial, industrial, institutional, and all residential building construction. It includes parking decks; all site work, grading and paving of parking lots, driveways, sidewalks, and gutters; storm drainage, retaining or screen walls, and hardware and accessory structures; and indoor and outdoor recreational facilities including natural and artificial surface athletic fields, running tracks, bleachers and seating. It also covers work done under the specialty classifications of S(Concrete Construction), S(Insulation), S(Interior Construction), S(Marine Construction), S(Masonry Construction), S(Roofing), S(Metal Erection), S(Swimming Pools), and S(Asbestos).\u003c\/p\u003e","brand":"Contractor Exam Preps","offers":[{"title":"Default Title","offer_id":13397377843253,"sku":"491408-A","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/products\/North_Carolina_Building_Contractor_Course_grande_4b6934fe-1990-4780-bbf4-9fe02eaf79b3.png?v=1551292301"},{"product_id":"north-carolina-psi-masonry-construction","title":"North Carolina PSI Masonry Construction Online Course","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eNorth Carolina PSI Masonry Construction Online Course\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe North Carolina PSI Masonry Construction Online Course prepares candidates for the 50-question, 120-minute open-book exam administered by PSI Services LLC under the authority of the North Carolina Licensing Board for General Contractors. The course covers exam-domains including safety, concrete block masonry, brickwork, specialty masonry, mortar\/grout techniques, laws \u0026amp; regulations, and general building code requirements as required for the masonry construction classification. One year of online access is included, with instructional videos, highlighting\/tabbing guidance for each required reference book, and hundreds of practice questions. \u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eNorth Carolina Building Contractor Course for PSI Exams\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eAt 1 Exam Prep, we have the proven process of passing any open book contractor exam.\u003c\/p\u003e\n\u003cp\u003eOur online instruction videos make it convenient and easy for EVERY type of student who is attempting to obtain a contractors license.\u003c\/p\u003e\n\u003cp\u003eOur course gives you:\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003eOne (1) year of access to our online course that includes updated information from feedback from our students.\u003c\/li\u003e\n\u003cli\u003eHighlighting and tabbing locations for every required book. THE ACTUAL TABS (BLANK OR PREPRINTED) ARE AT AN EXTRA COST. ($25 for 375 blank tabs, or $50-$100 for preprinted tabs, depending on your course.)\u003c\/li\u003e\n\u003cli\u003eHundreds of practice questions. We base these per book so you can understand which questions come from which book to better know where to find the answer, as well as final exams to reinforce your test taking skills.\u003c\/li\u003e\n\u003cli\u003eOver an hour of videos and reading material of test taking techniques, which from our feedback is the most effective part of any open book exam.\u003c\/li\u003e\n\u003cli\u003e We also have a price match guarantee and will beat any price on the books.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003cp\u003eNote: This classification covers all building construction activity including: commercial, industrial, institutional, and all residential building construction. It includes parking decks; all site work, grading and paving of parking lots, driveways, sidewalks, and gutters; storm drainage, retaining or screen walls, and hardware and accessory structures; and indoor and outdoor recreational facilities including natural and artificial surface athletic fields, running tracks, bleachers and seating. It also covers work done under the specialty classifications of S(Concrete Construction), S(Insulation), S(Interior Construction), S(Marine Construction), S(Masonry Construction), S(Roofing), S(Metal Erection), S(Swimming Pools), and S(Asbestos).\u003c\/p\u003e","brand":"Contractor Exam Preps","offers":[{"title":"Default Title","offer_id":13397378170933,"sku":"723094-A","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/products\/North_Carolina_Building_Contractor_Course_57e07101-a6e6-45e9-9cb0-b5b4fba73a67_grande_1.png?v=1551292450"},{"product_id":"north-carolina-psi-residential-contractor","title":"North Carolina PSI Residential Contractor Online Course","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eNorth Carolina PSI Residential Contractor Online Course\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe North Carolina PSI Residential Contractor Online Course prepares candidates for the PSI Services LLC-administered Residential Contractor exam required by the North Carolina Licensing Board for General Contractors. It aligns with the exam’s 90-question, open-book format and covers domains such as business\/law, estimating and bidding, residential building code, energy conservation, project management, and related trades.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003eNorth Carolina State Residential Building Contractor Licensing Home Study Course- ONLINE!! Study whenever you want to study! No classrooms. 40 hours of study material that you can review as many times as you want over the course of 6 months. Included in prep are tab and highlight locations for all the books, thousands of practice questions and answers, videos with general knowledge and test taking techniques. Also, a phone number and email address will be provided for an instructor that you may call or email as many times as you want at no extra charge! We also sell all the books needed for the exam.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003ePSI Exam online prep course.\u003c\/p\u003e","brand":"Contractor Exam Preps","offers":[{"title":"Default Title","offer_id":13397378531381,"sku":"582306-A","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/products\/North_Carolina_Residential_Contractor_Course_grande_5662322e-b3ca-4b1b-8b01-950a8f3f5baf.png?v=1551292555"},{"product_id":"north-carolina-psi-business-management-and-law-1","title":"North Carolina PSI Business Management and Law Online Course","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eNorth Carolina PSI Business Management and Law Online Course\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThis online exam prep course from Contractor Exam Preps is designed for the North Carolina Licensing Board for General Contractors exam administered by PSI Services LLC and covers core topics including business organisation, financial management, contract law, estimating \u0026amp; bidding, labour and tax laws, risk management, lien and bond statutes, and erosion \u0026amp; sedimentation control. :contentReference[oaicite:2]{index=2} It aligns with the official open-book exam outline of 40 multiple-choice questions, 90 minutes time limit and a 70 % passing score. :contentReference[oaicite:3]{index=3} The course includes test-taking strategy modules, instructional videos, tabbing and highlighting guidance for approved reference materials, and one-year online access to support study readiness for the state licensing examination.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eNorth Carolina Business Management and Law Course for PSI Exams\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eAt 1 Exam Prep, we have the proven process of passing any open book contractor exam. Our online instruction videos make it convenient and easy for EVERY type of student who is attempting to obtain a contractor's license. Our course gives you:\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003equick-description\u003c\/strong\u003e\u003c\/p\u003e\n\u003cspan\u003eOur North Carolina Business and Law Online Course Exam Prep includes:\u003c\/span\u003e\u003cspan\u003e\u003c\/span\u003e\n\u003cli\u003eHighlight \u0026amp; Tab locations for the references books\u003c\/li\u003e\n\u003cli\u003e1 hour test taking techniques lesson Book Overview videos\u003c\/li\u003e\n\u003cli\u003ePractice Exams with 100's Practice Questions\u003c\/li\u003e\n\u003cli\u003eHours of Instructional Videos\u003c\/li\u003e\n\u003cli\u003eEmail and Phone Number to Instructor\u003c\/li\u003e\n\u003cli\u003eUnlimited access to Online Exam Prep for 1 year\u003c\/li\u003e","brand":"Contractor Exam Preps","offers":[{"title":"Default Title","offer_id":14087534313525,"sku":"763215-A","price":195.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/products\/North_Carolina_Business_Management_And_Law_Course_large_22833daa-03c1-4e47-a558-676085d9c2e5.png?v=1554386891"},{"product_id":"north-carolina-residential-book-package","title":"North Carolina Residential Book Package","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eNorth Carolina Residential Book Package\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThis book package is aligned with the North Carolina Residential contractor exam administered by PSI Services LLC and includes the state-approved references used for the open-book licensing test, supporting domains such as sitework, concrete, masonry, carpentry, roofing, structural requirements, and OSHA 29 CFR 1926 safety. The package matches the Residential classification scope established by the North Carolina Licensing Board for General Contractors, enabling candidates to navigate construction codes, building methods, and project-management regulations efficiently during exam preparation.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003eIncludes the following books:\u003c\/p\u003e\n\u003cp\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with latest available amendments\u003c\/p\u003e\n\u003cp\u003eContractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th ed\u003c\/p\u003e\n\u003cp\u003eNorth Carolina State Building Code: Residential Code 2018\u003c\/p\u003e\n\u003cp\u003eNorth Carolina State Building Code: Administrative Code and Policies, 2018\u003c\/p\u003e","brand":"Contractor Exam Preps","offers":[{"title":"Default Title","offer_id":32108629622837,"sku":"","price":525.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/products\/NCResi2018.jpg?v=1591371788"},{"product_id":"north-carolina-building-contractor-book-package","title":"North Carolina Building Contractor Exam Book Package","description":"","brand":"1 Exam Prep","offers":[{"title":"Complete Book Set","offer_id":45921247363125,"sku":"36970313547833","price":2100.0,"currency_code":"USD","in_stock":true},{"title":"Complete Book Set + Highlighted \u0026 Tabbed [+$1000]","offer_id":45921247395893,"sku":"36970313547834","price":3100.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026_NEW_PRODUCTS-41-NC-BUILDING-BOOKS.jpg?v=1787587477"},{"product_id":"north-carolina-building-contractor-books-pre-printed-tabs","title":"North Carolina Building Contractor Books Pre Printed Tabs","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eNorth Carolina Building Contractor Books Pre Printed Tabs\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe North Carolina Building Contractor Books Pre Printed Tabs are prepared for the PSI-administered building contractor exam required by the North Carolina State Licensing Board for General Contractors. These tabs correspond to the approved open-book references and organize key building construction subjects including sitework, foundations, concrete, masonry, framing, structural systems, roofing, interior and exterior finishes, code navigation, and OSHA job-site safety. The pre-printed tab system supports efficient access to essential sections of the building contractor reference materials during the North Carolina licensing examination.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003eIncludes pre printed tabs for the following books:\u003c\/p\u003e\n\u003cp\u003eSports Fields Design, Construction and Maintenance, Second Edition, 2010\u003c\/p\u003e\n\u003cp\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with latest available amendments\u003c\/p\u003e\n\u003cp\u003eContractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/p\u003e\n\u003cp\u003eNorth Carolina State Building Code: Building Code 2018\u003c\/p\u003e\n\u003cp\u003eACI 530\/530.1-13 : Building Code Requirements and Specification for Masonry Structures and Companion Commentaries\u003c\/p\u003e\n\u003cp\u003eACI 318-14: Building Code Requirements for Structural Concrete and Commentary\u003c\/p\u003e\n\u003cp\u003eNorth Carolina State Building Code: Administrative Code and Policies, 2018\u003c\/p\u003e\n\u003cp\u003eANSI A117.1-2017 Accessible and Usable Buildings and Facilities, 2017\u003c\/p\u003e\n\u003cp\u003eLaws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/p\u003e","brand":"Contractor Exam Preps","offers":[{"title":"Default Title","offer_id":32120592465973,"sku":"","price":99.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/products\/tabs_f79bf898-3d77-4542-8ae8-b760ab4641b6.jpg?v=1591794897"},{"product_id":"north-carolina-residential-books-pre-printed-tabs","title":"North Carolina Residential Books Pre Printed Tabs","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eNorth Carolina Residential Books Pre Printed Tabs\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe North Carolina Residential Books Pre Printed Tabs are structured for the PSI-administered residential contractor exam overseen by the North Carolina State Licensing Board for General Contractors. These tabs correspond to the approved open-book reference set and organize major residential construction topics including site preparation, foundations, concrete, masonry, framing, roofing, structural requirements, interior and exterior finishes, building code navigation, and OSHA job-site safety. The pre-printed design supports efficient, exam-focused navigation of residential code sections and trade standards during the North Carolina licensing examination.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003eTabs for the following are included in this package:\u003c\/p\u003e\n\u003cp\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with latest available amendments\u003c\/p\u003e\n\u003cp\u003eContractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition \u003c\/p\u003e\n\u003cp\u003eNorth Carolina State Building Code: Residential Code 2018\u003c\/p\u003e\n\u003cp\u003eNorth Carolina State Building Code: Administrative Code and Policies, 2018\u003c\/p\u003e","brand":"Contractor Exam Preps","offers":[{"title":"Default Title","offer_id":32120602492981,"sku":"","price":49.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/products\/tabs_5e7924ef-0652-4011-b475-2a5231835bf2.jpg?v=1591795252"},{"product_id":"north-carolina-masonry-contractor-book-package","title":"North Carolina Masonry Construction Contractor Exam Book Package","description":"","brand":"1 Exam Prep","offers":[{"title":"Contractor Book Package","offer_id":45921247232053,"sku":"36970339532857","price":850.0,"currency_code":"USD","in_stock":true},{"title":"Contractor Book Package + Highlighted \u0026 Tabbed [+$550]","offer_id":45921247264821,"sku":"36970339532858","price":1400.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026_NEW_PRODUCTS-47-NC-MASONRY-BOOKS.jpg?v=1787587474"},{"product_id":"north-carolina-masonry-books-pre-printed-tabs","title":"North Carolina Masonry Books Pre Printed Tabs","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eNorth Carolina Masonry Books Pre Printed Tabs\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe North Carolina Masonry Books Pre Printed Tabs are organized for the PSI-administered masonry contractor exam required by the North Carolina State Licensing Board for General Contractors. These tabs correspond to the approved open-book references and group key masonry subjects including brick and block construction, mortar and grout specifications, reinforcing placement, wall systems, flashing, moisture control, masonry tools and methods, and OSHA safety requirements. The pre-printed layout supports efficient navigation of masonry standards and code sections during the North Carolina licensing examination.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003eIncludes pre printed tabs for the following:\u003c\/p\u003e\n\u003cp\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with latest available amendments\u003c\/p\u003e\n\u003cp\u003eNorth Carolina State Building Code: Building Code 2018\u003c\/p\u003e\n\u003cp\u003eACI 530\/530.1-13 : Building Code Requirements and Specification for Masonry Structures and Companion Commentaries\u003c\/p\u003e\n\u003cp\u003eNorth Carolina State Building Code: Administrative Code and Policies, 2018\u003c\/p\u003e","brand":"Contractor Exam Preps","offers":[{"title":"Default Title","offer_id":32120610553909,"sku":"","price":49.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/products\/tabs_e3de52fb-a875-4812-9959-6d5d50177988.jpg?v=1591795606"},{"product_id":"north-carolina-roofing-contractor-book-package","title":"North Carolina Roofing Contractor Book Package","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eNorth Carolina Roofing Contractor Book Package\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe North Carolina Roofing Contractor Book Package is aligned with the PSI-administered roofing exam required by the North Carolina State Licensing Board for General Contractors. The package includes the approved open-book references covering roof deck preparation, underlayment systems, shingle and membrane installation, flashing and waterproofing standards, roof drainage components, structural considerations, and OSHA job-site safety requirements. These texts support mastery of the roofing trade topics evaluated on the North Carolina roofing contractor licensing examination.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003eIncluded the following books which are allowed into the exam:\u003c\/p\u003e\n\u003cp\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with latest available amendments\u003c\/p\u003e\n\u003cp\u003eNorth Carolina State Building Code: Building Code 2018\u003c\/p\u003e\n\u003cp\u003eContractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/p\u003e\n\u003cp\u003eNorth Carolina State Building Code: Administrative Code and Policies, 2018 \u003c\/p\u003e\n\u003cp\u003eNRCA Roofing Manual: Steep Slope Roof Systems, 2025\u003c\/p\u003e\n\u003cp\u003eNRCA Roofing Manual: Metal Panel and SPF Roof Systems, 2024\u003c\/p\u003e\n\u003cp\u003eNRCA Roofing Manual: Membrane Roofing Systems, 2023\u003c\/p\u003e","brand":"Contractor Exam Preps","offers":[{"title":"Default Title","offer_id":32120635621429,"sku":"","price":949.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/products\/NCBuild2018_5caf424a-4fda-4595-a1f5-e5a0fe0ab955.jpg?v=1591796525"},{"product_id":"north-carolina-roofing-books-pre-printed-tabs","title":"North Carolina Roofing Books Pre Printed Tabs","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eNorth Carolina Roofing Books Pre Printed Tabs\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe North Carolina Roofing Books Pre Printed Tabs are designed for the PSI-administered North Carolina roofing contractor exam and correspond to the approved open-book reference list required by the North Carolina State Licensing Board for General Contractors. The tab set organizes core roofing topics such as roof deck preparation, underlayment systems, shingle and membrane installation methods, flashing and waterproofing, roof drainage components, structural considerations, and OSHA job-site safety standards. These pre-printed tabs support efficient navigation of roofing codes and trade references during the state licensing examination.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003eIncludes Pre printed tabs for the following books:\u003c\/p\u003e\n\u003cp\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with latest available amendments\u003c\/p\u003e\n\u003cp\u003eNorth Carolina State Building Code: Building Code 2018\u003c\/p\u003e\n\u003cp\u003eContractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/p\u003e\n\u003cp\u003eNorth Carolina State Building Code: Administrative Code and Policies, 2018 \u003c\/p\u003e\n\u003cp\u003eNRCA Roofing Manual: Steep Slope Roof Systems, 2025\u003c\/p\u003e\n\u003cp\u003eNRCA Roofing Manual: Metal Panel and SPF Roof Systems, 2024\u003c\/p\u003e\n\u003cp\u003eNRCA Roofing Manual: Membrane Roofing Systems, 2023\u003c\/p\u003e","brand":"Contractor Exam Preps","offers":[{"title":"Default Title","offer_id":32120637816885,"sku":"","price":99.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/products\/tabs_cdaa6d9b-b765-4e0a-9b6a-b59d985379fc.jpg?v=1591796675"},{"product_id":"north-carolina-psi-roofing-contractor-online-course","title":"North Carolina PSI Roofing Contractor Online Course","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eNorth Carolina PSI Roofing Contractor Online Course\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe North Carolina PSI Roofing Contractor Online Course is designed for candidates preparing for the roofing contractor licensing exam administered by PSI Services LLC under the North Carolina State Licensing Board for General Contractors. The course aligns with the exam’s open-book format and covers key roofing contractor topics, including roof deck and structural preparation, underlayment systems, shingle and membrane roofing installations, flashing and waterproofing techniques, roof drainage design, fasteners and attachment systems, and OSHA 29 CFR Part 1926 job-site safety requirements. The online format includes study modules, reference-navigation guidance, numerous practice questions, and one-year access to support efficient preparation for the North Carolina roofing contractor examination.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003eGet one step closer to becoming a North Carolina Roofing contractor with a prep course designed by Contractor Exam Preps to help you conquer the required North Carolina PSI Roofing computer based\u003cspan\u003e \u003c\/span\u003eexamination.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cspan\u003e1-hour test-taking techniques and practice exams\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eSimulated exams similar to the actual test with hundreds of questions\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eBook overview and instructional videos\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003e1 year of online access\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Contractor Exam Preps","offers":[{"title":"Default Title","offer_id":32120642175029,"sku":"","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/products\/generic_online_course_image_360x_bf766ab9-a626-44ab-aa7c-77fa353c5115.png?v=1591796813"},{"product_id":"north-carolina-state-building-code-building-code-2018","title":"North Carolina State Building Code: Building Code 2018","description":"","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":32265371713589,"sku":"18266204635193","price":180.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/NC_Build_2018.jpg?v=1787588625"},{"product_id":"nascla-north-carolina-electrical-13th-edition","title":"North Carolina NASCLA Contractors Guide to Business, Law and Project Management, NC Electrical 13th Edition","description":"","brand":"NASCLA","offers":[{"title":"Default Title","offer_id":32310300573749,"sku":"9781-948558129","price":129.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/NCNASCLAElectrical.png?v=1787588371"},{"product_id":"nascla-north-carolina-electrical-13th-edition-with-pre-printed-tabs","title":"NASCLA NORTH CAROLINA Electrical, 13th Edition with pre printed tabs","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eNASCLA North Carolina Electrical, 13th Edition with Pre-Printed Tabs\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThis edition of the NASCLA North Carolina Electrical reference is prepared with professionally applied pre-printed tabs to support candidates taking the PSI-administered North Carolina electrical licensing exam. The tab set is organized to provide rapid navigation through code requirements, electrical theory fundamentals, installation standards, conductor and raceway provisions, load calculations, grounding and bonding, equipment specifications, and safety regulations, ensuring quick access to essential sections during the open-book test.\u003c\/p\u003e\u003cbr\u003e\nBooks comes with pre printed tabs that you place.","brand":"Contractor Exam Preps","offers":[{"title":"Default Title","offer_id":32310316924981,"sku":"","price":134.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/products\/20200630_141818_22511_a66fa923-a87c-4db5-a543-864e383c68e8.png?v=1598979067"},{"product_id":"north-carolina-unlimited-electrical-online-prep","title":"North Carolina Unlimited Electrical Online Prep","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eNorth Carolina Unlimited Electrical Online Prep\u003c\/h1\u003e\n\u003cp style=\"text-align:center;\"\u003eThe North Carolina Unlimited Electrical Online Prep course, via Contractor Exam Preps, aligns with the North Carolina Board of Electrical Contractors (NCBEEC) licensing exam administered by PSI Services LLC and is designed to prepare candidates for the Unlimited Electrical Contractor classification. It offers one year of online access, instructional modules including a test-taking techniques video, practice exams with hundreds of simulated questions, and highlights\/tabs guidance to navigate the required reference materials included with the course. The curriculum covers core code topics such as conductor sizing, over-current protection, load calculations, voltage drop, and the use of the 2020 National Electrical Code as part of the open-book exam format.\u003c\/p\u003e\u003cbr\u003e\n\u003cp data-mce-fragment=\"1\"\u003eGet one \u003cnobr data-mce-fragment=\"1\"\u003estep\u003c\/nobr\u003e closer to becoming a North Carolina Unlimited Electrical Contractor\u003cspan data-mce-fragment=\"1\"\u003e \u003c\/span\u003ewith a prep course designed by 1ExamPrep to help you conquer the required North Carolina PSI Unlimited Electrical Contractor\u003cspan data-mce-fragment=\"1\"\u003e \u003c\/span\u003eexamination.\u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003eUse the \u003cnobr data-mce-fragment=\"1\"\u003e\u003c\/nobr\u003e\u003cnobr data-mce-fragment=\"1\"\u003eonline\u003c\/nobr\u003e course structure to tailor your prep to your individual learning style. You’ll have a full year of \u003cnobr data-mce-fragment=\"1\"\u003e\u003c\/nobr\u003e\u003cnobr data-mce-fragment=\"1\"\u003eaccess\u003c\/nobr\u003e to the online course.\u003c\/p\u003e\n\u003cul data-mce-fragment=\"1\"\u003e\n\u003cli data-mce-fragment=\"1\"\u003e1-hour test-taking techniques and practice exams\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eHighlights and Tabs locations for all reference materials\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003eBook overview and instructional videos\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003ePractice Exams with 100's of test questions in a simulated format\u003c\/li\u003e\n\u003cli data-mce-fragment=\"1\"\u003e1 year of online \u003cnobr data-mce-fragment=\"1\"\u003eaccess\u003c\/nobr\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cnobr data-mce-fragment=\"1\"\u003eAndroid\u003c\/nobr\u003e and iOS \u003cnobr data-mce-fragment=\"1\"\u003eCompatible\u003c\/nobr\u003e - \u003cnobr data-mce-fragment=\"1\"\u003eComplete\u003c\/nobr\u003e the course on your phone, anytime or anywhere.\u003c\/p\u003e","brand":"Contractor Exam Preps","offers":[{"title":"Default Title","offer_id":40423374454837,"sku":"","price":225.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/products\/online_course_generic_large_540x_2d10b67b-6a7d-46ff-b726-bad453a9581a.png?v=1641848520"},{"product_id":"north-carolina-nascla-contractors-guide-to-business-law-and-project-management-north-carolina-general-pre-tabbed-and-highlighted","title":"NORTH CAROLINA-NASCLA Contractors Guide to Business, Law and Project Management North Carolina General, 10th Edition Pre Tabbed and Highlighted","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eNORTH CAROLINA-NASCLA Contractors Guide to Business, Law and Project Management – North Carolina General, 10th Edition (Pre-Tabbed \u0026amp; Highlighted)\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThis pre-tabbed and highlighted edition of the Contractors Guide to Business, Law and Project Management for the North Carolina General contracting exam is organized into three parts: planning\/start-up (business structure, licensing, insurance, marketing), core operations (estimating, contracts, scheduling, project \u0026amp; safety management), and admin functions (financial management, taxes, lien laws). The book arrives with permanent quick-reference tabs and highlighted key sections to streamline navigation during the open-book portion of the exam.\u003c\/p\u003e\u003cbr\u003e\n\u003cp style=\"text-align: center;\"\u003e\u003cspan style=\"color: #fc0a0a;\"\u003e\u003cstrong\u003e\u003cem\u003ePlease allow 7 - 10 business days for delivery as this is a special order product.\u003c\/em\u003e\u003c\/strong\u003e\u003c\/span\u003e \u003c\/p\u003e\n\u003cp\u003eOur tabbed and highlighted exam ready books are skillfully tabbed and highlighted by professionals. Your book will come affixed with permanent quick reference tabs printed with the chapter titles and other important sections to help you quickly and easily navigate through the book during your exam. Key areas will already be vibrantly highlighted so you know what subjects are relevant while saving time preparing for your exam. \u003c\/p\u003e\n\u003cp\u003eThe NASCLA Contractors Guide to Business, Law and Project Management is organized into three sections.\u003c\/p\u003e\n\u003cp\u003ePart 1 Focuses on planning and starting your business. This section will help you formulate a business plan, choose a business structure, understand licensing and insurance requirements and gain basic management and marketing skills.\u003c\/p\u003e\n\u003cp\u003ePart 2 Covers fundamentals you will need to know in order to operate a successful construction business. This section covers estimating, contract management, scheduling, project management, safety and environmental responsibilities and building good relationships with employees, subcontractors and customers.\u003c\/p\u003e\n\u003cp\u003ePart 3 Provides valuable information to assist you in running the administrative function of your business. Financial management, tax basics, and lien laws are covered. Effective management of these areas of business is vital and failure proper attention. can cause serious problems.\u003c\/p\u003e\n\u003cp\u003e \u003cspan data-mce-fragment=\"1\"\u003eISBN: \u003cspan\u003e978-1-948558-38-9\u003c\/span\u003e\u003c\/span\u003e\u003cspan data-mce-fragment=\"1\"\u003e Highlighted and Tabbed\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003eAll products and company names are trademarksTM\u003cspan\u003e \u003c\/span\u003eor registered ® trademarks and\/or copyrights of their respective holders.  Use of them does not imply any affiliation with or endorsement by the respective holders.\u003c\/em\u003e\u003c\/p\u003e","brand":"Contractor Exam Preps","offers":[{"title":"Default Title","offer_id":40759787618357,"sku":"9781948558389+HL\/T","price":219.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/NorthCarolinaNASCLA10thEdition.jpg?v=1718293030"},{"product_id":"north-carolina-nascla-contractors-guide-to-business-law-and-project-management-north-carolina-general","title":"NORTH CAROLINA-NASCLA Contractors Guide to Business, Law and Project Management North Carolina General, 10th Edition","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eNORTH CAROLINA-NASCLA Contractors Guide to Business, Law and Project Management, North Carolina General, 10th Edition\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThis 10th edition of the NASCLA Contractors Guide to Business, Law and Project Management for the North Carolina General contractor exam is organized into three major parts: Part 1 addresses business planning and start-up (business structure, licensing requirements, insurance, marketing); Part 2 covers core operational fundamentals (estimating, contracts, scheduling, safety, project management, environmental responsibilities); and Part 3 focuses on administrative business functions (financial management, tax basics, lien laws and other legal-compliance topics). The guide aligns with the exam vendor’s scope for the North Carolina Licensing Board for General Contractors (NCLBGC) general contracting license and serves as the principal reference text for candidates preparing for that licensing exam. \u003cbr\u003e\n\u003c\/p\u003e\u003cdiv class=\"content\" data-mce-fragment=\"1\"\u003e\n\u003cdiv class=\"product-body\" data-mce-fragment=\"1\"\u003e\n\u003cp data-mce-fragment=\"1\"\u003eThe\u003cem data-mce-fragment=\"1\"\u003e\u003cspan data-mce-fragment=\"1\"\u003e NASCLA Contractors Guide to Business, Law and Project Management \u003c\/span\u003e\u003c\/em\u003eis organized into 3 sections. \u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cstrong data-mce-fragment=\"1\"\u003ePart 1\u003c\/strong\u003e\u003cspan data-mce-fragment=\"1\"\u003e \u003c\/span\u003efocuses on business planning and start up.  This section will help you formulate a business plan, choose a business structure, understand licensing and insurance requirements and gain basic management and marketing skills.\u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cstrong data-mce-fragment=\"1\"\u003ePart 2\u003c\/strong\u003e\u003cspan data-mce-fragment=\"1\"\u003e \u003c\/span\u003eis centered on fundamentals that you will need to operate a successful construction business.  This section will cover estimating, contract management, scheduling, project management, safety and environmental responsibilities and building good relationships with employees, subcontractors and customers.\u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cstrong data-mce-fragment=\"1\"\u003ePart 3\u003c\/strong\u003e\u003cspan data-mce-fragment=\"1\"\u003e \u003c\/span\u003egives you valuable information for running the administrative function of your business.  Financial management, tax basics and lien laws are covered.  Effective management of these areas of business is vital and can cause you serious problems if you do not give them the proper attention.\u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cspan\u003e ISBN: 978-1-948558-38-9\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e","brand":"Contractor Exam Preps","offers":[{"title":"Default Title","offer_id":40759790633013,"sku":"9781948558389","price":124.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/NorthCarolinaNASCLA10thEdition_17031a75-84a6-4431-a86a-6b37575cdd4d.jpg?v=1718293176"},{"product_id":"north-carolina-nascla-contractors-guide-to-business-law-and-project-management-north-carolina-general-9th-book-plus-tabs","title":"NORTH CAROLINA-NASCLA Contractors Guide to Business, Law and Project Management North Carolina General, 10th Edition Book Plus Tabs","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eNORTH CAROLINA-NASCLA Contractors Guide to Business, Law and Project Management – North Carolina General, 10th Edition (Book Plus Tabs)\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThis study set is tailored for the NASCLA North Carolina General contractor licensing exam and includes the 10th edition of the “Contractors Guide to Business, Law and Project Management” along with adhesive quick-reference tabs. The book covers contract law, business management, risk management, project scheduling, financial controls, and regulatory compliance aligned with exam scope. The included tabs are self-adhesive to help examinees quickly access sections during the open-book portion of the exam; however, whether tabs are permitted in the exam is at the discretion of the testing facility proctor.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003eIn addition to receiving the NASCLA Contractors Guide to Business, Law and Project Management, North Carolina General 10th Edition, you will also receive our quick reference tabs.\u003c\/p\u003e\n\u003cp\u003eOur permanent quick reference tabs will help you navigate quickly through this book during your exam. These tabs are self-adhesive and must be added at least one day prior for sufficient adhesive power.\u003c\/p\u003e\n\u003cp\u003ePlease note that the Testing Facility Proctor is the deciding factor on whether or not tabs will be accepted and allowed into the exam. If the tabs do not adhere properly, they will not be accepted.\u003c\/p\u003e\n\u003cp\u003e ISBN: \u003cspan data-mce-fragment=\"1\"\u003e\u003cspan\u003e978-1-948558-38-9\u003c\/span\u003e\u003c\/span\u003e\u003cspan data-mce-fragment=\"1\"\u003e \u003c\/span\u003e\u003cspan data-mce-fragment=\"1\"\u003ewith Tabs\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003eAll products and company names are trademarksTM\u003cspan\u003e \u003c\/span\u003eor registered ® trademarks and\/or copyrights of their respective holders.  Use of them does not imply any affiliation with or endorsement by the respective holders.\u003c\/em\u003e\u003c\/p\u003e\n\u003c!----\u003e","brand":"Contractor Exam Preps","offers":[{"title":"Default Title","offer_id":40759791353909,"sku":"9781948558389+TABS","price":134.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/NorthCarolinaNASCLA10thEdition_a418fdb5-5d4d-42e3-b58c-11a02c32047f.jpg?v=1718293303"},{"product_id":"north-carolina-application-processing","title":"North Carolina Application Processing","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eNorth Carolina Application Processing\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThis service assists applicants preparing for licensure through the North Carolina Licensing Board for General Contractors by guiding them through the application-submission phase: assembling required experience verifications, financial statements, trade classifications, and supporting documents, submitting the correct form and fee, and securing their examination eligibility prior to scheduling the licensing exams. The process aligns with the state’s licensing requirements for general, residential and specialty contractors in North Carolina.\u003c\/p\u003e\u003cbr\u003e","brand":"Contractor Exam Preps","offers":[{"title":"Default Title","offer_id":41301335801909,"sku":"","price":200.0,"currency_code":"USD","in_stock":true}]},{"product_id":"north-carolina-nascla-commercial-general-building-contractor-exam-complete-book-set-highlighted-tabbed","title":"North Carolina NASCLA Commercial General Building Contractor Exam Complete Book Set - Highlighted \u0026 Tabbed","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina NASCLA Commercial General Building Contractor Exam Complete Book Set - Highlighted \u0026amp; Tabbed\u003c\/h1\u003e\n\u003cp\u003ePrepare for the NASCLA Accredited Examination for Commercial General Building Contractors with a complete North Carolina reference package featuring highlighted and permanently tabbed books. This package combines the North Carolina NASCLA Business Book with the listed commercial construction codes, standards, manuals, and textbooks for organized business-law review and technical trade exam preparation.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina NASCLA Commercial General Building Contractor Exam Complete Book Set is designed for candidates who want an organized reference library for open-book study. Every book in the package is prepared with highlighting and permanent tabs to help candidates locate important chapters, definitions, code provisions, tables, construction procedures, safety requirements, and technical subjects more efficiently.\u003c\/p\u003e\n\u003cp\u003eThe included references address the broad knowledge required to supervise and manage commercial building projects. Topics include construction project management, jobsite administration, structural concrete, reinforcing steel, precast erection, post-tensioning, steel decking, steel joists, wood trusses, excavation, masonry, gypsum construction, carpentry, roofing, accessibility, federal safety regulations, commercial building codes, stormwater planning, exterior insulation systems, sustainable construction, and mechanical and electrical coordination.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina NASCLA Business Book supports preparation involving contractor business and law topics. Candidates can use it to review licensing responsibilities, business organization, contracts, estimating, financial management, employment practices, insurance, safety, project administration, and other subjects involved in operating a contracting business.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing requires more than bringing the correct publications into the testing room. Candidates must recognize the subject of each question, determine which reference is most likely to contain the answer, and locate the applicable information within the available testing period. A highlighted and tabbed library supports a consistent navigation method during study and practice.\u003c\/p\u003e\n\u003cp\u003ePlease allow an additional 15 business days for highlighted and tabbed book package orders. This additional preparation period allows the complete set to be assembled, reviewed, highlighted, permanently tabbed, and organized before shipment.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe NASCLA Accredited Examination for Commercial General Building Contractors is a standardized technical trade examination accepted by participating contractor licensing agencies. The North Carolina Licensing Board for General Contractors accepts the NASCLA examination for the Building classification.\u003c\/p\u003e\n\u003cp\u003eThe examination evaluates knowledge used to plan, coordinate, supervise, and complete commercial building projects involving multiple construction trades. Its broad scope reflects the responsibilities of a commercial general building contractor rather than the work of one specialty contractor.\u003c\/p\u003e\n\u003cp\u003eMajor subject areas represented by this complete book set include project management, jobsite operations, contracts, estimating, scheduling, safety, concrete, reinforcing steel, structural metals, wood trusses, precast construction, post-tensioning, masonry, excavation, carpentry, roofing, accessibility, commercial building codes, environmental controls, exterior systems, and mechanical and electrical systems.\u003c\/p\u003e\n\u003cp\u003eThe examination library includes both general construction textbooks and specialty technical references. Construction Jobsite Management and Construction Project Management support review of field supervision, project planning, documentation, scheduling, cost control, quality, communication, and closeout.\u003c\/p\u003e\n\u003cp\u003eConcrete subjects are distributed across ACI 318-19, Placing Reinforcing Bars, and The Contractor’s Guide to Quality Concrete Construction. Structural metal subjects are supported by the Steel Deck Institute manual and the technical digest covering steel joists and joist girders.\u003c\/p\u003e\n\u003cp\u003eAdditional specialty publications address wood-truss restraint and bracing, precast concrete erection, unbonded post-tensioning, masonry, gypsum systems, roofing, excavation, accessibility, stormwater controls, exterior insulation and finish systems, and mechanical and electrical coordination.\u003c\/p\u003e\n\u003cp\u003eAfter passing the NASCLA examination, a candidate can use the NASCLA National Examination Database to send an official transcript to North Carolina or another participating licensing agency. Candidates must still apply directly to the state licensing agency and satisfy its licensing requirements.\u003c\/p\u003e\n\u003cp\u003eA passing NASCLA result addresses the accepted technical examination requirement. It does not independently issue a North Carolina general contractor license, establish a license limitation, or authorize the candidate or business to perform regulated contracting work.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe NASCLA Accredited Examination for Commercial General Building Contractors is an open-book examination. Candidates are responsible for obtaining and bringing permitted references to the testing location. The testing center does not provide the complete examination library.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing allows candidates to consult approved publications, but it does not eliminate the need for preparation. The reference library contains thousands of pages across construction textbooks, codes, standards, manuals, and specialty guides.\u003c\/p\u003e\n\u003cp\u003eA productive open-book method begins with identifying the primary subject of the question. The candidate should then select the publication most likely to contain the answer and use the permanent tabs, index, table of contents, chapter headings, definitions, code sections, diagrams, or technical tables to locate the relevant information.\u003c\/p\u003e\n\u003cp\u003eStructural concrete questions may require ACI 318-19, while reinforcing-bar placement questions may involve Placing Reinforcing Bars. Concrete field-practice questions involving preparation, placement, consolidation, finishing, curing, testing, or quality control may be addressed in The Contractor’s Guide to Quality Concrete Construction.\u003c\/p\u003e\n\u003cp\u003eSteel-deck questions may require the SDI Manual of Construction with Steel Deck, while steel-joist questions may involve Technical Digest No. 9. Questions involving the handling, installation, restraint, and bracing of wood trusses may require the BCSI guide.\u003c\/p\u003e\n\u003cp\u003ePrecast erection questions may be located in the Erectors’ Manual, while unbonded post-tensioning questions may require the Level 1 Field Fundamentals publication. Masonry questions may involve Modern Masonry, and excavation or underground utility questions may require Pipe and Excavation Contracting.\u003c\/p\u003e\n\u003cp\u003eAccessibility questions may involve ICC A117.1, while broader commercial building-code questions may require the International Building Code. Federal construction-safety questions may involve 29 CFR Part 1926, and stormwater questions may require Developing Your Stormwater Pollution Prevention Plan.\u003c\/p\u003e\n\u003cp\u003eThe highlighting and permanent tabs in this package support faster reference navigation, but candidates should practice with the prepared books before examination day. Repeated use helps students understand what each tab represents and how highlighted information fits within the surrounding chapter, standard, or code section.\u003c\/p\u003e\n\u003cp\u003eAll books brought into the testing room must comply with current examination rules. Candidates should review the current candidate bulletin and avoid loose pages, removable notes, unauthorized inserts, or other materials that are not permitted.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the appropriate classification.\u003c\/strong\u003e Applicants pursuing broad building authority should review the North Carolina Building classification and make sure it corresponds with the work the business intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eChoose the requested license limitation.\u003c\/strong\u003e North Carolina licenses are issued with financial limitations that affect the value of projects the contractor may undertake.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the qualifier.\u003c\/strong\u003e The applicant must designate an individual whose approved examination supports the requested classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrepare for the NASCLA examination.\u003c\/strong\u003e Review the technical construction subjects and practice locating information throughout the highlighted and tabbed reference library.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApply for the NASCLA examination.\u003c\/strong\u003e Complete the current NASCLA application and examination-registration process.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePass the NASCLA examination.\u003c\/strong\u003e A passing result may be used toward the examination requirement for North Carolina’s Building classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTransmit the examination result.\u003c\/strong\u003e Send the official NASCLA transcript to the North Carolina Licensing Board for General Contractors through the National Examination Database.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the North Carolina application.\u003c\/strong\u003e Submit the requested business, ownership, qualifier, classification, limitation, and contact information.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide financial documentation.\u003c\/strong\u003e Submit the financial information required for the license limitation requested on the application.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete required disclosures.\u003c\/strong\u003e Provide accurate background and business information and complete any authorization required by the Board.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit fees and supporting records.\u003c\/strong\u003e Make sure the application contains all documents requested for the business structure and license limitation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive the license before contracting.\u003c\/strong\u003e The applicant must receive the applicable North Carolina general contractor license before undertaking work that requires state licensure.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates general contractor licensing in the state. A North Carolina general contractor license is required when the total value of a construction project is $40,000 or more.\u003c\/p\u003e\n\u003cp\u003eThe licensing requirement applies to individuals and business entities that bid, contract, or undertake covered construction projects. Applicants should obtain the correct license before offering or performing work that meets the state licensing threshold.\u003c\/p\u003e\n\u003cp\u003eThe Building classification covers qualifying building construction activity, including commercial, industrial, institutional, and residential building work within the classification’s authorized scope. Applicants should select the classification that accurately represents their intended projects.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina licenses are issued with financial limitations. The limitation affects the size of project the licensed contractor may undertake. Applicants must provide the financial information associated with the limitation they request.\u003c\/p\u003e\n\u003cp\u003eA qualifier supports the license through an examination approved for the requested classification. The qualifier must be properly connected with the licensed entity and remain associated with the business according to the Board’s requirements.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors accepts the NASCLA Accredited Examination for Commercial General Building Contractors for the Building classification. The NASCLA examination is administered through the NASCLA examination program rather than by the North Carolina Board.\u003c\/p\u003e\n\u003cp\u003eApplicants using a passing NASCLA result must still submit a complete North Carolina license application. The examination transcript does not replace the business, qualifier, financial, disclosure, fee, or supporting-document requirements.\u003c\/p\u003e\n\u003cp\u003eChanges involving the qualifier, legal business name, ownership, organization, or contact information should be handled through the procedures established by the North Carolina Licensing Board for General Contractors.\u003c\/p\u003e\n\u003cp\u003ePassing the examination and purchasing this complete book set do not guarantee license approval. The Board reviews the full application and determines whether the applicant has satisfied the requirements for the requested classification and limitation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina NASCLA Business Book\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eSupports preparation involving contractor business and law topics, including licensing, business organization, finance, estimating, contracts, insurance, employment responsibilities, safety, and project administration.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eConstruction Jobsite Management, 5th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers field supervision, jobsite planning, communication, documentation, productivity, quality control, safety, coordination, and daily construction operations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eConstruction Project Management, 5th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eReviews project organization, estimating, scheduling, contracts, cost control, risk management, communication, quality, and project closeout.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eACI 318-19: Building Code Requirements for Structural Concrete and Commentary\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides structural concrete requirements and commentary involving materials, reinforcement, design, durability, construction, and inspection.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBCSI: Guide to Good Practice for Handling, Installing, Restraining, and Bracing of Metal Plate Connected Wood Trusses, 2025\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAddresses recommended practices for receiving, handling, installing, restraining, and bracing metal plate connected wood trusses.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNASCLA Contractors’ Guide to Business, Law and Project Management, Basic 14th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eExplains contractor business practices, project management, finance, contracts, insurance, employment responsibilities, safety, and risk management.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eErectors’ Manual – Standards and Guidelines for the Erection of Precast Concrete Products, 2nd Edition, 1999\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers precast erection planning, handling, rigging, bracing, alignment, connections, field procedures, and safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTraining and Certification of Field Personnel for Unbonded Post-Tensioning – Level 1 Field Fundamentals, 3rd Edition, 2003\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eReviews field procedures for handling, installing, stressing, inspecting, and protecting unbonded post-tensioning systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSDI Manual of Construction with Steel Deck, 3rd Edition, 2016\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eExplains steel-deck receiving, storage, placement, fastening, construction loading, field modifications, and installation safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePipe and Excavation Contracting, Dave Roberts, 2011\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers excavation, grading, trenching, underground utilities, pipe installation, equipment, estimating, productivity, and site safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGypsum Construction Handbook, 7th Edition, 2014\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides information about gypsum products, wall and ceiling systems, fire-resistant assemblies, installation methods, finishing, and construction details.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePlacing Reinforcing Bars: Recommended Practices, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers reinforcing-bar identification, supports, placement, splices, tolerances, detailing, handling, and field installation.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTechnical Digest No. 9 – Handling and Erection of Steel Joists and Joist Girders, 3rd Edition, 2008\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides guidance for receiving, storing, handling, placing, bridging, and erecting steel joists and joist girders.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eModern Masonry – Brick, Block, Stone, Clois E. Kicklighter, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eReviews masonry materials, mortar, tools, layout, brick, concrete block, stone, estimating, construction methods, and safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrinciples and Practices of Commercial Construction, 11th Edition, Cameron K. Andres and Ronald C. Smith\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides broad coverage of commercial construction materials, structural systems, building components, sequencing, methods, and field practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCode of Federal Regulations – 29 CFR Part 1926, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eContains federal construction-safety requirements involving jobsite operations, fall protection, excavation, scaffolding, equipment, and electrical safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCarpentry and Building Construction, 2016 Student Edition, John L. Feirer and Mark D. Feirer\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers carpentry tools, construction materials, layout, foundations, framing, floors, walls, roofs, interiors, and common building procedures.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eICC A117.1 Accessible and Usable Buildings and Facilities, 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides accessibility criteria for routes, entrances, rooms, fixtures, controls, communication elements, and building features.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRoofing Construction and Estimating, Daniel Atcheson\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eReviews roofing systems, materials, installation methods, measurements, quantities, flashing, drainage, estimating, and project planning.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eThe Contractor’s Guide to Quality Concrete Construction, 4th Edition, 2018\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eExplains concrete materials, preparation, placement, consolidation, finishing, curing, testing, quality control, and problem prevention.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGreen Building Fundamentals, Michael Montoya, 2nd Edition, 2011\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eIntroduces sustainable construction, energy efficiency, water conservation, material selection, building performance, and indoor environmental quality.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eInternational Building Code, 2021 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eContains commercial building requirements involving occupancy, construction types, fire protection, means of egress, accessibility, structural provisions, and building systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeveloping Your Stormwater Pollution Prevention Plan – A Guide for Construction Sites\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eExplains stormwater planning, erosion and sediment controls, pollution prevention, inspections, documentation, and construction-site responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eANSI\/EIMA 99-A-2017: Standard for Exterior Insulation and Finish Systems and EIFS with Drainage\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides requirements involving exterior insulation and finish systems, materials, installation, drainage, flashing, joints, and system performance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMechanical and Electrical Systems for Construction Managers, 4th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers mechanical, plumbing, fire-protection, electrical, lighting, communication, and building-control systems coordinated during commercial construction.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBegin by separating the North Carolina business reference from the NASCLA technical library. This creates a focused plan for business-law review while allowing the construction references to be organized by trade subject.\u003c\/p\u003e\n\u003cp\u003eDivide the technical books into categories such as project management, safety, codes, accessibility, site work, concrete, masonry, structural systems, carpentry, roofing, environmental controls, exterior systems, and mechanical and electrical coordination.\u003c\/p\u003e\n\u003cp\u003ePractice selecting the correct publication before searching for an answer. Read a sample question, identify its central topic, choose the book most likely to contain the information, and use the permanent tabs, index, or table of contents to locate the applicable section.\u003c\/p\u003e\n\u003cp\u003eTimed navigation exercises help candidates build a repeatable open-book process. The objective is to recognize the subject, select the correct reference, find the supporting information, and evaluate the answer choices without searching unrelated books.\u003c\/p\u003e\n\u003cp\u003eReview missed questions carefully. An incorrect response may reveal a technical knowledge gap, an incorrect reference choice, misunderstood terminology, or an inefficient search method. Identifying the cause helps candidates use future study sessions more effectively.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina contractor candidates turn a large business and technical reference library into an organized exam-preparation system. The highlighted and permanently tabbed books reduce the initial setup work and provide a consistent structure for study.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review becomes more manageable when the references are grouped by subject. Candidates can connect questions involving concrete, masonry, steel, roofing, excavation, accessibility, safety, project management, and building systems with the publications most likely to contain the answers.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation encourages candidates to use the books actively. Students can work through questions, identify important terms, choose the appropriate publication, and use the prepared tabs to locate code provisions, definitions, diagrams, tables, and technical requirements.\u003c\/p\u003e\n\u003cp\u003eReference-navigation practice is especially important for the open-book NASCLA examination. Familiarity with the highlighting, indexes, chapters, code sections, and technical tables helps candidates develop a clearer and more efficient testing routine.\u003c\/p\u003e\n\u003cp\u003eThe included North Carolina business reference also supports review of contractor licensing, financial management, contracts, insurance, employment responsibilities, safety, and project administration.\u003c\/p\u003e\n\u003cp\u003eContractor Exam Prep does not guarantee a passing examination result, licensing approval, or license issuance. The complete highlighted and tabbed package provides organized study support, trade-focused references, navigation practice, and a confidence-building preparation structure.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFAQ Section\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in this complete book set?\u003c\/h2\u003e\n\u003cp\u003eThe package includes the North Carolina NASCLA Business Book and all 24 listed technical references for the NASCLA Commercial General Building Contractor examination. The books are highlighted and permanently tabbed.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does preparation of the package take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow an additional 15 business days for highlighted and tabbed book package orders.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes North Carolina accept the NASCLA examination?\u003c\/h2\u003e\n\u003cp\u003eYes. The North Carolina Licensing Board for General Contractors accepts the NASCLA Accredited Examination for Commercial General Building Contractors for the Building classification.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the NASCLA examination open book?\u003c\/h2\u003e\n\u003cp\u003eYes. Candidates may bring permitted references that comply with the current examination rules. The testing center does not provide the complete book library.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing NASCLA automatically issue a North Carolina license?\u003c\/h2\u003e\n\u003cp\u003eNo. Applicants must complete the North Carolina licensing process and satisfy the applicable qualifier, financial, classification, limitation, fee, and application requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhen is a North Carolina general contractor license required?\u003c\/h2\u003e\n\u003cp\u003eA North Carolina general contractor license is required when the total value of the construction project is $40,000 or more.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhy are the books highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eHighlighting identifies useful information, while permanent tabs help candidates reach important chapters, code sections, tables, and technical subjects more efficiently.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eShould I study with the prepared books before test day?\u003c\/h2\u003e\n\u003cp\u003eYes. Practice helps candidates learn which publication applies to each subject and become familiar with the highlighting and tabbing system.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the books provided at the testing center?\u003c\/h2\u003e\n\u003cp\u003eNo. Candidates are responsible for obtaining and bringing all permitted reference books to the examination location.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan I add loose notes to the references?\u003c\/h2\u003e\n\u003cp\u003eThe books must comply with current testing rules. Candidates should avoid loose pages, removable notes, unauthorized inserts, and other prohibited materials.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes purchasing this package guarantee a passing score?\u003c\/h2\u003e\n\u003cp\u003eNo. Examination performance depends on the candidate’s preparation, construction knowledge, reference familiarity, time management, and performance on test day.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Highlighted \u0026 Tabbed NASCLA Set","offer_id":45919406587957,"sku":null,"price":2854.0,"currency_code":"USD","in_stock":true},{"title":"Highlighted \u0026 Tabbed NASCLA Set + Online Course [+$395]","offer_id":45919406620725,"sku":null,"price":3249.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/NASCLA-COMMERCIAL-GENERAL-BUILDING-HT-NC_33eb6a9b-e5c1-4578-8ec2-08c1dbd6ebbb.jpg?v=1787553018"},{"product_id":"north-carolina-nascla-commercial-general-building-contractor-online-exam-prep-course","title":"North Carolina NASCLA Commercial General Building Contractor - Online Exam Prep Course","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina NASCLA Commercial General Building Contractor - Online Exam Prep Course\u003c\/h1\u003e\n\u003cp\u003ePrepare for the NASCLA Accredited Examination for Commercial General Building Contractors with an online exam prep course designed for North Carolina contractor candidates. This course provides organized commercial construction review, open-book reference-navigation practice, and a structured study approach for candidates pursuing the North Carolina Building classification.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina NASCLA Commercial General Building Contractor Online Exam Prep Course helps students work through the broad range of subjects associated with commercial general building construction. Course preparation focuses on project management, jobsite supervision, structural concrete, reinforcing steel, precast erection, post-tensioning, steel decking, steel joists, wood trusses, excavation, masonry, gypsum systems, carpentry, roofing, accessibility, safety, commercial building codes, stormwater controls, exterior insulation systems, and mechanical and electrical coordination.\u003c\/p\u003e\n\u003cp\u003eThe NASCLA examination is open book, but candidates must do more than bring the correct references into the testing room. They must recognize the subject of a question, identify the publication most likely to contain the answer, and locate the applicable definition, code provision, table, construction method, illustration, or technical requirement efficiently.\u003c\/p\u003e\n\u003cp\u003eThis online course supports that process through trade-focused review and practice-oriented study. Candidates can divide the examination material into manageable categories, work through important construction topics, identify weaker knowledge areas, and develop a repeatable method for using the reference library.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina accepts the NASCLA Accredited Examination for Commercial General Building Contractors for the Building classification. Passing the examination may satisfy the approved trade-examination requirement, but it does not automatically issue a North Carolina general contractor license. Applicants must complete the state licensing process and meet the requirements established by the North Carolina Licensing Board for General Contractors.\u003c\/p\u003e\n\u003cp\u003eThis product is an online exam prep course. The reference books listed below are separate unless the selected package specifically states that books are included.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe NASCLA Accredited Examination for Commercial General Building Contractors is a standardized technical trade examination accepted by participating contractor licensing agencies. It is designed for candidates seeking commercial general building authority or a comparable classification in an accepting jurisdiction.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors accepts the NASCLA examination for the Building classification. The Building classification covers broad building-construction activity, including commercial, industrial, institutional, and residential construction within the scope authorized by the Board.\u003c\/p\u003e\n\u003cp\u003eThe NASCLA examination evaluates knowledge used to plan, supervise, coordinate, and complete commercial construction projects involving multiple trades. Its scope reflects the responsibilities of a general building contractor rather than a contractor working in one specialty area.\u003c\/p\u003e\n\u003cp\u003eConstruction management subjects include jobsite planning, project organization, scheduling, cost control, estimating, contracts, communication, documentation, quality management, safety, and project closeout. Candidates should understand how these responsibilities affect the progress and administration of a commercial construction project.\u003c\/p\u003e\n\u003cp\u003eConcrete preparation includes structural concrete requirements, reinforcing-bar placement, concrete field practices, curing, testing, quality control, durability, and inspection. The course helps candidates connect these topics with ACI 318-19, Placing Reinforcing Bars, and The Contractor’s Guide to Quality Concrete Construction.\u003c\/p\u003e\n\u003cp\u003eStructural and specialty construction subjects include precast concrete erection, unbonded post-tensioning, steel deck installation, steel joist handling, wood-truss restraint and bracing, masonry construction, excavation, gypsum assemblies, carpentry, and roofing.\u003c\/p\u003e\n\u003cp\u003eCode and compliance preparation includes the International Building Code, ICC A117.1 accessibility criteria, federal construction-safety regulations, stormwater pollution prevention, and exterior insulation and finish systems. Mechanical and electrical coordination is also represented in the examination references.\u003c\/p\u003e\n\u003cp\u003eAfter passing the NASCLA examination, a candidate can use the NASCLA National Examination Database to send an official transcript to North Carolina or another participating licensing jurisdiction. The receiving licensing agency reviews the result as part of its application process.\u003c\/p\u003e\n\u003cp\u003eA passing NASCLA transcript addresses the accepted technical examination component. It does not replace the North Carolina license application, qualifier requirements, financial review, license limitation, business documentation, fees, disclosures, or final approval by the licensing Board.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe NASCLA Accredited Examination for Commercial General Building Contractors is an open-book examination. Candidates are responsible for obtaining and bringing permitted reference materials to the testing location. The testing center does not provide the complete examination library.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing allows candidates to consult approved publications, but it does not remove the need for preparation. The reference library contains thousands of pages across construction textbooks, codes, standards, manuals, and specialty technical guides.\u003c\/p\u003e\n\u003cp\u003eCandidates who are unfamiliar with the books may spend too much time searching unrelated material. A practical open-book strategy begins with identifying the primary construction subject of the question and selecting the reference most likely to contain the answer.\u003c\/p\u003e\n\u003cp\u003eAfter choosing a publication, the candidate should use the index, table of contents, chapter headings, definitions, code sections, diagrams, or technical tables to locate the relevant information. This method should be practiced repeatedly before test day.\u003c\/p\u003e\n\u003cp\u003eStructural concrete questions may require ACI 318-19, while reinforcing-bar placement questions may involve Placing Reinforcing Bars. Concrete field-practice questions involving placement, consolidation, finishing, curing, testing, or quality control may be found in The Contractor’s Guide to Quality Concrete Construction.\u003c\/p\u003e\n\u003cp\u003eSteel-deck questions may require the Steel Deck Institute Manual of Construction with Steel Deck, while questions about steel joists and joist girders may involve Technical Digest No. 9. Wood-truss questions may require the BCSI guide.\u003c\/p\u003e\n\u003cp\u003eQuestions involving precast concrete erection may be addressed in the Erectors’ Manual. Unbonded post-tensioning questions may require the Level 1 Field Fundamentals publication. Masonry questions may involve Modern Masonry, while excavation and underground utility questions may require Pipe and Excavation Contracting.\u003c\/p\u003e\n\u003cp\u003eAccessibility questions may require ICC A117.1, while broader commercial building-code questions may involve the International Building Code. Federal construction-safety questions may require 29 CFR Part 1926, and stormwater-planning questions may involve Developing Your Stormwater Pollution Prevention Plan.\u003c\/p\u003e\n\u003cp\u003eThe online course helps candidates practice connecting these subjects with the appropriate references. Students can develop a consistent process for recognizing a topic, choosing the correct publication, locating supporting information, and comparing the information with the available answers.\u003c\/p\u003e\n\u003cp\u003eAll reference materials brought into the testing room must comply with current examination rules. Candidates should review the applicable candidate bulletin and avoid unauthorized loose pages, removable notes, inserts, or other prohibited materials.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the appropriate North Carolina classification.\u003c\/strong\u003e Candidates pursuing broad building authority should review the Building classification and confirm that it matches the work the business intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eChoose the requested license limitation.\u003c\/strong\u003e North Carolina general contractor licenses include financial limitations that affect the value of projects the contractor may undertake.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the qualifier.\u003c\/strong\u003e The applicant must designate an individual whose approved examination supports the requested classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrepare for the NASCLA examination.\u003c\/strong\u003e Use the online course with the listed references to review commercial construction subjects and practice open-book navigation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApply for the NASCLA examination.\u003c\/strong\u003e Complete the current NASCLA application and examination-registration process.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePass the NASCLA Commercial General Building Contractor examination.\u003c\/strong\u003e The passing result may be used for North Carolina’s Building classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTransmit the NASCLA result.\u003c\/strong\u003e Send the official examination transcript to the North Carolina Licensing Board for General Contractors through the NASCLA National Examination Database.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the North Carolina license application.\u003c\/strong\u003e Submit the requested business, ownership, qualifier, classification, limitation, and contact information.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide financial documentation.\u003c\/strong\u003e Submit the financial records required for the license limitation requested by the applicant.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete required disclosures.\u003c\/strong\u003e Provide accurate background, ownership, organizational, and business information.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit fees and supporting documents.\u003c\/strong\u003e Make sure the application contains all materials required for the applicant’s business structure and requested license.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive the license before contracting.\u003c\/strong\u003e The applicant must obtain the appropriate North Carolina general contractor license before undertaking work that requires state licensure.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates general contractor licensing in the state. Contractors undertaking projects that meet the state licensing threshold must hold the appropriate license before bidding, contracting, or performing regulated work.\u003c\/p\u003e\n\u003cp\u003eThe Building classification covers qualifying building construction and demolition activity. Its scope includes commercial, industrial, institutional, and residential building construction, along with related work identified in the classification rules.\u003c\/p\u003e\n\u003cp\u003eThe license is issued to the individual or business entity named on the application. The applicant must identify a qualifier who has passed an examination approved for the requested classification.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors accepts the NASCLA Accredited Examination for Commercial General Building Contractors for the Building classification. The NASCLA organization administers the examination separately from the North Carolina licensing application.\u003c\/p\u003e\n\u003cp\u003eA passing NASCLA result does not replace the state application. Applicants must submit the requested business information, qualifier records, financial documentation, fees, disclosures, and supporting materials.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina licenses also include financial limitations. The limitation determines the size of projects a contractor is authorized to undertake. Applicants must provide financial information that supports the limitation requested on the application.\u003c\/p\u003e\n\u003cp\u003eThe qualifier must remain properly associated with the licensed entity. Changes involving the qualifier, ownership, legal business name, organization, or company structure should be handled through the procedures established by the Board.\u003c\/p\u003e\n\u003cp\u003eThe Board reviews the full application before issuing a license. Passing the examination or completing an online exam prep course does not independently authorize the candidate or business to perform licensed contracting work.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cp\u003eThe following publications support preparation for the NASCLA Commercial General Building Contractor examination. The books are separate from the online course unless the selected product package specifically states that references are included.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eConstruction Jobsite Management, 5th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers field supervision, jobsite planning, communication, documentation, productivity, quality control, safety, coordination, and daily construction operations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eConstruction Project Management, 5th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eReviews project organization, estimating, scheduling, contracts, cost control, risk management, communication, quality, and project closeout.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eACI 318-19: Building Code Requirements for Structural Concrete and Commentary\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides structural concrete requirements and commentary involving materials, reinforcement, design, durability, construction, and inspection.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBCSI: Guide to Good Practice for Handling, Installing, Restraining, and Bracing of Metal Plate Connected Wood Trusses, 2025\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAddresses recommended practices for receiving, handling, installing, restraining, and bracing metal plate connected wood trusses.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNASCLA Contractors’ Guide to Business, Law and Project Management, Basic 14th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eExplains contractor business practices, project management, finance, contracts, insurance, employment responsibilities, safety, and risk management.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eErectors’ Manual – Standards and Guidelines for the Erection of Precast Concrete Products, 2nd Edition, 1999\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers precast concrete erection planning, handling, rigging, bracing, alignment, connections, field procedures, and safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTraining and Certification of Field Personnel for Unbonded Post-Tensioning – Level 1 Field Fundamentals, 3rd Edition, 2003\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eReviews field procedures for handling, installing, stressing, inspecting, and protecting unbonded post-tensioning systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSDI Manual of Construction with Steel Deck, 3rd Edition, 2016\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eExplains steel-deck receiving, storage, placement, fastening, construction loading, field modifications, and installation safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePipe and Excavation Contracting, Dave Roberts, 2011\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers excavation, grading, trenching, underground utilities, pipe installation, equipment, estimating, productivity, and site safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGypsum Construction Handbook, 7th Edition, 2014\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides information about gypsum products, wall and ceiling systems, fire-resistant assemblies, installation methods, finishing, and construction details.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePlacing Reinforcing Bars: Recommended Practices, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers reinforcing-bar identification, supports, placement, splices, tolerances, detailing, handling, and field installation.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTechnical Digest No. 9 – Handling and Erection of Steel Joists and Joist Girders, 3rd Edition, 2008\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides guidance for receiving, storing, handling, placing, bridging, and erecting steel joists and joist girders.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eModern Masonry – Brick, Block, Stone, Clois E. Kicklighter, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eReviews masonry materials, mortar, tools, layout, brick, concrete block, stone, estimating, construction methods, and safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrinciples and Practices of Commercial Construction, 11th Edition, Cameron K. Andres and Ronald C. Smith\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides broad coverage of commercial construction materials, structural systems, building components, sequencing, methods, and field practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCode of Federal Regulations – 29 CFR Part 1926, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eContains federal construction-safety requirements involving jobsite operations, fall protection, excavation, scaffolding, equipment, and electrical safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCarpentry and Building Construction, 2016 Student Edition, John L. Feirer and Mark D. Feirer\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers carpentry tools, construction materials, layout, foundations, framing, floors, walls, roofs, interiors, and common building procedures.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eICC A117.1 Accessible and Usable Buildings and Facilities, 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides accessibility criteria for routes, entrances, rooms, fixtures, controls, communication elements, and building features.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRoofing Construction and Estimating, Daniel Atcheson\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eReviews roofing systems, materials, installation methods, measurements, quantities, flashing, drainage, estimating, and project planning.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eThe Contractor’s Guide to Quality Concrete Construction, 4th Edition, 2018\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eExplains concrete materials, preparation, placement, consolidation, finishing, curing, testing, quality control, and problem prevention.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGreen Building Fundamentals, Michael Montoya, 2nd Edition, 2011\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eIntroduces sustainable construction, energy efficiency, water conservation, material selection, building performance, and indoor environmental quality.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eInternational Building Code, 2021 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eContains commercial building requirements involving occupancy, construction types, fire protection, means of egress, accessibility, structural provisions, and building systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeveloping Your Stormwater Pollution Prevention Plan – A Guide for Construction Sites\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eExplains stormwater planning, erosion and sediment controls, pollution prevention, inspections, documentation, and construction-site responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eANSI\/EIMA 99-A-2017: Standard for Exterior Insulation and Finish Systems and EIFS with Drainage\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides requirements involving exterior insulation and finish systems, materials, installation, drainage, flashing, joints, and system performance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMechanical and Electrical Systems for Construction Managers, 4th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers mechanical, plumbing, fire-protection, electrical, lighting, communication, and building-control systems coordinated during commercial construction.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBegin by dividing the examination material into manageable study categories. Project management, safety, codes, accessibility, site work, concrete, masonry, structural systems, carpentry, roofing, environmental controls, exterior systems, and building-service systems can each be reviewed separately.\u003c\/p\u003e\n\u003cp\u003ePair course lessons with regular use of the applicable reference book. After reviewing a topic, locate the same information in the corresponding publication and examine how the chapter, index, code section, diagram, or table is organized.\u003c\/p\u003e\n\u003cp\u003eUse practice questions as both knowledge checks and reference-navigation exercises. Read the question, identify the main subject, select the likely publication, locate the supporting material, and then evaluate the answer choices.\u003c\/p\u003e\n\u003cp\u003eReview incorrect answers carefully. A missed question may indicate a technical knowledge gap, an incorrect book choice, misunderstood terminology, or an inefficient search method. Identifying the reason can help candidates focus future study more effectively.\u003c\/p\u003e\n\u003cp\u003eTimed practice helps candidates build a consistent testing routine. The goal is to recognize the subject, select the correct reference, locate the applicable material, and evaluate the available answers without spending excessive time in unrelated books.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina contractor candidates turn a broad commercial construction examination outline into an organized online study plan. Structured lessons provide a practical way to review the major subjects associated with the NASCLA Commercial General Building Contractor examination.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review helps students connect construction concepts with the references most likely to address them. Candidates can study concrete, masonry, structural steel, roofing, excavation, accessibility, safety, project management, and building systems in focused sections.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation encourages active learning. Students can work through questions, identify weak subjects, revisit difficult material, and practice locating supporting information within the examination library.\u003c\/p\u003e\n\u003cp\u003eReference-navigation guidance is especially valuable for an open-book examination. Candidates can practice identifying key terms, selecting the correct publication, and using indexes, chapter headings, code sections, definitions, diagrams, and technical tables.\u003c\/p\u003e\n\u003cp\u003eThe online format offers a flexible preparation structure for candidates balancing exam study with construction work, business responsibilities, and the North Carolina licensing process. Organized review makes it easier to maintain progress and return to subjects that need additional attention.\u003c\/p\u003e\n\u003cp\u003eContractor Exam Prep does not guarantee a passing examination result, licensing approval, or license issuance. The course provides organized study guidance, commercial trade review, practice-oriented preparation, reference-navigation support, and a confidence-building study structure.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFAQ Section\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat examination does this online course cover?\u003c\/h2\u003e\n\u003cp\u003eThe course supports preparation for the NASCLA Accredited Examination for Commercial General Building Contractors.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes North Carolina accept the NASCLA examination?\u003c\/h2\u003e\n\u003cp\u003eYes. The North Carolina Licensing Board for General Contractors accepts the NASCLA examination for the Building classification.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing NASCLA automatically provide a North Carolina license?\u003c\/h2\u003e\n\u003cp\u003eNo. Applicants must complete the North Carolina licensing process and satisfy the applicable qualifier, financial, classification, limitation, fee, and documentation requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the NASCLA examination open book?\u003c\/h2\u003e\n\u003cp\u003eYes. Candidates may bring permitted references that comply with current examination rules. The testing center does not provide the complete book library.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the reference books included with this course?\u003c\/h2\u003e\n\u003cp\u003eThe listed references are separate unless the selected package specifically states that books are included.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat North Carolina classification accepts NASCLA?\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors accepts the NASCLA Commercial General Building Contractor examination for the Building classification.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow does the course support open-book preparation?\u003c\/h2\u003e\n\u003cp\u003eThe course helps candidates connect commercial construction topics with the appropriate references and practice locating information through indexes, chapters, code sections, definitions, diagrams, and technical tables.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eShould I study directly from the listed books?\u003c\/h2\u003e\n\u003cp\u003eYes. Candidates should combine online course review with regular reference practice so the examination library becomes familiar before test day.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes North Carolina use license limitations?\u003c\/h2\u003e\n\u003cp\u003eYes. North Carolina general contractor licenses include financial limitations that affect the value of projects the contractor may undertake.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes completing the course guarantee a passing examination result?\u003c\/h2\u003e\n\u003cp\u003eNo. Examination results depend on the candidate’s preparation, construction knowledge, reference familiarity, time management, and performance on test day.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Online Self-Study Exam Prep","offer_id":45066531602485,"sku":null,"price":400.0,"currency_code":"USD","in_stock":true},{"title":"Add Instructor-Led Virtual Classes [+$300]","offer_id":45066531635253,"sku":null,"price":700.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/NASCLA-COMMERCIAL-GENERAL-BUILDING-COURSE-NC_a0dc41db-17e1-4d5d-96fb-93098f6d7ab5.jpg?v=1787553046"},{"product_id":"north-carolina-nascla-examination-for-commercial-general-building-contractors-complete-book-set","title":"North Carolina NASCLA Examination for Commercial General Building Contractors Complete Book Set","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina NASCLA Examination for Commercial General Building Contractors Complete Book Set\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina general contractor licensing process and the NASCLA Accredited Examination for Commercial General Building Contractors with a complete collection of business, project-management, code, safety, and commercial construction references.\u003c\/p\u003e\n\u003cp\u003eThis North Carolina NASCLA complete book set combines the North Carolina Contractors’ Guide to Business Law and Project Management for Commercial Contractors with the listed technical references associated with the NASCLA commercial general building examination. The collection supports organized preparation across contractor business practices, project administration, structural systems, jobsite safety, building codes, accessibility, site development, exterior systems, environmental responsibilities, and mechanical and electrical coordination.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina business guide is included for Business and Law preparation. It addresses the responsibilities involved in operating a contracting business, including licensing, business organization, financial management, estimating, contracts, insurance, employment practices, safety, liens, project administration, and compliance with state contractor requirements.\u003c\/p\u003e\n\u003cp\u003eThe remaining publications cover the technical knowledge associated with commercial general building construction. Candidates can review jobsite supervision, project management, structural concrete, reinforcing steel, precast erection, post-tensioning, steel decking, steel joists, wood trusses, excavation, gypsum systems, masonry, carpentry, roofing, accessibility, stormwater planning, exterior insulation systems, sustainable construction, federal safety requirements, and building-service systems.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina accepts the NASCLA Accredited Examination for Commercial General Building Contractors for the Building classification. Passing the NASCLA examination may satisfy the approved technical examination requirement, but it does not automatically issue a North Carolina general contractor license. Applicants must still complete the North Carolina application process and satisfy the Board’s licensing requirements.\u003c\/p\u003e\n\u003cp\u003eThe NASCLA examination uses an extensive open-book reference library. Effective preparation involves more than reading each publication from cover to cover. Candidates should understand which book applies to a particular subject and practice locating information through indexes, tables of contents, chapter headings, code sections, definitions, diagrams, and technical tables.\u003c\/p\u003e\n\u003cp\u003eStudying with the complete set allows candidates to divide the library into manageable construction categories and develop a repeatable reference-navigation process. Familiarity with the actual books can help candidates reduce unnecessary searching and approach the examination with a clearer study structure.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe NASCLA Accredited Examination for Commercial General Building Contractors is a standardized technical trade examination accepted by participating contractor licensing agencies. The North Carolina Licensing Board for General Contractors accepts the NASCLA examination for the Building classification.\u003c\/p\u003e\n\u003cp\u003eThe Building classification includes private, public, commercial, industrial, and residential buildings of all types, subject to the scope and limitations established by North Carolina law and the applicant’s approved license limitation.\u003c\/p\u003e\n\u003cp\u003eThe NASCLA examination measures knowledge used to plan, supervise, coordinate, and complete commercial building projects involving multiple construction trades. Its broad scope reflects the responsibilities of a general building contractor rather than the work of one specialty contractor.\u003c\/p\u003e\n\u003cp\u003eThe listed references address project management, jobsite operations, estimating, contracts, safety, concrete, reinforcing steel, structural metals, wood trusses, precast construction, post-tensioning, masonry, excavation, carpentry, roofing, accessibility, building codes, stormwater planning, exterior systems, and mechanical and electrical coordination.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina applicants may qualify the business through an individual who has passed an examination approved by the Board. This individual is commonly identified as the qualifier or qualifying party. The qualifying party’s examination establishes the technical and practical knowledge connected with the requested classification.\u003c\/p\u003e\n\u003cp\u003eA candidate who chooses the NASCLA examination generally completes the NASCLA application and examination process before applying the passing result to the North Carolina license application. The passing result can be transmitted through the NASCLA National Examination Database for review by the licensing agency.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina applications are submitted through the Board’s online licensing system. Applicants must provide the requested company, ownership, qualifying-party, financial, background, and classification information before the license can be approved.\u003c\/p\u003e\n\u003cp\u003eThe Board reviews the complete application rather than issuing a license solely from an examination score. Applicants must satisfy the requirements involving age, character, financial responsibility, fees, qualifying-party status, and any background review required by the Board.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe NASCLA Accredited Examination for Commercial General Building Contractors is an open-book examination. Candidates are responsible for obtaining and bringing the permitted reference materials to the testing location. The testing center does not provide the complete reference library.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing allows candidates to consult approved publications, but the size of the library makes preparation essential. The complete set contains thousands of pages distributed across textbooks, codes, standards, manuals, and specialty construction guides.\u003c\/p\u003e\n\u003cp\u003eCandidates should learn the purpose of each reference and practice selecting the correct book before searching for an answer. A practical method begins by identifying the primary subject of the question and then choosing the publication most likely to address it.\u003c\/p\u003e\n\u003cp\u003eStructural concrete questions may require ACI 318-19, while reinforcing-bar placement questions may involve Placing Reinforcing Bars. Concrete field practices involving placement, consolidation, curing, testing, and quality control may be addressed in The Contractor’s Guide to Quality Concrete Construction.\u003c\/p\u003e\n\u003cp\u003eSteel construction questions may involve the Steel Deck Institute Manual of Construction with Steel Deck or Technical Digest No. 9. Wood-truss handling and bracing questions may require the BCSI guide, while precast erection and post-tensioning questions rely on their respective specialty publications.\u003c\/p\u003e\n\u003cp\u003eAccessibility questions may require ICC A117.1, while broader commercial code questions may involve the International Building Code. Federal construction-safety questions may require 29 CFR Part 1926, and stormwater planning questions may involve Developing Your Stormwater Pollution Prevention Plan.\u003c\/p\u003e\n\u003cp\u003eOpen-book practice should include using indexes, chapter headings, definitions, code sections, technical illustrations, and tables. Candidates should also practice interpreting the surrounding material rather than relying only on one highlighted sentence or isolated term.\u003c\/p\u003e\n\u003cp\u003eAll books brought into the examination room must comply with current testing rules. Candidates should review the current NASCLA candidate bulletin and avoid unauthorized loose pages, removable notes, unapproved inserts, or other prohibited materials.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the appropriate North Carolina classification.\u003c\/strong\u003e Applicants pursuing broad general building authority should review the Building classification and confirm that it matches the work the company intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eChoose the appropriate license limitation.\u003c\/strong\u003e North Carolina licenses are issued with financial limitations that affect the size of projects the contractor may undertake.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the qualifying party.\u003c\/strong\u003e The applicant must designate an individual who has passed an examination approved for the requested classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrepare for the approved trade examination.\u003c\/strong\u003e Candidates using the NASCLA pathway should study the listed technical references and practice open-book navigation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApply for the NASCLA examination.\u003c\/strong\u003e Complete the current NASCLA application and testing-registration process.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePass the NASCLA Commercial General Building Contractor examination.\u003c\/strong\u003e A passing result may be used for the North Carolina Building classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTransmit the examination result.\u003c\/strong\u003e Send the official NASCLA transcript to the North Carolina Licensing Board for General Contractors through the National Examination Database.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the North Carolina license application.\u003c\/strong\u003e Submit the requested business, ownership, qualifying-party, classification, and contact information through the Board’s online application system.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide evidence of financial responsibility.\u003c\/strong\u003e Submit the financial information required for the requested license limitation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete required background disclosures.\u003c\/strong\u003e Provide accurate information and consent to any criminal background review required by the Board.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit fees and supporting documents.\u003c\/strong\u003e Complete the application with all materials requested by the licensing Board.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive license approval before contracting.\u003c\/strong\u003e The business must obtain the applicable North Carolina general contractor license before undertaking work that requires state licensure.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates general contractor licensing in the state. North Carolina law requires a general contractor license when the total value of a construction project is $40,000 or more.\u003c\/p\u003e\n\u003cp\u003eThe license is issued to the individual or business entity shown on the application. A qualifying party supports the license by passing an examination approved for the requested classification.\u003c\/p\u003e\n\u003cp\u003eApplicants must be at least 18 years old, demonstrate good moral character as determined by the Board, provide evidence of financial responsibility, submit the applicable fee, and consent to a criminal background check when required.\u003c\/p\u003e\n\u003cp\u003eThe Building classification covers private, public, commercial, industrial, and residential buildings of all types. Applicants should select the classification that accurately reflects the work the business intends to perform.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina also uses license limitations that affect the value of projects a contractor may undertake. The applicant’s financial information is reviewed in connection with the requested limitation.\u003c\/p\u003e\n\u003cp\u003eThe NASCLA Accredited Examination for Commercial General Building Contractors is accepted for the Building classification. NASCLA examination results may also be recognized for the Residential classification under the Board’s current acceptance policies.\u003c\/p\u003e\n\u003cp\u003ePassing NASCLA does not replace the North Carolina application. The applicant must still provide all required business information, qualifying-party records, financial documentation, fees, and disclosures.\u003c\/p\u003e\n\u003cp\u003eApplicants seeking to take a North Carolina-administered examination must first apply to the Board and receive an eligibility letter before scheduling with PSI. Candidates choosing NASCLA complete the NASCLA examination process separately and then apply the passing result to the North Carolina licensing process.\u003c\/p\u003e\n\u003cp\u003eThe qualifying party must remain connected with the licensed entity. Changes involving the qualifier, business ownership, legal name, or organization should be reported and handled through the procedures established by the Board.\u003c\/p\u003e\n\u003cp\u003ePassing an examination and purchasing this complete book set do not guarantee license approval. The North Carolina Licensing Board for General Contractors determines whether the applicant has satisfied all requirements for the requested classification and limitation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Contractors’ Guide to Business Law and Project Management, Commercial Contractors\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eSupports Business and Law preparation with material involving contractor licensing, business organization, finance, estimating, contracts, insurance, employment responsibilities, safety, liens, and project administration.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eConstruction Jobsite Management, 5th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers field supervision, jobsite planning, communication, documentation, productivity, quality control, safety, coordination, and daily construction operations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eConstruction Project Management, 5th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eReviews project organization, estimating, scheduling, contracts, cost control, risk management, communication, quality, and project closeout.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eACI 318-19: Building Code Requirements for Structural Concrete and Commentary\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides structural concrete requirements and commentary involving materials, reinforcement, design, durability, construction, and inspection.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBCSI: Guide to Good Practice for Handling, Installing, Restraining, and Bracing of Metal Plate Connected Wood Trusses, 2025\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAddresses recommended practices for receiving, handling, installing, restraining, and bracing metal plate connected wood trusses.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNASCLA Contractors’ Guide to Business, Law and Project Management, Basic 14th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eExplains contractor business practices, project management, finance, contracts, insurance, employment responsibilities, safety, and risk management.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eErectors’ Manual – Standards and Guidelines for the Erection of Precast Concrete Products, 2nd Edition, 1999\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers precast erection planning, handling, rigging, bracing, alignment, connections, field procedures, and safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTraining and Certification of Field Personnel for Unbonded Post-Tensioning – Level 1 Field Fundamentals, 3rd Edition, 2003\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eReviews field procedures for handling, installing, stressing, inspecting, and protecting unbonded post-tensioning systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSDI Manual of Construction with Steel Deck, 3rd Edition, 2016\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eExplains steel-deck receiving, storage, placement, fastening, construction loading, field modifications, and installation safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePipe and Excavation Contracting, Dave Roberts, 2011\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers excavation, grading, trenching, underground utilities, pipe installation, equipment, estimating, productivity, and site safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGypsum Construction Handbook, 7th Edition, 2014\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides information about gypsum products, wall and ceiling assemblies, fire-resistant systems, installation methods, finishing, and construction details.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePlacing Reinforcing Bars: Recommended Practices, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers reinforcing-bar identification, supports, placement, splices, tolerances, detailing, handling, and field installation.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTechnical Digest No. 9 – Handling and Erection of Steel Joists and Joist Girders, 3rd Edition, 2008\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides guidance for receiving, storing, handling, placing, bridging, and erecting steel joists and joist girders.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eModern Masonry – Brick, Block, Stone, Clois E. Kicklighter, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eReviews masonry materials, mortar, tools, layout, brick, concrete block, stone, estimating, construction methods, and safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrinciples and Practices of Commercial Construction, 11th Edition, Cameron K. Andres and Ronald C. Smith\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides broad coverage of commercial construction materials, structural systems, building components, sequencing, methods, and field practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCode of Federal Regulations – 29 CFR Part 1926, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eContains federal construction-safety requirements involving jobsite operations, fall protection, excavation, scaffolding, equipment, and electrical safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCarpentry and Building Construction, 2016 Student Edition, John L. Feirer and Mark D. Feirer\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers carpentry tools, construction materials, layout, foundations, framing, floors, walls, roofs, interiors, and common building procedures.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eICC A117.1 Accessible and Usable Buildings and Facilities, 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides accessibility criteria for routes, entrances, rooms, fixtures, controls, communication elements, and building features.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRoofing Construction and Estimating, Daniel Atcheson\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eReviews roofing systems, materials, installation methods, measurements, quantities, flashing, drainage, estimating, and project planning.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eThe Contractor’s Guide to Quality Concrete Construction, 4th Edition, 2018\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eExplains concrete materials, preparation, placement, consolidation, finishing, curing, testing, quality control, and problem prevention.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGreen Building Fundamentals, Michael Montoya, 2nd Edition, 2011\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eIntroduces sustainable construction, energy efficiency, water conservation, material selection, building performance, and indoor environmental quality.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eInternational Building Code, 2021 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eContains commercial building requirements involving occupancy, construction types, fire protection, means of egress, accessibility, structural provisions, and building systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeveloping Your Stormwater Pollution Prevention Plan – A Guide for Construction Sites\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eExplains stormwater planning, erosion and sediment controls, pollution prevention, inspections, documentation, and construction-site responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eANSI\/EIMA 99-A-2017: Standard for Exterior Insulation and Finish Systems and EIFS with Drainage\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides requirements involving exterior insulation and finish systems, materials, installation, drainage, flashing, joints, and system performance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMechanical and Electrical Systems for Construction Managers, 4th Edition, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers mechanical, plumbing, fire-protection, electrical, lighting, communication, and building-control systems coordinated during commercial construction.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBegin by separating the North Carolina Business and Law reference from the NASCLA technical library. This allows state contractor-business subjects to be reviewed independently while the technical books are organized by construction discipline.\u003c\/p\u003e\n\u003cp\u003eDivide the NASCLA references into project management, safety, codes, accessibility, site work, concrete, masonry, structural systems, carpentry, roofing, environmental controls, exterior systems, and mechanical and electrical coordination.\u003c\/p\u003e\n\u003cp\u003ePractice choosing the correct book before searching for an answer. Read a sample question, identify the central subject, select the most likely publication, and use the index or table of contents to locate the relevant section.\u003c\/p\u003e\n\u003cp\u003eTimed navigation exercises help candidates build a repeatable open-book method. The objective is to recognize the subject, select the appropriate reference, locate the supporting material, and evaluate the answer choices without spending excessive time in unrelated books.\u003c\/p\u003e\n\u003cp\u003eReview incorrect answers carefully. A missed question may reveal a technical knowledge gap, an incorrect reference choice, misunderstood terminology, or an inefficient search method. Identifying the cause helps candidates focus future study more effectively.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina contractor candidates turn a large business and technical reference library into an organized examination-preparation system. The complete set brings together the North Carolina business guide and the NASCLA commercial building references for coordinated study.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review becomes more manageable when the books are grouped by subject. Candidates can connect concrete, masonry, steel, roofing, excavation, accessibility, safety, project-management, and building-system questions with the publications most likely to contain the answers.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation encourages candidates to use the references actively. Students can work through questions, identify important terms, select the appropriate book, and practice locating code provisions, definitions, diagrams, tables, and technical requirements.\u003c\/p\u003e\n\u003cp\u003eReference-navigation practice is especially important for the open-book NASCLA examination. Familiarity with indexes, chapter headings, code sections, and technical tables can help candidates develop a clearer and more efficient examination routine.\u003c\/p\u003e\n\u003cp\u003eThe included North Carolina business guide also supports review of contractor licensing, financial responsibility, contracts, insurance, employment responsibilities, liens, safety, and project administration.\u003c\/p\u003e\n\u003cp\u003eContractor Exam Prep does not guarantee a passing examination result, licensing approval, or license issuance. The complete book set provides organized study materials, trade-focused references, navigation practice, and a confidence-building foundation for pursuing North Carolina contractor licensing goals.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFAQ Section\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in this complete book set?\u003c\/h2\u003e\n\u003cp\u003eThe package includes the North Carolina Contractors’ Guide to Business Law and Project Management for Commercial Contractors and all 24 listed NASCLA commercial building technical references.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes North Carolina accept the NASCLA examination?\u003c\/h2\u003e\n\u003cp\u003eYes. The North Carolina Licensing Board for General Contractors accepts the NASCLA Accredited Examination for Commercial General Building Contractors for the Building classification.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing NASCLA automatically issue a North Carolina license?\u003c\/h2\u003e\n\u003cp\u003eNo. Applicants must complete the North Carolina license application and satisfy the Board’s qualifying-party, financial, character, fee, and documentation requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhen is a North Carolina general contractor license required?\u003c\/h2\u003e\n\u003cp\u003eA North Carolina general contractor license is required when the total value of the construction project is $40,000 or more.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the NASCLA examination open book?\u003c\/h2\u003e\n\u003cp\u003eYes. Candidates may bring permitted references that comply with current examination rules. The testing center does not provide the complete book library.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the North Carolina Business and Law book included?\u003c\/h2\u003e\n\u003cp\u003eYes. The North Carolina Contractors’ Guide to Business Law and Project Management for Commercial Contractors is included.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre books provided at the examination center?\u003c\/h2\u003e\n\u003cp\u003eNo. Candidates are responsible for obtaining and bringing all permitted references to the testing location.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eShould I use the listed editions?\u003c\/h2\u003e\n\u003cp\u003eYes. Page numbers, code sections, technical requirements, tables, illustrations, and publication organization may differ between editions.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow should I study the complete set?\u003c\/h2\u003e\n\u003cp\u003eGroup the books by subject, learn which reference applies to each construction topic, and practice locating information through indexes, chapters, code sections, definitions, diagrams, and technical tables.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes purchasing the set guarantee license approval?\u003c\/h2\u003e\n\u003cp\u003eNo. The North Carolina Licensing Board for General Contractors determines whether an applicant has satisfied the requirements for the requested classification and license limitation.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Complete NASCLA Book Set","offer_id":45919409537077,"sku":null,"price":2204.0,"currency_code":"USD","in_stock":true},{"title":"Complete NASCLA Book Set + Highlighted \u0026 Tabbed [+$650]","offer_id":45919409569845,"sku":null,"price":2854.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/NASCLA-COMMERCIAL-GENERAL-BUILDING-BOOK-SET-NC.jpg?v=1787553096"},{"product_id":"north-carolina-corporation-or-llc-filing-registration-formation-setup","title":"North Carolina Corporation or LLC Filing Registration Formation Setup","description":"","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919380406325,"sku":null,"price":300.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/33-APPLICATION-BUSINESSSETUP_b67b18ae-4ca1-4039-a546-0a4c9dc52b2e.jpg?v=1787557426"},{"product_id":"the-1-package-all-inclusive-north-carolina-roofing-contractor-exam-licensing-business-setup-solution","title":"The 1 Package: All-Inclusive North Carolina Roofing Contractor Exam, Licensing \u0026 Business Setup Solution","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eThe 1 Package: All-Inclusive North Carolina Roofing Contractor Exam, Licensing \u0026amp; Business Setup Solution\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Roofing Contractor examination, organize the licensing process, and establish your roofing business with one comprehensive solution. The 1 Package combines highlighted and tabbed rental books, a North Carolina Roofing Contractor online exam prep course, live classes, Application Service, business formation, EIN filing, and contractor compliance guidance.\u003c\/p\u003e\n\u003cp\u003eThis all-inclusive package is designed for candidates who want support beyond a standard roofing exam book bundle. Roofing contractor preparation requires knowledge of steep-slope roofing, membrane roofing, metal-panel systems, spray polyurethane foam roofing, roof substrates, repairs, sheet metal, flashing, jobsite safety, building-code requirements, business law, licensing, liens, estimating, and project management.\u003c\/p\u003e\n\u003cp\u003eThe rental library includes the North Carolina Occupational Safety and Health Standards for the Construction Industry with the latest available amendments, the 2018 North Carolina Building Code, the Contractor’s Guide to Business, Law and Project Management—North Carolina General Contractors Edition, 10th Edition, the 2018 North Carolina Administrative Code and Policies, and three NRCA Roofing Manuals covering steep-slope, metal-panel, spray polyurethane foam, and membrane roofing systems.\u003c\/p\u003e\n\u003cp\u003eThe package also includes Roofing Construction and Estimating by Daniel Atcheson and Laws and Regulations Applicable to General Contracting in the State of North Carolina. These references support preparation involving roofing calculations, estimating, installation methods, licensing, liens, and contractor responsibilities, but they are not allowed in the examination room.\u003c\/p\u003e\n\u003cp\u003eAll rental trade references are highlighted and tabbed to support organized study. Tabs help candidates identify major sections and commonly tested subjects, while highlighting draws attention to important requirements, tables, details, procedures, and terminology. Candidates should still read complete sections and practice finding information under timed conditions.\u003c\/p\u003e\n\u003cp\u003eThe package includes 1 year of course access and live classes during the one-year access period. The online course organizes the examination material into manageable categories and supports technical review, practice questions, reference navigation, and consistent study. Live classes provide an additional opportunity to reinforce difficult roofing, code, safety, and business topics.\u003c\/p\u003e\n\u003cp\u003eApplication Service is included to help organize the information and supporting documentation needed for the North Carolina examination and contractor licensing process. Business Formation, EIN Filing with the IRS, and Contractor Compliance Guidance are also included to support the transition from exam candidate to properly organized roofing contracting business.\u003c\/p\u003e\n\u003cp\u003eThe package price is $2,655, plus a $700 refundable rental-book deposit, for a total initial payment of $3,355. The $700 deposit is refunded when the books are returned in similar condition within 1 year from the time they are received. Please allow 15 business days for the books to be highlighted, tabbed, and processed.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book(s):\u003c\/strong\u003e Nine highlighted and tabbed rental references listed below.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 1 year of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLive Classes:\u003c\/strong\u003e Included during the one-year course-access period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication Service:\u003c\/strong\u003e Included with this package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBusiness Formation (LLC or Corporation):\u003c\/strong\u003e Establish the customer’s business entity so it is legally structured and ready to operate as a roofing contractor in North Carolina.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEIN Filing with the IRS:\u003c\/strong\u003e Obtain the Employer Identification Number needed to open business bank accounts, manage taxes properly, hire employees, and operate the roofing business professionally.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractor Compliance Guidance:\u003c\/strong\u003e Assistance understanding compliance requirements relevant to North Carolina contractors so the business is positioned for long-term success.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Rental Period:\u003c\/strong\u003e 1 year from the time the books are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $2,655\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Rental-Book Deposit:\u003c\/strong\u003e $700\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Initial Payment:\u003c\/strong\u003e $3,355\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e The $700 deposit is refunded when the books are returned in similar condition within 1 year from the time they are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProcessing:\u003c\/strong\u003e Please allow 15 business days for the books to be highlighted, tabbed, and processed.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Roofing Contractor examination evaluates knowledge associated with installing, repairing, and maintaining roofing systems on residential, commercial, industrial, and institutional structures. Candidates should prepare for questions involving technical roofing systems, safety, building-code requirements, business operations, licensing, and liens.\u003c\/p\u003e\n\u003cp\u003eSteep-slope roofing is a major preparation area. Candidates should study asphalt shingles, wood shakes and shingles, clay and concrete tile, slate, roof decks, underlayment, flashing, valleys, hips, ridges, fasteners, penetrations, ventilation, material storage, and weather-related installation practices.\u003c\/p\u003e\n\u003cp\u003eRoof-substrate preparation may involve deck materials, sheathing, insulation, cover boards, vapor retarders, existing roof conditions, moisture, drainage, slope, attachment, compatibility, and preparation before the roofing system is installed.\u003c\/p\u003e\n\u003cp\u003eMembrane-roofing study should include built-up roofing, modified bitumen, thermoplastic and thermoset single-ply systems, attachment methods, insulation, surfacing, seams, flashing, penetrations, expansion joints, drainage, repairs, maintenance, and protection of completed work.\u003c\/p\u003e\n\u003cp\u003eMetal-panel preparation may include standing-seam and through-fastened systems, clips, fasteners, panel layout, seams, laps, sealants, thermal movement, flashing, trim, penetrations, underlayment, condensation control, and safe material handling.\u003c\/p\u003e\n\u003cp\u003eSpray polyurethane foam roofing preparation may address substrate conditions, surface preparation, foam application, thickness, protective coatings, weather limitations, drainage, flashing, repairs, maintenance, and protection of adjacent areas.\u003c\/p\u003e\n\u003cp\u003eRoof-repair questions may involve leak investigation, moisture damage, punctures, open seams, deteriorated materials, flashing failures, membrane defects, failed coatings, drainage problems, substrate conditions, and selection of compatible repair materials.\u003c\/p\u003e\n\u003cp\u003eSheet-metal and flashing study may include base flashing, counterflashing, valleys, edge metal, copings, gravel stops, gutters, downspouts, scuppers, penetrations, expansion joints, and roof-to-wall transitions.\u003c\/p\u003e\n\u003cp\u003eSafety preparation should include fall protection, warning-line systems, personal fall-arrest systems, ladders, scaffolds, roof openings, electrical hazards, material handling, hoisting, hot work, fire prevention, personal protective equipment, and employer responsibilities.\u003c\/p\u003e\n\u003cp\u003eBusiness and law preparation may include contracts, estimating, financial management, project scheduling, employment practices, insurance, safety programs, risk management, licensing requirements, liens, and contractor responsibilities.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Roofing Contractor examination is an open-book test. Candidates may use only the references identified as permitted for the examination, and every book must comply with current testing-center requirements.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Occupational Safety and Health Standards for the Construction Industry supports questions involving fall protection, ladders, scaffolds, electrical hazards, personal protective equipment, material handling, roof openings, fire prevention, and employer safety responsibilities.\u003c\/p\u003e\n\u003cp\u003eThe 2018 North Carolina Building Code supports questions involving roofing assemblies, weather protection, structural requirements, fire classifications, roof coverings, drainage, insulation, flashing, reroofing, and general building-code provisions.\u003c\/p\u003e\n\u003cp\u003eThe Contractor’s Guide to Business, Law and Project Management—North Carolina General Contractors Edition, 10th Edition supports questions involving contracts, estimating, financial management, project administration, employment practices, insurance, safety programs, and risk management.\u003c\/p\u003e\n\u003cp\u003eThe 2018 North Carolina Administrative Code and Policies supports questions involving permits, inspections, construction documents, approvals, code administration, enforcement, and the responsibilities of contractors and code officials.\u003c\/p\u003e\n\u003cp\u003eThe NRCA Roofing Manual: Steep Slope Roof Systems supports questions involving asphalt shingles, wood roofing, tile, slate, underlayments, roof decks, flashing, ventilation, details, and steep-slope installation methods.\u003c\/p\u003e\n\u003cp\u003eThe NRCA Roofing Manual: Metal Panel and SPF Roof Systems supports preparation involving metal panels, clips, fasteners, seams, thermal movement, flashing, spray polyurethane foam, coatings, repairs, and maintenance.\u003c\/p\u003e\n\u003cp\u003eThe NRCA Roofing Manual: Membrane Roofing Systems supports questions involving built-up, modified bitumen, and single-ply membrane roofing, including substrates, insulation, attachment, seams, flashing, drainage, repairs, and maintenance.\u003c\/p\u003e\n\u003cp\u003eRoofing Construction and Estimating and Laws and Regulations Applicable to General Contracting in the State of North Carolina are included for study but are not allowed in the examination room. Candidates should use these books throughout the one-year rental period to strengthen closed-book knowledge.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed format supports faster navigation, but candidates must still identify the correct publication and read the complete provision. Requirements may include exceptions, limitations, definitions, or related sections that affect the correct answer.\u003c\/p\u003e\n\u003cp\u003eAll references brought into the examination room must comply with current rules involving editions, binding, tabs, highlighting, markings, inserts, and loose materials.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eConfirm the Roofing specialty classification.\u003c\/strong\u003e Review the authorized scope and determine whether it matches the roofing work the applicant intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the appropriate license limitation.\u003c\/strong\u003e Choose the limited, intermediate, or unlimited limitation based on the intended value of individual projects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEstablish the applicant entity.\u003c\/strong\u003e Determine whether the applicant will operate as an individual, LLC, corporation, partnership, or another eligible entity.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesignate a qualifier.\u003c\/strong\u003e Identify the individual who will satisfy the Roofing examination requirement for the applicant.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eUse the included Application Service.\u003c\/strong\u003e Organize applicant, entity, ownership, qualifier, financial, and supporting information.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the licensing application.\u003c\/strong\u003e File the required materials through the North Carolina contractor licensing process.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide evidence of financial responsibility.\u003c\/strong\u003e Meet the financial requirement associated with the selected license limitation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the background-check requirement.\u003c\/strong\u003e Provide or authorize the criminal background information required for the application.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e Complete the application review process and obtain authorization before scheduling the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule and complete the examination.\u003c\/strong\u003e Follow all scheduling, identification, security, calculator, and reference-material instructions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete license issuance requirements.\u003c\/strong\u003e Passing the examination satisfies the testing component, but all remaining licensing requirements must be completed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eForm the business entity.\u003c\/strong\u003e Use the included Business Formation service to establish an LLC or corporation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eObtain the EIN.\u003c\/strong\u003e Complete the included EIN filing to establish the company’s federal tax identification number.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReview contractor compliance responsibilities.\u003c\/strong\u003e Use the included guidance to understand ongoing licensing, business, and operational requirements.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates the Roofing specialty classification. Applicants must satisfy the applicable entity, qualifier, financial, character, background, application, and examination requirements.\u003c\/p\u003e\n\u003cp\u003eA North Carolina general contractor license is required when a person or business bids on, contracts for, or undertakes a construction project valued at $40,000 or more, subject to the definitions and exceptions established by state law.\u003c\/p\u003e\n\u003cp\u003eThe Roofing specialty classification covers installation and repair of roofs and decks on residential, commercial, industrial, and institutional structures when the materials create a watertight and weather-resistant surface.\u003c\/p\u003e\n\u003cp\u003eThe classification includes roofing materials and components such as cedar, cement, clay tile, composition shingles, metal coverings, wood shakes, single-ply roofing, built-up roofing, protective and reflective coatings, sheet-metal valleys, flashings, gravel stops, gutters, downspouts, and bituminous waterproofing.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina general contractor licenses are issued with limited, intermediate, or unlimited limitations. Each limitation affects the permitted value of individual projects and carries separate financial qualification requirements.\u003c\/p\u003e\n\u003cp\u003eThe qualifier’s examination credential and the contractor license are separate. Passing the Roofing examination does not independently authorize a person or company to bid, contract, or perform regulated work. The license must be issued to the legal entity conducting the contracting activity.\u003c\/p\u003e\n\u003cp\u003eForming an LLC or corporation and obtaining an EIN do not replace contractor licensing. Business formation, federal tax registration, and professional licensing are separate parts of establishing a roofing company.\u003c\/p\u003e\n\u003cp\u003eLicensed roofing contractors must operate within the classification and limitation shown on the active license. They are also responsible for permits, inspections, employee supervision, workplace safety, contracts, code compliance, and maintaining accurate entity and qualifier information.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers fall protection, ladders, scaffolds, roof openings, electrical hazards, personal protective equipment, material handling, hot work, fire prevention, and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Building Code: Building Code, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers roof assemblies, weather protection, roof coverings, structural requirements, fire classifications, drainage, insulation, flashing, reroofing, and general code provisions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers business organization, contracts, estimating, financial management, project administration, employment practices, insurance, safety, and risk management.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Administrative Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference addresses permits, construction documents, inspections, approvals, enforcement, code administration, and contractor responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: NRCA Roofing Manual: Steep Slope Roof Systems\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers asphalt shingles, wood roofing, tile, slate, roof decks, underlayments, flashing, ventilation, details, and steep-slope installation practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: NRCA Roofing Manual: Metal Panel and SPF Roof Systems\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference addresses metal-panel systems, clips, fasteners, seams, thermal movement, flashing, spray polyurethane foam roofing, protective coatings, repairs, and maintenance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: NRCA Roofing Manual: Membrane Roofing Systems\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers built-up roofing, modified bitumen, and single-ply systems, including substrates, insulation, attachment, seams, flashing, drainage, maintenance, and repairs.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Roofing Construction and Estimating, Daniel Atcheson, 1995\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers roof geometry, measurements, quantities, materials, estimating, flashing, drainage, and installation practices. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Laws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers classifications, limitations, qualifiers, applications, licensing requirements, liens, enforcement, and contractor responsibilities. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for open-book questions involving roofing safety and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Building Code: Building Code, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for roofing assemblies, reroofing, weather protection, materials, drainage, and general building-code questions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for business, law, estimating, project management, insurance, and risk-control questions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Administrative Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for permits, inspections, approvals, administration, and code-enforcement questions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNRCA Roofing Manual: Steep Slope Roof Systems\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for technical questions involving steep-slope roofing materials, details, and installation.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNRCA Roofing Manual: Metal Panel and SPF Roof Systems\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for technical questions involving metal-panel and spray polyurethane foam roofing systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNRCA Roofing Manual: Membrane Roofing Systems\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for technical questions involving built-up, modified bitumen, and single-ply membrane systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBuild a study schedule around steep-slope roofing, roof substrates, membrane systems, metal panels, spray polyurethane foam, repairs, sheet metal, flashing, safety, business law, licensing, liens, and general building-code requirements.\u003c\/p\u003e\n\u003cp\u003eUse the seven exam-room references during timed lookup exercises. Read each question, identify the roofing system or business subject, select the correct publication, locate the applicable section, and review the full requirement before choosing an answer.\u003c\/p\u003e\n\u003cp\u003eGive additional attention to steep-slope roofing. Review roof-deck preparation, underlayment, fastening, flashing, valleys, penetrations, ventilation, and material-specific installation requirements.\u003c\/p\u003e\n\u003cp\u003eStudy Roofing Construction and Estimating separately to reinforce roof geometry, material quantities, coverage, waste, labor considerations, and estimating methods. Review the laws and regulations book for classifications, licensing, liens, qualifiers, limitations, and contractor responsibilities.\u003c\/p\u003e\n\u003cp\u003ePractice calculations involving roof area, slope, material quantities, coverage, waste, labor, and project costs. Identify the units and assumptions required before completing each calculation.\u003c\/p\u003e\n\u003cp\u003eUse the one-year rental and course-access period to rotate among online lessons, live classes, technical reading, practice questions, calculations, and open-book navigation exercises.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Roofing Contractor candidates combine exam preparation, application support, highlighted rental books, live instruction, and business setup in one organized package.\u003c\/p\u003e\n\u003cp\u003eOrganized study guidance separates roofing preparation into steep-slope, membrane, metal-panel, spray polyurethane foam, substrate, repair, flashing, safety, building-code, business, licensing, and lien categories.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review helps candidates understand how roof decks, insulation, attachment methods, drainage, flashing, roof coverings, repairs, and safety practices work together as part of a complete roofing system.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation helps candidates identify the subject of an examination question, select the correct codebook or roofing manual, locate the applicable information, and apply it to a practical situation.\u003c\/p\u003e\n\u003cp\u003eReference-navigation practice focuses on the seven books permitted in the examination room. The highlighted and tabbed format supports organized study and faster access to major subjects during timed exercises.\u003c\/p\u003e\n\u003cp\u003eThe online course and live classes also support closed-book preparation for roofing estimating and North Carolina contractor laws. Application Service helps organize licensing materials, while Business Formation and EIN Filing support the creation of a legally structured roofing business.\u003c\/p\u003e\n\u003cp\u003eContractor Compliance Guidance helps customers understand important operational responsibilities. No package can guarantee examination passage, application approval, license issuance, or business results. Outcomes depend on the customer’s qualifications, preparation, documentation, participation, and decisions made by the appropriate authorities.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in The 1 Package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes nine highlighted and tabbed rental books, 1 year of online course access, live classes, Application Service, Business Formation, EIN Filing with the IRS, and Contractor Compliance Guidance.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $2,655, plus a $700 refundable rental-book deposit, for a total initial payment of $3,355.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhen is the $700 deposit refunded?\u003c\/h2\u003e\n\u003cp\u003eThe deposit is refunded when the rental books are returned in similar condition within 1 year from the time they are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the rental period?\u003c\/h2\u003e\n\u003cp\u003eThe book rental period is 1 year from the time the books are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 1 year of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre live classes included?\u003c\/h2\u003e\n\u003cp\u003eYes. Live classes are included during the one-year course-access period.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre Application Service and business setup included?\u003c\/h2\u003e\n\u003cp\u003eYes. Application Service, Business Formation for an LLC or corporation, EIN Filing with the IRS, and Contractor Compliance Guidance are included.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does processing take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for the books to be highlighted, tabbed, and processed.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the books highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eYes. The included trade references are highlighted and tabbed to support organized study and navigation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich books are not allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eRoofing Construction and Estimating and Laws and Regulations Applicable to General Contracting in the State of North Carolina are included for study but are not allowed in the examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes business formation automatically create a contractor license?\u003c\/h2\u003e\n\u003cp\u003eNo. Business formation and contractor licensing are separate processes. The business must receive the required contractor license before performing regulated roofing work.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue the license?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing the examination satisfies the testing component, but the applicant must complete all financial, entity, qualifier, application, and licensing requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this package guarantee a passing score?\u003c\/h2\u003e\n\u003cp\u003eNo. Examination performance depends on the candidate’s qualifications, experience, preparation, reference-navigation skills, participation, and performance during the test.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919388106805,"sku":null,"price":3360.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-70-NC-ROOFING-ONEPACKAGE.jpg?v=1787552464"},{"product_id":"the-1-package-all-inclusive-north-carolina-residential-contractor-exam-licensing-business-setup-solution","title":"The 1 Package: All-Inclusive North Carolina Residential Contractor Exam, Licensing \u0026 Business Setup Solution","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eThe 1 Package: All-Inclusive North Carolina Residential Contractor Exam, Licensing \u0026amp; Business Setup Solution\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Residential Contractor examination, organize the contractor licensing process, and establish your construction business with one comprehensive solution. The 1 Package combines highlighted and tabbed rental books, a North Carolina Residential Contractor online exam prep course, live classes, Application Service, business formation, EIN filing, and contractor compliance guidance.\u003c\/p\u003e\n\u003cp\u003eThis all-inclusive package is designed for candidates who want support beyond a standard exam book bundle. Residential contractor preparation requires a broad understanding of building codes, construction methods, jobsite safety, business law, project management, carpentry, roofing, masonry, concrete, excavation, wood trusses, erosion control, and North Carolina licensing requirements.\u003c\/p\u003e\n\u003cp\u003eThe rental library includes the North Carolina Occupational Safety and Health Standards for the Construction Industry with the latest available amendments, the Contractor’s Guide to Business, Law and Project Management—North Carolina General Contractors Edition, 10th Edition, the 2018 North Carolina Residential Code, and the 2018 North Carolina Administrative Code and Policies. These references support open-book preparation for safety, residential code, code administration, business law, and project-management questions.\u003c\/p\u003e\n\u003cp\u003eThe package also includes nine closed-book study references covering carpentry, roofing, masonry, excavation, concrete, metal-plate-connected wood trusses, sedimentation control, and North Carolina general contractor laws and regulations. These books are included for study but are not allowed in the examination room.\u003c\/p\u003e\n\u003cp\u003eAll rental trade references are highlighted and tabbed to support organized study. Tabs help candidates identify major subjects, while highlighting draws attention to important passages, tables, procedures, and terminology. Candidates should still read complete sections and practice finding information under timed conditions.\u003c\/p\u003e\n\u003cp\u003eThe package includes 1 year of course access and live classes during the one-year access period. The online course organizes the examination material into manageable categories and supports trade-focused review, practice questions, code navigation, and consistent study. Live instruction provides an additional opportunity to reinforce difficult topics and develop a practical exam-day strategy.\u003c\/p\u003e\n\u003cp\u003eApplication Service is included to help organize the information and supporting documentation needed for the North Carolina contractor examination and licensing process. Business Formation, EIN Filing with the IRS, and Contractor Compliance Guidance are also included to support the transition from exam candidate to properly organized residential contracting business.\u003c\/p\u003e\n\u003cp\u003eThe package price is $2,705, plus a $650 refundable rental-book deposit, for a total initial payment of $3,355. The $650 deposit is refunded when the books are returned in similar condition within 1 year from the time they are received. Please allow 15 business days for processing.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book(s):\u003c\/strong\u003e Thirteen highlighted and tabbed rental references listed below.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 1 year of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLive Classes:\u003c\/strong\u003e Included during the one-year course-access period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication Service:\u003c\/strong\u003e Included with this package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBusiness Formation (LLC or Corporation):\u003c\/strong\u003e Establish the customer’s business entity so it is legally structured and ready to operate as a residential contractor in North Carolina.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEIN Filing with the IRS:\u003c\/strong\u003e Obtain the Employer Identification Number needed to open business bank accounts, manage taxes properly, hire employees, and operate the contracting business professionally.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractor Compliance Guidance:\u003c\/strong\u003e Assistance understanding compliance requirements relevant to North Carolina contractors so the business is positioned for long-term success.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Rental Period:\u003c\/strong\u003e 1 year from the time the books are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $2,705\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Rental-Book Deposit:\u003c\/strong\u003e $650\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Initial Payment:\u003c\/strong\u003e $3,355\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e The $650 deposit is refunded when the books are returned in similar condition within 1 year from the time they are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProcessing:\u003c\/strong\u003e Please allow 15 business days for processing.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Residential Contractor examination evaluates knowledge associated with residential construction, demolition, site work, safety, code compliance, business management, and contractor responsibilities. Candidates should prepare for technical construction questions as well as questions involving contracts, estimating, project administration, licensing, and business operations.\u003c\/p\u003e\n\u003cp\u003eResidential-code preparation may involve foundations, floor systems, wall framing, roof framing, exterior walls, weather protection, insulation, interior finishes, stairs, guards, decks, masonry, chimneys, fire-resistance provisions, and coordination with mechanical, plumbing, and electrical systems.\u003c\/p\u003e\n\u003cp\u003eCarpentry preparation should include layout, materials, floor framing, wall framing, roof framing, openings, headers, sheathing, fastening, stairs, exterior trim, interior finishes, and interpretation of plans and specifications. Candidates should understand how structural loads move through roofs, walls, floors, foundations, and soil.\u003c\/p\u003e\n\u003cp\u003eRoofing preparation may include roof shapes, slopes, framing, sheathing, underlayment, flashing, ventilation, drainage, roof coverings, material quantities, estimating, installation methods, and protection against water intrusion.\u003c\/p\u003e\n\u003cp\u003eMasonry study may include brick, concrete block, stone, mortar, grout, reinforcement, anchors, ties, flashing, weeps, control joints, expansion joints, veneer construction, foundations, chimneys, and fireplaces.\u003c\/p\u003e\n\u003cp\u003eConcrete preparation may address materials, forms, reinforcement, placement, consolidation, finishing, curing, joints, slabs, walls, footings, weather conditions, quality control, and common construction defects.\u003c\/p\u003e\n\u003cp\u003eExcavation and site-work preparation may include soils, trenching, grading, drainage, pipe installation, compaction, shoring, dewatering, underground utilities, excavation safety, and coordination with foundations, water systems, and wastewater systems.\u003c\/p\u003e\n\u003cp\u003eWood-truss preparation should include storage, handling, lifting, placement, temporary restraint, permanent bracing, bearing, connections, installation sequencing, and protection against damage or unauthorized field alterations.\u003c\/p\u003e\n\u003cp\u003eSafety preparation may include fall protection, ladders, scaffolds, excavations, electrical hazards, personal protective equipment, silica exposure, tools, cranes, material handling, housekeeping, and employer responsibilities.\u003c\/p\u003e\n\u003cp\u003eThe examination preparation materials also address erosion and sedimentation control. Candidates should understand the purpose of controlling sediment, protecting adjoining property and waterways, maintaining approved measures, inspecting disturbed areas, and complying with applicable North Carolina requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Residential Contractor examination is an open-book test for the references identified as permitted in the examination room. This package includes four exam-room references and nine additional closed-book study references.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Occupational Safety and Health Standards for the Construction Industry supports questions involving fall protection, scaffolds, ladders, excavations, tools, electrical hazards, material handling, personal protective equipment, and employer responsibilities.\u003c\/p\u003e\n\u003cp\u003eThe Contractor’s Guide to Business, Law and Project Management—North Carolina General Contractors Edition, 10th Edition supports questions involving contracts, estimating, financial management, project administration, employment practices, insurance, safety programs, and risk management.\u003c\/p\u003e\n\u003cp\u003eThe 2018 North Carolina Residential Code supports technical questions involving foundations, framing, roofing, exterior walls, stairs, decks, masonry, structural requirements, and other residential construction provisions.\u003c\/p\u003e\n\u003cp\u003eThe 2018 North Carolina Administrative Code and Policies supports questions involving permits, inspections, construction documents, approvals, code administration, enforcement, and the responsibilities of contractors and code officials.\u003c\/p\u003e\n\u003cp\u003eThe remaining references are not allowed in the examination room. They should be used during the one-year preparation period to build knowledge in carpentry, roofing, masonry, excavation, concrete, truss installation, sedimentation control, and contractor regulations.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing requires efficient reference navigation. Candidates should become familiar with tables of contents, indexes, definitions, chapter layouts, tables, figures, appendices, and cross-references in the permitted books.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed format supports faster navigation, but candidates must still identify the subject and select the correct publication. A framing question may require the Residential Code, while a permit question may require the Administrative Code and Policies.\u003c\/p\u003e\n\u003cp\u003eRead complete provisions before selecting an answer. Code and business requirements may include exceptions, definitions, limitations, or related sections that affect how a rule applies.\u003c\/p\u003e\n\u003cp\u003eAll books brought into the examination room must comply with current testing requirements governing editions, binding, tabs, highlighting, markings, inserts, and loose materials.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eConfirm the Residential Contractor classification.\u003c\/strong\u003e Review the authorized scope and determine whether it matches the residential construction work the applicant intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the license limitation.\u003c\/strong\u003e Choose the limited, intermediate, or unlimited limitation that fits the intended size and value of projects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEstablish the applicant entity.\u003c\/strong\u003e Determine whether the applicant will operate as an individual, LLC, corporation, partnership, or another eligible entity.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesignate a qualifier.\u003c\/strong\u003e Identify the person who will satisfy the examination requirement for the Residential Contractor classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eUse the included Application Service.\u003c\/strong\u003e Organize applicant, entity, ownership, qualifier, financial, and supporting information.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the licensing application.\u003c\/strong\u003e File the required materials through the North Carolina general contractor application process.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide evidence of financial responsibility.\u003c\/strong\u003e Meet the financial requirement associated with the selected license limitation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the background-check requirement.\u003c\/strong\u003e Provide or authorize the criminal background information required for the application.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e Complete the application review process and obtain authorization before scheduling the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule and complete the examination.\u003c\/strong\u003e Follow all scheduling, identification, security, calculator, and reference-material instructions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete license issuance requirements.\u003c\/strong\u003e Passing the examination satisfies the testing component, but all remaining licensing requirements must be completed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eForm the business entity.\u003c\/strong\u003e Use the included Business Formation service to establish an LLC or corporation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eObtain the EIN.\u003c\/strong\u003e Complete the included EIN filing to establish the company’s federal tax identification number.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReview contractor compliance responsibilities.\u003c\/strong\u003e Use the included guidance to understand ongoing licensing, business, and operational requirements.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates Residential Contractor licenses. Applicants must meet the applicable requirements involving age, character, financial responsibility, application documentation, background information, qualification, and examination eligibility.\u003c\/p\u003e\n\u003cp\u003eA North Carolina general contractor license is required when a person or business bids on, contracts for, or undertakes a construction project valued at $40,000 or more, subject to the definitions and exceptions established by state law.\u003c\/p\u003e\n\u003cp\u003eThe Residential Contractor classification covers qualifying construction and demolition work involving residential units governed by the residential building code adopted by the North Carolina Building Code Council.\u003c\/p\u003e\n\u003cp\u003eThe classification also includes related site work, driveways, sidewalks, and water and wastewater systems ancillary to those residential structures, along with authorized specialty work performed as part of the residential project.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina general contractor licenses are issued with limited, intermediate, or unlimited limitations. Each limitation affects the permitted value of individual projects and carries specific financial qualification requirements.\u003c\/p\u003e\n\u003cp\u003eThe qualifier’s examination credential and the contractor license serve different purposes. Passing the Residential Contractor examination does not independently authorize an individual or business to enter into regulated construction contracts. The license must be issued to the legal entity conducting the contracting activity.\u003c\/p\u003e\n\u003cp\u003eForming an LLC or corporation and obtaining an EIN do not replace contractor licensing. Business formation, tax registration, and professional licensing are separate parts of establishing a residential construction company.\u003c\/p\u003e\n\u003cp\u003eLicensed contractors must operate within the classification and limitation shown on the active license. They are also responsible for maintaining accurate entity and qualifier information, obtaining permits, arranging inspections, complying with jobsite safety requirements, and meeting contractual and professional obligations.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers fall protection, ladders, scaffolds, excavation, electrical hazards, tools, personal protective equipment, material handling, and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers business organization, contracts, estimating, financial management, project administration, employment practices, insurance, safety, and risk management.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Building Code: Residential Code, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference contains technical requirements for foundations, framing, roofing, exterior walls, stairs, decks, masonry, structural systems, and other qualifying residential construction.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Administrative Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference addresses permits, construction documents, inspections, approvals, code administration, enforcement, and contractor responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Carpentry and Building Construction, 2016\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers building materials, layout, floor framing, wall framing, roof framing, stairs, sheathing, fastening, exterior finishes, and interior construction. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Roofing Construction and Estimating, Daniel Atcheson, 1995\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers roof systems, materials, flashing, drainage, ventilation, installation methods, quantities, and estimating. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Modern Masonry - Brick, Block, Stone, Clois E. Kicklighter, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers brick, block, stone, mortar, grout, reinforcement, flashing, joints, veneer, fireplaces, and masonry construction practices. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Pipe and Excavation Contracting\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference addresses excavation, trenching, soils, grading, drainage, pipe installation, compaction, shoring, dewatering, and underground construction. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: The Contractor’s Guide to Quality Concrete Construction, 4th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers concrete materials, formwork, reinforcement, placement, consolidation, finishing, curing, joints, quality control, and common construction defects. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: BCSI: Guide to Good Practice for Handling, Installing, Restraining, and Bracing of Metal Plate Connected Wood Trusses, 2025\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers truss storage, handling, lifting, placement, temporary restraint, permanent bracing, connections, and safe installation. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Administrative Code, Title 15A, Chapter 4 Sedimentation Control, Including Latest Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference addresses administrative requirements for erosion and sedimentation control. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina General Statutes Chapter 113A, Article 4 Sedimentation Pollution Control Act of 1973\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference contains statutory provisions related to erosion and sedimentation control. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Laws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers classifications, limitations, qualifiers, applications, licensing requirements, conduct, liens, and contractor responsibilities. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for open-book questions involving construction safety and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for open-book questions involving contracts, estimating, financial management, project administration, and contractor business operations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Building Code: Residential Code, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for open-book technical questions involving residential construction and code compliance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Administrative Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for open-book questions involving permits, inspections, approvals, administration, and enforcement.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eDivide preparation into residential code, carpentry, roofing, masonry, concrete, excavation, wood trusses, safety, sedimentation control, business law, and contractor regulations.\u003c\/p\u003e\n\u003cp\u003eUse the four exam-room references during timed open-book exercises. Read each question, identify the subject, select the correct publication, locate the governing section, and review the complete requirement before choosing an answer.\u003c\/p\u003e\n\u003cp\u003eStudy the nine restricted references separately. Because they are not available during the examination, review their major concepts through online lessons, live classes, technical reading, practice questions, and repeated study.\u003c\/p\u003e\n\u003cp\u003ePractice interpreting plans, specifications, construction details, material quantities, and installation sequences. Residential contractor questions may require candidates to connect code requirements with practical building conditions.\u003c\/p\u003e\n\u003cp\u003eGive focused attention to structural load paths, framing systems, roofing assemblies, moisture protection, masonry, concrete, excavation safety, truss bracing, and sedimentation control.\u003c\/p\u003e\n\u003cp\u003eUse the one-year rental and course-access period to maintain a consistent study schedule. Rotate among course lessons, live instruction, technical reading, timed lookups, and targeted review of weaker topics.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Residential Contractor candidates combine exam preparation, application support, highlighted rental books, live instruction, and business setup in one organized package.\u003c\/p\u003e\n\u003cp\u003eOrganized study guidance separates residential construction into manageable categories, including foundations, framing, roofing, masonry, concrete, excavation, trusses, safety, erosion control, business law, and contractor regulations.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review connects code requirements with practical construction methods. Candidates can strengthen their understanding of how site work, structural systems, materials, safety, and project administration fit together during residential construction.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation helps candidates identify the subject of an examination question, choose the appropriate reference, locate the applicable provision, and interpret the information efficiently.\u003c\/p\u003e\n\u003cp\u003eReference-navigation practice focuses on the four books permitted in the examination room. The highlighted and tabbed format supports organized study and faster access to major subjects during timed exercises.\u003c\/p\u003e\n\u003cp\u003eThe online course and live classes support closed-book preparation for the carpentry, roofing, masonry, concrete, excavation, truss, erosion-control, and contractor-law references that cannot be taken into the examination room.\u003c\/p\u003e\n\u003cp\u003eApplication Service helps organize licensing materials. Business Formation and EIN Filing support the creation of a legally structured company, while Contractor Compliance Guidance helps the customer understand important operational responsibilities.\u003c\/p\u003e\n\u003cp\u003eNo package can guarantee examination passage, application approval, license issuance, or business results. Outcomes depend on the customer’s qualifications, preparation, documentation, participation, and decisions made by the appropriate authorities.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in The 1 Package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes thirteen highlighted and tabbed rental references, 1 year of online course access, live classes, Application Service, Business Formation, EIN Filing with the IRS, and Contractor Compliance Guidance.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $2,705, plus a $650 refundable rental-book deposit, for a total initial payment of $3,355.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhen is the $650 deposit refunded?\u003c\/h2\u003e\n\u003cp\u003eThe deposit is refunded when the rental books are returned in similar condition within 1 year from the time they are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the rental period?\u003c\/h2\u003e\n\u003cp\u003eThe book rental period is 1 year from the time the books are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 1 year of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre live classes included?\u003c\/h2\u003e\n\u003cp\u003eYes. Live classes are included during the one-year course-access period.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre Application Service and business setup included?\u003c\/h2\u003e\n\u003cp\u003eYes. Application Service, Business Formation for an LLC or corporation, EIN Filing with the IRS, and Contractor Compliance Guidance are included.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does processing take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for processing.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the books highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eYes. The included trade references are highlighted and tabbed to support organized study and reference navigation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich books are allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eThe safety standards, Contractor’s Guide to Business, Law and Project Management, 2018 Residential Code, and 2018 Administrative Code and Policies are included as exam-room references.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all thirteen books allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eNo. Nine books are included for closed-book preparation and are not allowed in the examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes business formation automatically create a contractor license?\u003c\/h2\u003e\n\u003cp\u003eNo. Business formation and contractor licensing are separate processes. The business must receive the required contractor license before performing regulated contracting work.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue the license?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing the examination satisfies the testing component, but the applicant must complete all financial, entity, qualifier, application, and licensing requirements.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919388139573,"sku":null,"price":3360.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-64-NC-RESIDENTIAL-ONEPACKAGE.jpg?v=1787552466"},{"product_id":"the-1-package-all-inclusive-north-carolina-metal-erection-contractor-exam-licensing-business-setup-solution","title":"The 1 Package: All-Inclusive North Carolina Metal Erection Contractor Exam, Licensing \u0026 Business Setup Solution","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eThe 1 Package: All-Inclusive North Carolina Metal Erection Contractor Exam, Licensing \u0026amp; Business Setup Solution\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Metal Erection Contractor examination, organize your contractor licensing application, and establish your business with one comprehensive solution. The 1 Package combines highlighted and tabbed rental books, an online trade course, live classes, Application Service, business formation, EIN filing, and contractor compliance guidance.\u003c\/p\u003e\n\u003cp\u003eThis all-inclusive package is designed for candidates who want more than a basic exam book bundle. Metal erection contractor preparation involves structural steel knowledge, safe erection procedures, high-strength bolted connections, welding, steel joists and girders, steel decking, reinforcing bars, metal roofing and cladding, fencing, North Carolina contractor regulations, and business management.\u003c\/p\u003e\n\u003cp\u003eThe rental library includes the North Carolina Occupational Safety and Health Standards for the Construction Industry with the latest available amendments and the Specification for Structural Joints Using ASTM A325 or A490 Bolts, 2004. These references support open-book preparation involving steel-erection safety, fall protection, structural stability, cranes, rigging, high-strength bolts, joint classifications, pretensioning, inspection, and connected materials.\u003c\/p\u003e\n\u003cp\u003eThe package also includes closed-book study references addressing profiled roofing and cladding, reinforcing-bar placement, steel joists and joist girders, steel-deck construction, welding, fences, retaining walls, North Carolina contractor laws, liens, business practices, and project management. These publications are included for preparation but are not allowed in the examination room.\u003c\/p\u003e\n\u003cp\u003eAll rental books are highlighted and tabbed to provide an organized study experience. Permanent tabs help candidates locate major subjects, while highlighting draws attention to important terminology, procedures, tables, and requirements. Candidates should still read complete sections and practice finding information under timed conditions.\u003c\/p\u003e\n\u003cp\u003eThe package includes 1 year of course access and live classes during the one-year access period. The course and live instruction provide structured trade review, practice-oriented preparation, and reference-navigation guidance. Application Service is also included to help organize the information and supporting documentation required during the North Carolina examination and licensing process.\u003c\/p\u003e\n\u003cp\u003eBusiness Formation, EIN Filing with the IRS, and Contractor Compliance Guidance are included to support the transition from exam candidate to organized contracting business. The package price is $2,455, plus a $400 refundable rental-book deposit, for a total initial payment of $2,855. The deposit is refunded when the books are returned in similar condition within 1 year from the date they are received. Please allow 15 business days for processing.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book(s):\u003c\/strong\u003e Ten highlighted and tabbed rental references listed below.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 1 year of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLive Classes:\u003c\/strong\u003e Included during the one-year course-access period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication Service:\u003c\/strong\u003e Included with this package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBusiness Formation (LLC or Corporation):\u003c\/strong\u003e Establish the customer’s business entity so it is legally structured and ready to operate as a metal erection contractor in North Carolina.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEIN Filing with the IRS:\u003c\/strong\u003e Obtain the Employer Identification Number needed to open business bank accounts, manage taxes properly, hire employees, and operate the contracting business professionally.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractor Compliance Guidance:\u003c\/strong\u003e Assistance understanding compliance requirements relevant to North Carolina contractors so the business is positioned for long-term success.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $2,455\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Rental-Book Deposit:\u003c\/strong\u003e $400\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Initial Payment:\u003c\/strong\u003e $2,855\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e The $400 deposit is refunded when the books are returned in similar condition within 1 year from the date they are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProcessing:\u003c\/strong\u003e Please allow 15 business days for processing.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Metal Erection Contractor examination is associated with the specialty contractor licensing process administered by the North Carolina Licensing Board for General Contractors. Candidates must complete the applicable application process and receive examination eligibility before scheduling the test.\u003c\/p\u003e\n\u003cp\u003eThe Metal Erection specialty classification covers field fabrication, erection, repair, and alteration of architectural and structural metal components. Work may involve structural shapes, plates, tubing, pipe, bars, steel joists, girders, decking, stairs, towers, rails, fences, signs, siding, canopies, and other metal products assembled by welding, bolting, or riveting.\u003c\/p\u003e\n\u003cp\u003eExamination preparation may cover steel-erection safety, general construction safety, steel joists and joist girders, steel decking, reinforcing steel, welding, structural bolting, metal roofing and cladding, metal fencing, North Carolina contractor regulations, liens, and business practices.\u003c\/p\u003e\n\u003cp\u003eSteel-joist and girder preparation should include storage, handling, lifting, placement, bearing, alignment, bridging, temporary stability, connections, erection sequencing, and field modifications. Safe sequencing is especially important because joists and girders may remain unstable until required connections and bridging are properly installed.\u003c\/p\u003e\n\u003cp\u003eSteel-deck study may include deck identification, storage, lifting, placement, alignment, attachment, side laps, openings, temporary loading, and coordination with supporting steel. Candidates should understand how approved fastening methods and installation procedures contribute to stability and worker safety.\u003c\/p\u003e\n\u003cp\u003eStructural-bolting preparation should address ASTM A325 and A490 bolt assemblies, connected materials, joint classifications, faying surfaces, washers, snug-tightened joints, pretensioned joints, slip-critical joints, installation procedures, and inspection methods.\u003c\/p\u003e\n\u003cp\u003eWelding preparation may include welding processes, equipment, electrodes, joint types, welding positions, symbols, cutting methods, base metals, inspection concepts, and safe work practices. Candidates should also study how welded connections interact with structural plans, erection sequencing, and jobsite requirements.\u003c\/p\u003e\n\u003cp\u003eAdditional technical preparation may involve reinforcing-bar placement, profiled metal roofing and cladding, fencing materials, post installation, gates, contractor laws, liens, estimating, contracts, financial practices, project management, and risk control.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Metal Erection Contractor examination is an open-book test. Candidates may use the references identified as permitted for the examination when those materials comply with current testing-center rules.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Occupational Safety and Health Standards for the Construction Industry, with the latest available amendments, is included as an exam-room reference. It supports preparation involving OSHA steel-erection requirements, fall protection, cranes, rigging, hoisting, joists, decking, welding and cutting, ladders, scaffolds, personal protective equipment, electrical hazards, and employer responsibilities.\u003c\/p\u003e\n\u003cp\u003eThe Specification for Structural Joints Using ASTM A325 or A490 Bolts, 2004, is also included as an exam-room reference. Candidates should become familiar with its organization, terminology, joint classifications, installation procedures, pretensioning requirements, inspection provisions, and requirements for connected materials.\u003c\/p\u003e\n\u003cp\u003eThe remaining books in this package are closed-book study references and are not allowed in the examination room. Candidates should use them during the one-year preparation period to learn the technical, legal, and business subjects that may appear on the exam.\u003c\/p\u003e\n\u003cp\u003eOpen-book preparation should focus on fast, accurate reference navigation. Candidates should review the table of contents, index, definitions, major headings, tables, notes, and cross-references in each permitted publication. Practice should include identifying the main subject of a question before opening a book.\u003c\/p\u003e\n\u003cp\u003eA question involving fall protection during structural steel erection should direct the candidate to the safety standards. A question involving bolt pretension or a slip-critical joint should direct the candidate to the structural-joints specification. Recognizing the correct reference is the first step toward finding the answer efficiently.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed format supports navigation, but marked text should always be read in context. Requirements may include definitions, conditions, limitations, exceptions, inspection criteria, or related procedures that affect the correct response.\u003c\/p\u003e\n\u003cp\u003eAll exam-room references must comply with current requirements governing editions, binding, tabs, highlighting, markings, inserts, loose pages, and book condition.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eConfirm the Metal Erection classification.\u003c\/strong\u003e Review the specialty classification and determine whether it matches the architectural and structural metal work the applicant intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the appropriate license limitation.\u003c\/strong\u003e Choose the limited, intermediate, or unlimited limitation that fits the intended project size.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEstablish the applicant entity.\u003c\/strong\u003e Determine whether the license applicant will operate as an individual, LLC, corporation, partnership, or another eligible entity.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesignate a qualifier.\u003c\/strong\u003e Identify the individual who will satisfy the examination requirement for the Metal Erection classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eUse the included Application Service.\u003c\/strong\u003e Organize the applicant, qualifier, entity, financial, and supporting information needed for submission.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the application.\u003c\/strong\u003e File the required licensing materials through the North Carolina contractor application process.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide financial documentation.\u003c\/strong\u003e Submit the financial information required for the selected license limitation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e Complete the application review process and obtain authorization before scheduling the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule and complete the examination.\u003c\/strong\u003e Follow all scheduling, identification, security, and reference-material instructions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete license issuance requirements.\u003c\/strong\u003e Passing the examination satisfies the testing requirement, but the full application must be approved before a license is issued.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eForm the business entity.\u003c\/strong\u003e Use the included Business Formation service to establish an LLC or corporation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eObtain the EIN.\u003c\/strong\u003e Complete the included EIN filing to establish the company’s federal tax identification number.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReview contractor compliance responsibilities.\u003c\/strong\u003e Use the included guidance to understand ongoing licensing, operational, and business requirements.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eNorth Carolina requires a general contractor license for construction projects valued at $40,000 or more, subject to the definitions and exceptions established by state law. The contractor who bids, contracts, or undertakes the regulated project must hold the appropriate active license.\u003c\/p\u003e\n\u003cp\u003eThe Metal Erection specialty classification should match the work performed by the licensed contractor. The contractor must also operate within the financial limitation shown on the license. North Carolina offers limited, intermediate, and unlimited license limitations.\u003c\/p\u003e\n\u003cp\u003eA limited license permits individual projects valued up to $750,000. An intermediate license permits individual projects valued up to $1,500,000. An unlimited license does not restrict the value of an individual project. Each limitation carries its own financial qualification requirements.\u003c\/p\u003e\n\u003cp\u003eThe qualifier’s examination credential and the contractor license serve different purposes. Passing the Metal Erection examination does not independently authorize an individual or company to bid, contract, or perform regulated work. The license must be issued to the legal entity that will conduct the contracting business.\u003c\/p\u003e\n\u003cp\u003eApplicants must provide the required entity, qualifier, financial, and supporting information. The North Carolina Licensing Board for General Contractors reviews the complete application before issuing a license.\u003c\/p\u003e\n\u003cp\u003eForming an LLC or corporation and obtaining an EIN do not replace contractor licensing. Business formation, federal tax registration, and contractor licensing are separate parts of establishing a metal erection business.\u003c\/p\u003e\n\u003cp\u003eLicensed contractors are responsible for operating within the approved classification and limitation, maintaining accurate entity and qualifier information, following permit and inspection requirements, complying with jobsite safety standards, and meeting contractual and professional obligations.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers steel erection, fall protection, cranes, rigging, material handling, welding and cutting, ladders, scaffolds, electrical hazards, personal protective equipment, and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Specification for Structural Joints Using ASTM A325 or A490 Bolts, 2004\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference addresses high-strength structural bolts, joint classifications, connected materials, faying surfaces, washers, installation, pretensioning, inspection, and structural-joint requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Profiled Sheet Roofing and Cladding - A Guide to Good Practice, 3rd Edition, 1999\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers handling, storage, layout, installation, fasteners, laps, detailing, weather protection, and good practices for profiled roofing and cladding. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Placing Reinforcing Bars\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers reinforcing-bar identification, fabrication, handling, supports, tying, spacing, placement, splices, and tolerances. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Technical Digest No. 9 – Handling and Erection of Steel Joists and Joist Girders\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference addresses storage, lifting, placement, bearing, bridging, temporary stability, connections, field modifications, and erection procedures. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Laws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers classifications, limitations, qualifiers, applications, liens, enforcement, and contractor responsibilities. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: SDI Manual of Construction with Steel Deck\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers steel-deck handling, storage, placement, alignment, attachment, side laps, openings, and temporary loading. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers business organization, contracts, estimating, financial management, project administration, employment practices, safety, and risk management. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Modern Welding, 2013\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers welding processes, equipment, electrodes, joints, positions, symbols, cutting methods, metals, inspection concepts, and welding safety. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Fences \u0026amp; Retaining Walls, Used\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed used rental reference covers fence materials, posts, rails, gates, layouts, foundations, installation methods, and related construction practices. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference is included for open-book steel-erection and general construction-safety questions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSpecification for Structural Joints Using ASTM A325 or A490 Bolts, 2004\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference is included for open-book questions involving high-strength bolted structural joints.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eDivide preparation into steel-erection safety, general safety, steel joists and girders, steel decking, reinforcing bars, welding, structural bolting, roofing and cladding, fencing, contractor regulations, liens, and business management.\u003c\/p\u003e\n\u003cp\u003eUse the two exam-room references during timed open-book exercises. Read a question, identify the central topic, select the correct book, locate the applicable provision, and review the complete section before answering.\u003c\/p\u003e\n\u003cp\u003eStudy the restricted references separately. Because they are not available in the testing room, review their major concepts repeatedly through course lessons, live classes, practice questions, and scheduled reading.\u003c\/p\u003e\n\u003cp\u003eGive additional attention to structural stability, erection sequencing, bridging, deck attachment, fall protection, rigging, welding practices, and high-strength bolted connections. These subjects combine trade knowledge with safety responsibilities.\u003c\/p\u003e\n\u003cp\u003eUse the one-year course-access period to complete the material in stages. Combine online lessons, live classes, technical reading, timed reference searches, and focused review of weaker topics.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Metal Erection Contractor candidates combine exam preparation, application support, highlighted rental books, live instruction, and business setup in one organized package.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review connects structural members, joists, girders, decking, reinforcing steel, welding, bolted joints, roofing systems, fencing, and safe erection procedures as parts of complete metal construction projects.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation helps candidates identify the subject of a question, select the appropriate reference, locate the relevant requirement, and apply the information to a practical situation.\u003c\/p\u003e\n\u003cp\u003eReference-navigation practice focuses on the safety standards and structural-joints specification permitted in the exam room. The highlighted and tabbed format supports organized study and faster access to major sections.\u003c\/p\u003e\n\u003cp\u003eThe online course and live classes support closed-book preparation for the technical, legal, and business references that candidates must study before test day. Application Service helps organize licensing materials, while Business Formation and EIN Filing support the creation of a legally structured business.\u003c\/p\u003e\n\u003cp\u003eContractor Compliance Guidance helps customers understand important operational responsibilities. No package can guarantee examination passage, application approval, license issuance, or business results. Outcomes depend on the customer’s qualifications, preparation, documentation, participation, and decisions by the appropriate authorities.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in The 1 Package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes ten highlighted and tabbed rental references, 1 year of course access, live classes, Application Service, Business Formation, EIN Filing with the IRS, and Contractor Compliance Guidance.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $2,455, plus a $400 refundable rental-book deposit, for a total initial payment of $2,855.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhen is the $400 deposit refunded?\u003c\/h2\u003e\n\u003cp\u003eThe deposit is refunded when the books are returned in similar condition within 1 year from the date they are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 1 year of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre live classes and Application Service included?\u003c\/h2\u003e\n\u003cp\u003eYes. Live classes during the one-year access period and Application Service are included.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the package include business formation and EIN filing?\u003c\/h2\u003e\n\u003cp\u003eYes. Business Formation for an LLC or corporation and EIN Filing with the IRS are included.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does processing take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for processing.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all rental books highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eYes. All included rental references are highlighted and tabbed for organized preparation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich books are allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Occupational Safety and Health Standards for the Construction Industry and the Specification for Structural Joints Using ASTM A325 or A490 Bolts, 2004, are included as exam-room references.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the other books allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eNo. The roofing, reinforcing-bar, joist, steel-deck, welding, fencing, contractor-law, and business references are included for study but are not allowed in the examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes forming a business automatically create a contractor license?\u003c\/h2\u003e\n\u003cp\u003eNo. Business formation and contractor licensing are separate processes. The business must receive the required contractor license before performing regulated contracting work.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue the license?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing satisfies the examination requirement, but the complete licensing application and all additional requirements must be approved before a license is issued.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919388172341,"sku":null,"price":2860.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-58-NC-METAL-ONEPACKAGE.jpg?v=1787552469"},{"product_id":"the-1-package-all-inclusive-north-carolina-masonry-construction-contractor-exam-licensing-business-setup-solution","title":"The 1 Package: All-Inclusive North Carolina Masonry Construction Contractor Exam, Licensing \u0026 Business Setup Solution","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eThe 1 Package: All-Inclusive North Carolina Masonry Construction Contractor Exam, Licensing \u0026amp; Business Setup Solution\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Masonry Construction Contractor examination, organize the licensing process, and establish your contracting business with one comprehensive solution. The 1 Package combines rental reference books, a masonry trade course, live classes, Application Service, business formation, EIN filing, and contractor compliance guidance.\u003c\/p\u003e\n\u003cp\u003eThis all-inclusive package is designed for candidates who want support beyond a basic exam book bundle. Masonry contractor preparation involves technical knowledge, jobsite safety, structural masonry requirements, building-code navigation, licensing administration, and business organization. The 1 Package brings these areas together in one structured path.\u003c\/p\u003e\n\u003cp\u003eThe rental library includes the North Carolina Occupational Safety and Health Standards for the Construction Industry with the latest amendments, the 2018 North Carolina Building Code, ACI 530\/530.1 Building Code Requirements and Specification for Masonry Structures with Companion Commentaries, and the 2018 North Carolina Administrative Code and Policies.\u003c\/p\u003e\n\u003cp\u003eThese references support preparation involving concrete masonry units, brick, structural masonry, mortar, grout, reinforcement, anchorage, flashing, movement joints, fire-resistant construction, building-code requirements, inspections, administrative procedures, and construction safety.\u003c\/p\u003e\n\u003cp\u003eThe package also includes 1 year of course access and live classes during the one-year access period. Candidates can use the online masonry trade course and live instruction to review major examination topics, practice open-book navigation, reinforce trade concepts, and maintain a consistent study schedule.\u003c\/p\u003e\n\u003cp\u003eApplication Service is included to help organize the information and documentation needed for the North Carolina general contractor examination and licensing process. Business Formation, EIN Filing with the IRS, and Contractor Compliance Guidance are also included to support the transition from exam candidate to properly organized masonry contracting business.\u003c\/p\u003e\n\u003cp\u003eThe package price is $1,895, plus a $250 refundable rental-book deposit, for a total initial payment of $2,145. The $250 deposit is refunded after the books are returned in similar condition within 1 year of rental. Please allow 15 business days for processing.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e North Carolina Occupational Safety and Health Standards for the Construction Industry, with latest amendments, rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e North Carolina Building Code: Building Code, 2018 Edition, rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e ACI 530\/530.1 – Building Code Requirements and Specification for Masonry Structures with Companion Commentaries, 2011\/2013, rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e North Carolina Administrative Code and Policies, 2018 Edition, rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 1 year of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLive Classes:\u003c\/strong\u003e Included during the one-year course-access period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication Service:\u003c\/strong\u003e Included with this package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBusiness Formation (LLC or Corporation):\u003c\/strong\u003e Establish the customer’s business entity so the business is legally structured and ready to operate as a masonry contractor in North Carolina.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEIN Filing with the IRS:\u003c\/strong\u003e Obtain the Employer Identification Number needed to open business bank accounts, manage taxes properly, hire employees, and operate the contracting business professionally.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractor Compliance Guidance:\u003c\/strong\u003e Assistance understanding compliance requirements relevant to North Carolina contractors so the business is positioned for long-term success.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $1,895\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Rental-Book Deposit:\u003c\/strong\u003e $250\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Initial Payment:\u003c\/strong\u003e $2,145\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e The $250 deposit is refunded after the books are returned in similar condition within 1 year of rental.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProcessing:\u003c\/strong\u003e Please allow 15 business days.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Masonry Construction Contractor examination is associated with the specialty contractor licensing process administered by the North Carolina Licensing Board for General Contractors. Applicants must complete the Board’s application process and receive examination eligibility before scheduling the required test.\u003c\/p\u003e\n\u003cp\u003eThe Masonry Construction specialty classification addresses work requiring specialized masonry skills and materials. The classification includes construction using brick, concrete block, structural masonry units, stone, tile, glass block, refractory materials, mortar, grout, reinforcement, and related masonry products.\u003c\/p\u003e\n\u003cp\u003eExamination preparation should cover concrete block construction, brick masonry, specialty masonry, mortar and grout, structural requirements, building-code provisions, construction safety, administrative procedures, contractor responsibilities, and North Carolina regulations affecting licensed work.\u003c\/p\u003e\n\u003cp\u003eConcrete masonry study may include unit dimensions, wall layouts, bonding patterns, reinforced and unreinforced construction, lintels, bond beams, anchors, ties, flashing, weeps, control joints, grout placement, reinforcement positioning, tolerances, and weather protection.\u003c\/p\u003e\n\u003cp\u003eBrick masonry preparation may include common and specialty bonds, veneer construction, cavity walls, anchors, flashing systems, drainage, shelf angles, expansion joints, lintels, mortar joints, material handling, installation practices, and protection of completed work.\u003c\/p\u003e\n\u003cp\u003eStructural masonry questions may require candidates to use ACI 530\/530.1 to locate requirements involving materials, design, reinforcement, anchorage, construction specifications, inspection, quality assurance, mortar, grout, workmanship, and permitted tolerances.\u003c\/p\u003e\n\u003cp\u003eSafety preparation may involve scaffolds, ladders, fall protection, personal protective equipment, material handling, silica exposure, power tools, electrical hazards, housekeeping, excavation conditions, lifting procedures, and employer responsibilities on construction sites.\u003c\/p\u003e\n\u003cp\u003eAdministrative and building-code questions may address permits, inspections, approvals, special inspections, fire-resistance-rated assemblies, structural provisions, material standards, code enforcement, contractor duties, and the relationship between the North Carolina Building Code and referenced masonry standards.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Masonry Construction Contractor examination is an open-book test. Candidates may use the approved reference materials assigned to the examination when the books comply with the current testing-center rules.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing still requires organized preparation. Candidates should not expect to read unfamiliar chapters from the beginning while taking the examination. A more effective approach is to understand the trade topic, identify the correct reference, locate the applicable section, and confirm the answer efficiently.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Occupational Safety and Health Standards for the Construction Industry should be used for questions involving workplace hazards, scaffolding, ladders, fall protection, personal protective equipment, silica, material handling, tools, electrical safety, excavation, and employer responsibilities.\u003c\/p\u003e\n\u003cp\u003eThe 2018 North Carolina Building Code supports questions involving structural requirements, masonry assemblies, fire protection, life safety, inspections, special inspections, materials, building elements, and general code compliance.\u003c\/p\u003e\n\u003cp\u003eACI 530\/530.1 is the primary structural masonry reference in the package. Candidates should become familiar with the organization of its code requirements, specifications, commentary, tables, definitions, material provisions, reinforcement rules, anchorage requirements, quality-assurance procedures, and construction tolerances.\u003c\/p\u003e\n\u003cp\u003eThe 2018 North Carolina Administrative Code and Policies supports questions involving permits, inspections, approvals, enforcement, responsibilities, interpretations, and statewide construction-code procedures.\u003c\/p\u003e\n\u003cp\u003eBefore the examination, review the table of contents, index, chapter layout, definitions, appendices, and major tables in every reference. Practice matching common masonry subjects to the correct book. A scaffold question belongs in the safety standards, while a reinforced masonry wall question may require ACI 530\/530.1.\u003c\/p\u003e\n\u003cp\u003eAll books brought into the examination room must meet current rules governing binding, tabs, highlighting, notes, inserts, loose pages, and book condition. Candidates should review the applicable examination instructions before preparing their references.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eConfirm the Masonry Construction classification.\u003c\/strong\u003e Review the specialty classification and determine whether it matches the masonry work the applicant intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the appropriate license limitation.\u003c\/strong\u003e North Carolina general contractor licenses are issued with limitations that affect the permitted value of individual projects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEstablish the applicant entity.\u003c\/strong\u003e Determine whether the applicant will operate as an individual, LLC, corporation, partnership, or another eligible legal entity.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesignate a qualifier.\u003c\/strong\u003e The qualifier is the individual who satisfies the examination requirement for the classification requested by the applicant.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eUse the included Application Service.\u003c\/strong\u003e Organize the applicant, qualifier, entity, financial, and supporting information needed for submission.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the license application.\u003c\/strong\u003e File the required application through the North Carolina Licensing Board for General Contractors.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide financial documentation.\u003c\/strong\u003e Submit the financial information required for the selected license limitation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e After the application is reviewed, the approved qualifier receives the information needed to schedule the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination.\u003c\/strong\u003e Follow all scheduling, identification, security, and reference-material instructions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete license issuance requirements.\u003c\/strong\u003e Passing the examination satisfies the testing component, but all remaining Board requirements must be completed before a license is issued.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eForm the business entity.\u003c\/strong\u003e Use the included Business Formation service to establish an LLC or corporation for the contracting business.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eObtain the EIN.\u003c\/strong\u003e Complete the included EIN filing to establish the business’s federal tax identification number.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReview contractor compliance responsibilities.\u003c\/strong\u003e Use the included guidance to understand ongoing licensing, business, and operational requirements.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates contractor classifications, specialty classifications, license limitations, applications, qualifiers, financial responsibility, renewals, and professional conduct.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina requires a general contractor license when a contractor bids on, contracts for, or undertakes a construction project valued at $40,000 or more, subject to the definitions and exceptions established by state law.\u003c\/p\u003e\n\u003cp\u003eApplicants must be at least 18 years old, demonstrate good moral character, provide evidence of financial responsibility, submit the applicable application fee, and complete any background-check requirement imposed by the Board.\u003c\/p\u003e\n\u003cp\u003eThe applicant must identify a qualifier who has passed an examination approved for the requested classification. The qualifier may be associated with an individual applicant or an eligible business entity, but the examination credential and contractor license serve different functions.\u003c\/p\u003e\n\u003cp\u003eThe license is issued to the approved legal entity. A qualifier’s examination credential does not independently authorize an unlicensed company to bid, contract, or perform regulated general contracting work.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina licenses are issued with limited, intermediate, or unlimited project limitations. Each limitation carries financial qualification requirements. Applicants should select the limitation that fits their intended work and provide the documentation required by the Board.\u003c\/p\u003e\n\u003cp\u003eForming an LLC or corporation and obtaining an EIN do not replace contractor licensing. Business formation, tax registration, and professional licensing are separate steps in establishing a masonry contracting company.\u003c\/p\u003e\n\u003cp\u003eLicensed contractors must operate within the approved classification and limitation, maintain required records, follow permit and inspection requirements, keep entity information current, and comply with applicable laws and Board regulations.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental reference addresses jobsite safety requirements, including fall protection, scaffolds, ladders, personal protective equipment, silica exposure, electrical hazards, tools, material handling, excavation, housekeeping, and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Building Code: Building Code, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental code covers structural systems, masonry construction, building materials, fire protection, life safety, inspections, special inspections, occupancy provisions, and general building-code compliance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: ACI 530\/530.1 – Building Code Requirements and Specification for Masonry Structures with Companion Commentaries, 2011\/2013\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental technical reference contains engineering requirements and construction specifications for masonry structures, including materials, reinforcement, anchorage, design, mortar, grout, workmanship, inspection, quality assurance, and tolerances.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Administrative Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental reference supports preparation involving permits, inspections, approvals, construction-code administration, enforcement procedures, responsibilities, and statewide regulatory policies.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports open-book questions involving construction safety requirements and jobsite responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Building Code: Building Code, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports general building-code, structural, fire-protection, inspection, and masonry-related questions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eACI 530\/530.1 – Building Code Requirements and Specification for Masonry Structures with Companion Commentaries, 2011\/2013\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports structural masonry, materials, reinforcement, anchorage, mortar, grout, quality assurance, and construction-specification questions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Administrative Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports questions involving permits, inspections, approvals, administration, and code-enforcement procedures.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBegin preparation by dividing the material into safety, concrete block, brick, specialty masonry, mortar and grout, structural masonry, administrative procedures, and general building-code requirements.\u003c\/p\u003e\n\u003cp\u003eFor concrete block and brick, review dimensions, coursing, bonding, wall types, ties, anchors, lintels, flashing, weeps, reinforcement, control joints, expansion joints, bearing, workmanship, and weather protection.\u003c\/p\u003e\n\u003cp\u003eStudy mortar and grout as separate materials. Review types, proportions, mixing, placement, consolidation, joint finishing, lift requirements, reinforcement interaction, curing, temperature limitations, and protection during construction.\u003c\/p\u003e\n\u003cp\u003eUse timed navigation exercises throughout the one-year course period. Read a practice question, identify the subject, choose the correct book, locate the provision, and review the surrounding requirements before answering.\u003c\/p\u003e\n\u003cp\u003eUse the live classes to reinforce masonry concepts, review calculation or interpretation questions, and develop familiarity with the reference library. Combine class participation with individual reading, trade-course lessons, practice questions, and repeated open-book searches.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Masonry Construction Contractor candidates combine exam preparation, application support, rental references, live instruction, and business setup in one organized package.\u003c\/p\u003e\n\u003cp\u003eOrganized study guidance divides the examination into manageable areas, including block, brick, structural masonry, mortar, grout, specialty materials, safety, building-code requirements, and administrative procedures.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review helps candidates understand how masonry units, mortar, grout, reinforcement, anchors, flashing, joints, structural requirements, and safety practices work together on real projects.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation emphasizes the skills needed for an open-book examination. Candidates learn to identify the correct reference, locate a provision, review related requirements, and confirm answers efficiently.\u003c\/p\u003e\n\u003cp\u003eReference-navigation practice builds familiarity with the Building Code, ACI 530\/530.1, safety standards, and Administrative Code and Policies. The trade course and live classes provide a structured way to reinforce these skills during the one-year access period.\u003c\/p\u003e\n\u003cp\u003eApplication Service supports the licensing process by helping organize application information and supporting documents. Business Formation and EIN Filing support the creation of a legally structured business, while Contractor Compliance Guidance helps the customer understand important operational responsibilities.\u003c\/p\u003e\n\u003cp\u003eNo package can guarantee examination passage, application approval, license issuance, or business results. Outcomes depend on the customer’s qualifications, preparation, documentation, participation, and decisions made by the appropriate authorities.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in The 1 Package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes four rental references, 1 year of course access, live classes, Application Service, Business Formation, EIN Filing with the IRS, and Contractor Compliance Guidance.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $1,895, plus a $250 refundable rental-book deposit, for a total initial payment of $2,145.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhen is the $250 deposit refunded?\u003c\/h2\u003e\n\u003cp\u003eThe deposit is refunded after the books are returned in similar condition within 1 year of rental.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 1 year of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre live classes included?\u003c\/h2\u003e\n\u003cp\u003eYes. Live classes are included during the one-year course-access period.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs Application Service included?\u003c\/h2\u003e\n\u003cp\u003eYes. Application Service is included to help organize the North Carolina examination and licensing application materials.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the package include business formation?\u003c\/h2\u003e\n\u003cp\u003eYes. Business Formation for an LLC or corporation is included.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs EIN filing included?\u003c\/h2\u003e\n\u003cp\u003eYes. EIN Filing with the IRS is included to help establish the company’s federal tax identification number.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does processing take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for processing.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the Masonry Construction examination open book?\u003c\/h2\u003e\n\u003cp\u003eYes. Candidates may use approved references during the examination when the materials comply with current testing-center requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the rental books intended for the exam room?\u003c\/h2\u003e\n\u003cp\u003eThe listed safety standards, Building Code, ACI 530\/530.1, and Administrative Code and Policies support preparation for the open-book examination and must comply with current examination rules.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue a license?\u003c\/h2\u003e\n\u003cp\u003eNo. The applicant must satisfy the Board’s application, financial, entity, qualifier, and licensing requirements before a license is issued.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes forming an LLC or corporation create a contractor license?\u003c\/h2\u003e\n\u003cp\u003eNo. Business formation and contractor licensing are separate processes. The business must receive the required contractor license before performing regulated work.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919388205109,"sku":null,"price":2150.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-52-NC-MASONRY-ONEPACKAGE.jpg?v=1787552470"},{"product_id":"the-1-package-all-inclusive-north-carolina-building-contractor-exam-licensing-business-setup-solution","title":"The 1 Package: All-Inclusive North Carolina Building Contractor Exam, Licensing \u0026 Business Setup Solution","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eThe 1 Package: All-Inclusive North Carolina Building Contractor Exam, Licensing \u0026amp; Business Setup Solution\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Building Contractor examination, licensing process, and business launch with an all-inclusive package built around the major steps required to move from exam preparation toward operating a professionally structured contracting business.\u003c\/p\u003e\n\u003cp\u003eThe 1 Package combines professionally highlighted and tabbed rental books, exam-room-approved references, supplemental study books, live instruction, a self-study trade course, Application Service, business-formation support, EIN filing, and contractor compliance guidance.\u003c\/p\u003e\n\u003cp\u003eThis package is designed for candidates who want more than a collection of books or a stand-alone online course. It brings examination preparation, reference navigation, licensing assistance, and foundational business setup services together in one coordinated solution.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Building Contractor classification covers a broad range of commercial, industrial, institutional, and residential construction and demolition work. Candidates may need to understand building-code requirements, structural concrete, masonry, accessibility, construction safety, contractor business law, project management, code administration, sports-field construction, carpentry, roofing, excavation, erosion control, steel systems, and related construction methods.\u003c\/p\u003e\n\u003cp\u003eThe package includes eight references identified for use in the examination room and twelve supplemental books intended for study outside the exam. Every included rental book is professionally highlighted and tabbed.\u003c\/p\u003e\n\u003cp\u003eSelected definitions, code requirements, tables, formulas, diagrams, administrative procedures, safety standards, and business concepts are highlighted to support focused review. Permanently attached tabs identify major chapters, standards, sections, and frequently reviewed subjects.\u003c\/p\u003e\n\u003cp\u003eThe live and self-study trade course helps candidates organize the extensive reference library into manageable study areas. Candidates can combine instructor-led sessions with independent lessons, technical reading, code-navigation exercises, calculation practice, and timed open-book drills.\u003c\/p\u003e\n\u003cp\u003eApplication Service is included to support organization of the North Carolina contractor licensing application process. Business Formation, EIN Filing with the IRS, and Contractor Compliance Guidance are also included to help customers establish a formal business structure and prepare for professional contracting operations.\u003c\/p\u003e\n\u003cp\u003eThe package includes 1 year of course access and a one-year rental period for the complete physical book set. The package price is $3,205, plus a $1,250 refundable rental-book deposit, for a total of $4,455 due at purchase.\u003c\/p\u003e\n\u003cp\u003eThe $1,250 deposit is refundable when the complete rental-book set is returned in similar condition within one year of the rental period. Books should be protected from additional writing, torn pages, moisture, missing materials, loose inserts, or unauthorized alterations.\u003c\/p\u003e\n\u003cp\u003ePlease allow an additional 15 business days for highlighted and tabbed trade book package orders. Candidates should consider this preparation time when selecting an examination date and organizing their study schedule.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book(s):\u003c\/strong\u003e The complete professionally highlighted and tabbed North Carolina Building Contractor rental library listed below.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 1 year of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLive Trade Classes:\u003c\/strong\u003e Instructor-led preparation covering major North Carolina Building Contractor examination subjects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelf-Study Trade Course:\u003c\/strong\u003e Flexible online preparation for technical review, reference navigation, and practice-oriented study.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication Service:\u003c\/strong\u003e Included with this package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBusiness Formation:\u003c\/strong\u003e LLC or corporation formation support to help establish the customer’s business entity and create a formal structure for operating a North Carolina building contracting business.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEIN Filing with the IRS:\u003c\/strong\u003e Assistance obtaining an Employer Identification Number so the business can open business bank accounts, manage taxes properly, hire employees, and operate professionally.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractor Compliance Guidance:\u003c\/strong\u003e Assistance understanding contractor compliance responsibilities so the business can build a stronger foundation for long-term operations.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eExam-Room Reference Rentals:\u003c\/strong\u003e Eight highlighted and tabbed books identified for use during the North Carolina Building Contractor examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSupplemental Study Book Rentals:\u003c\/strong\u003e Twelve highlighted and tabbed technical and regulatory references used to strengthen preparation outside the exam room.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProfessional Highlighting:\u003c\/strong\u003e Selected code provisions, definitions, tables, formulas, diagrams, safety rules, and business concepts are marked for focused review.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePermanently Attached Tabs:\u003c\/strong\u003e Major chapters, standards, sections, and commonly reviewed subjects are identified for efficient navigation.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $3,205\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eRefundable Book Deposit:\u003c\/strong\u003e $1,250\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eTotal Due at Purchase:\u003c\/strong\u003e $4,455\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eDeposit Terms:\u003c\/strong\u003e The $1,250 deposit is refundable when the complete rental-book set is returned in similar condition within one year of the rental period.\u003c\/p\u003e\n\u003cp style=\"margin-bottom: 0;\"\u003e\u003cstrong\u003ePlease allow an additional 15 business days for highlighted and tabbed trade book package orders.\u003c\/strong\u003e\u003c\/p\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Building Contractor examination evaluates knowledge across building construction, building-code compliance, structural systems, accessibility, workplace safety, contractor business practices, code administration, and project management.\u003c\/p\u003e\n\u003cp\u003eBuilding-code preparation may include occupancy classifications, construction types, allowable building height and area, fire-resistance ratings, fire walls, fire barriers, fire-protection systems, means of egress, exterior walls, roof assemblies, structural provisions, special inspections, and safeguards during construction.\u003c\/p\u003e\n\u003cp\u003eMany code questions require candidates to use several related provisions. A question involving allowable building size may require review of occupancy, construction type, sprinkler conditions, frontage provisions, mixed-use requirements, and table notes.\u003c\/p\u003e\n\u003cp\u003eStructural concrete preparation may include materials, reinforcement, concrete cover, development length, splices, slabs, beams, columns, walls, foundations, durability, strength, inspections, and construction requirements.\u003c\/p\u003e\n\u003cp\u003eMasonry preparation may include masonry units, mortar, grout, reinforcement, anchors, ties, walls, columns, bearing, quality assurance, construction tolerances, inspections, and structural requirements.\u003c\/p\u003e\n\u003cp\u003eAccessibility preparation may involve accessible routes, entrances, doors, maneuvering clearances, ramps, stairs, elevators, toilet rooms, bathing facilities, parking, seating, reach ranges, operable parts, signage, and communication features.\u003c\/p\u003e\n\u003cp\u003eConstruction-safety preparation may cover personal protective equipment, fall protection, ladders, scaffolds, excavation, cranes, material handling, electrical hazards, tools, fire prevention, housekeeping, and employer responsibilities.\u003c\/p\u003e\n\u003cp\u003eBusiness and project-management preparation may address licensing, business organization, accounting, financial statements, contracts, estimating, bidding, scheduling, insurance, employment practices, safety programs, liens, documentation, and risk management.\u003c\/p\u003e\n\u003cp\u003eCode-administration preparation may include permits, plan review, inspections, certificates of occupancy, alternate materials, violations, stop-work orders, enforcement procedures, and the responsibilities of contractors, design professionals, and building officials.\u003c\/p\u003e\n\u003cp\u003eSports-field preparation may include site evaluation, grading, drainage, irrigation, soil preparation, natural turf, synthetic surfaces, field layout, construction, renovation, and maintenance.\u003c\/p\u003e\n\u003cp\u003eThe supplemental study books expand preparation into carpentry, roofing, excavation, concrete mixtures, post-tensioning, modern masonry methods, utility safety, sedimentation control, contractor regulations, steel joist erection, and steel-deck construction.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Building Contractor examination is open book. Candidates may use authorized references that comply with current testing-center requirements.\u003c\/p\u003e\n\u003cp\u003eThe eight exam-room references included in this package are professionally highlighted and tabbed. Candidates should learn which book applies to each subject and practice navigating every reference before the examination.\u003c\/p\u003e\n\u003cp\u003eUse the North Carolina Building Code for occupancy classifications, construction types, allowable height and area, fire protection, means of egress, exterior walls, roof assemblies, structural provisions, and safeguards during construction.\u003c\/p\u003e\n\u003cp\u003eUse ACI 318 for structural concrete questions and ACI 530\/530.1 for masonry questions. Use ICC A117.1 for accessibility requirements and the North Carolina Administration Code and Policies for permits, inspections, enforcement, and administrative procedures.\u003c\/p\u003e\n\u003cp\u003eUse the North Carolina Occupational Safety and Health Standards for workplace-safety questions. Use the contractor business guide for licensing, accounting, contracts, estimating, project management, insurance, liens, and contractor responsibilities.\u003c\/p\u003e\n\u003cp\u003eUse the sports-fields reference for athletic-facility planning, site preparation, grading, drainage, irrigation, turf systems, construction, renovation, and maintenance.\u003c\/p\u003e\n\u003cp\u003eHighlighted passages should always be read in context. A correct answer may depend on a definition, exception, table note, diagram, commentary provision, or cross-reference located near the highlighted material.\u003c\/p\u003e\n\u003cp\u003eThe twelve supplemental books are included for study but are not identified as references allowed into the examination room. Final exam simulations should be completed using only the eight exam-room-approved books.\u003c\/p\u003e\n\u003cp\u003eCandidates should review current examination rules concerning tabs, highlighting, underlining, handwritten notes, loose papers, inserted materials, and binding before taking references to the testing center.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eReview the Building Contractor classification.\u003c\/strong\u003e Confirm that the classification matches the construction and demolition work the business plans to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the appropriate license limitation.\u003c\/strong\u003e Choose the North Carolina monetary limitation that fits the value of projects the business intends to undertake.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the qualifier.\u003c\/strong\u003e Select the individual who will satisfy the examination requirement for the applicant business.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrepare the application.\u003c\/strong\u003e Use the included Application Service to organize applicant, ownership, business, financial, and qualifier information.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the required licensing materials.\u003c\/strong\u003e Complete the applicable process for the selected classification and limitation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e Follow the authorization and registration instructions provided after application review.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBegin the self-study course.\u003c\/strong\u003e Organize preparation around building code, structural concrete, masonry, accessibility, safety, administration, business, and sports-field subjects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eAttend live classes.\u003c\/strong\u003e Use instructor-led sessions to reinforce examination topics and reference-navigation skills.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStudy the supplemental references.\u003c\/strong\u003e Build broader understanding of carpentry, roofing, excavation, concrete, masonry, steel construction, and erosion control.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete timed open-book drills.\u003c\/strong\u003e Practice with only the approved exam-room references during final simulations.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule and take the examination.\u003c\/strong\u003e Follow current candidate and testing-center requirements.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete business formation and EIN filing.\u003c\/strong\u003e Establish the selected business entity and obtain the federal Employer Identification Number.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the licensing process.\u003c\/strong\u003e Satisfy the applicable financial, qualifier, organizational, classification, and limitation requirements.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReturn the rental books.\u003c\/strong\u003e Return the complete set in similar condition within one year to qualify for the refundable deposit.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates the Building Contractor classification. The classification covers commercial, industrial, institutional, and residential building construction and demolition.\u003c\/p\u003e\n\u003cp\u003eThe scope also includes associated sitework, parking decks, grading, paving, sidewalks, gutters, storm drainage, retaining walls, accessory structures, recreational facilities, athletic fields, running tracks, bleachers, and seating.\u003c\/p\u003e\n\u003cp\u003eThe applicant business must hold a classification that covers the work it plans to perform and a monetary limitation appropriate for the value of the projects it intends to undertake.\u003c\/p\u003e\n\u003cp\u003eThe applicant must identify a qualifier who satisfies the examination requirement. The business must also provide the financial, organizational, ownership, and application information required for the selected licensing pathway.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina general contractor licenses are issued with limited, intermediate, or unlimited monetary limitations. Each limitation has financial qualification requirements and controls the value of projects the contractor may undertake.\u003c\/p\u003e\n\u003cp\u003ePassing the examination does not automatically issue a contractor license. The applicant must complete the full licensing process and satisfy all applicable business, financial, qualifier, organizational, classification, and limitation requirements.\u003c\/p\u003e\n\u003cp\u003eBusiness formation and EIN filing do not replace contractor licensing. The customer must still complete all licensing requirements before performing work that requires a North Carolina general contractor license.\u003c\/p\u003e\n\u003cp\u003eA contractor license does not replace project-specific permits, inspections, engineering services, architectural services, environmental approvals, accessibility obligations, erosion-control requirements, or workplace-safety responsibilities.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Sports Fields: Design, Construction and Maintenance, 2nd Edition, 2010\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA technical reference covering athletic-field planning, grading, drainage, irrigation, soil preparation, turf systems, construction, renovation, and maintenance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA construction-safety reference covering personal protective equipment, fall protection, ladders, scaffolds, excavation, cranes, electrical hazards, material handling, and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contractor reference covering licensing, accounting, contracts, estimating, bidding, scheduling, insurance, employment, liens, and project administration.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Building Code: Building Code, 2018\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe primary building-code reference covering occupancy, construction types, height and area, fire protection, means of egress, structural requirements, exterior walls, roofing, and construction safeguards.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: ACI 530\/530.1-13, Building Code Requirements and Specification for Masonry Structures and Companion Commentaries\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA masonry reference covering materials, reinforcement, design, construction, inspections, quality assurance, specifications, and commentary.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: ACI 318-14, Building Code Requirements for Structural Concrete and Commentary\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA structural concrete reference covering reinforcement, slabs, beams, columns, walls, foundations, durability, strength, development, splices, inspections, and construction.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Administration Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAn administrative reference covering permits, plan review, inspections, certificates of occupancy, enforcement, alternate materials, violations, and code procedures.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: ICC A117.1-2017, Standard for Accessible and Usable Buildings and Facilities\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAn accessibility standard covering routes, entrances, doors, ramps, elevators, toilet rooms, parking, seating, reach ranges, clearances, and communication features.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cp\u003eThe eight references listed above are identified as exam-room-approved books for the North Carolina Building Contractor examination. Each book is professionally highlighted and tabbed for study and open-book navigation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAdditional Study Books Not Allowed into the Exam\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Technical Digest No. 9 – Handling and Erection of Steel Joists and Joist Girders\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers delivery, storage, handling, bridging, erection, stability, sequencing, connections, and safety for steel joists and joist girders.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Carpentry and Building Construction, 2016\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers foundations, framing, floors, walls, roofs, stairs, doors, windows, finishes, tools, plans, and general building methods.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Design and Control of Concrete Mixtures, 17th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers concrete materials, proportioning, strength, durability, placement, consolidation, curing, testing, performance, and quality control.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Pipe and Excavation Contracting\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers excavation, trenching, pipe installation, dewatering, bedding, backfill, compaction, equipment, estimating, safety, and project execution.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Roofing Construction and Estimating, Daniel Atcheson, 1995\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers roofing systems, materials, installation, flashing, ventilation, repairs, measurements, labor, estimating, and project planning.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Training and Certification of Field Personnel for Unbonded Post-Tensioning - Level 1 Field Fundamentals\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers post-tensioning components, tendon installation, stressing, safety, inspection, handling, repairs, and quality control.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Modern Masonry: Brick, Block, Stone, Clois E. Kicklighter, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers masonry tools, materials, mortar, brick, concrete block, stone, layout, bonding, reinforcement, walls, and field techniques.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Excavation Safety Guidelines, 2022 or Later\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers utility-location procedures, markings, tolerance zones, safe digging, damage prevention, emergency response, and excavator responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Administrative Code, Title 15A, Chapter 4, Sedimentation Control, Including Latest Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers land-disturbing activities, erosion-control plans, stabilization, inspections, enforcement, and sedimentation-control responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina General Statutes Chapter 113A, Article 4, Sedimentation Pollution Control Act of 1973\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAddresses erosion and sedimentation-control requirements, planning responsibilities, enforcement authority, and pollution prevention.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Laws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers licensing statutes, Board rules, classifications, limitations, qualifier responsibilities, applications, renewals, and disciplinary provisions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: SDI Manual of Construction with Steel Deck\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers steel-deck products, handling, storage, erection, attachment, openings, accessories, tolerances, construction practices, and safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBegin preparation by separating the exam-room references from the supplemental study books. Use the complete library to build technical understanding, then complete final timed drills using only the approved examination books.\u003c\/p\u003e\n\u003cp\u003eStudy the North Carolina Building Code by practicing occupancy, construction type, allowable height and area, fire resistance, means of egress, exterior walls, roofing, structural provisions, and safeguards during construction.\u003c\/p\u003e\n\u003cp\u003eUse ACI 318 and ACI 530\/530.1 for structural preparation. Practice identifying which standard controls the question before beginning a lookup.\u003c\/p\u003e\n\u003cp\u003eUse ICC A117.1 for accessibility review and work directly with diagrams and dimensions involving routes, doors, ramps, parking, toilet rooms, seating, reach ranges, and maneuvering clearances.\u003c\/p\u003e\n\u003cp\u003eUse the supplemental books for practical review of carpentry, roofing, excavation, concrete mixtures, masonry installation, post-tensioning, steel joists, steel deck, utility safety, and sedimentation control.\u003c\/p\u003e\n\u003cp\u003eCombine live classes with self-study lessons, technical reading, calculations, mixed-reference exercises, and review of missed questions. Repeat difficult searches until book selection and navigation become more efficient.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Building Contractor candidates organize exam preparation, application support, and business setup into one structured package.\u003c\/p\u003e\n\u003cp\u003eThe live and self-study trade course connects building-code requirements with structural concrete, masonry, accessibility, safety, sports-field construction, project management, code administration, and contractor business responsibilities.\u003c\/p\u003e\n\u003cp\u003eProfessional highlighting helps selected provisions, tables, formulas, diagrams, and business concepts stand out. Permanent tabs provide visible navigation points for major chapters and frequently reviewed subjects.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation encourages candidates to study course lessons, answer questions, locate supporting provisions, review missed concepts, and repeat difficult reference searches.\u003c\/p\u003e\n\u003cp\u003eApplication Service supports organization of the contractor licensing paperwork. Business Formation and EIN Filing help establish the customer’s business structure, while Contractor Compliance Guidance supports a clearer understanding of ongoing professional responsibilities.\u003c\/p\u003e\n\u003cp\u003eNo package can guarantee a passing score, contractor license, business approval, project permit, or financial outcome. Results depend on the candidate’s preparation, construction experience, financial qualifications, application completion, reference-navigation ability, and examination performance.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFAQ Section\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in The 1 Package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes eight exam-room-approved books, twelve supplemental study books, professional highlighting and tabbing, live classes, a self-study course, 1 year of course access, Application Service, Business Formation, EIN Filing, and Contractor Compliance Guidance.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is the total amount due at purchase?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $3,205, and the refundable book deposit is $1,250. The total due at purchase is $4,455.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the $1,250 deposit refundable?\u003c\/h2\u003e\n\u003cp\u003eYes. The deposit is refundable when the complete rental-book set is returned in similar condition within one year of the rental period.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 1 year of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre live classes included?\u003c\/h2\u003e\n\u003cp\u003eYes. Live trade classes are included with the self-study course.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs Application Service included?\u003c\/h2\u003e\n\u003cp\u003eYes. Application Service is included to support organization of the North Carolina contractor licensing application process.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the package include business formation?\u003c\/h2\u003e\n\u003cp\u003eYes. LLC or corporation formation support is included to help establish the customer’s business entity.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs EIN filing included?\u003c\/h2\u003e\n\u003cp\u003eYes. Assistance filing for an Employer Identification Number with the IRS is included.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all books highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eYes. The exam-room references and supplemental study books are professionally highlighted and tabbed.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all books allowed into the exam room?\u003c\/h2\u003e\n\u003cp\u003eNo. Only the eight references listed in the Exam Room Approved Books section are identified for use during the examination. The remaining books are included for study.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does book preparation take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow an additional 15 business days for highlighted and tabbed trade book package orders.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this package guarantee a passing score or license?\u003c\/h2\u003e\n\u003cp\u003eNo. Examination, licensing, and business outcomes depend on the customer’s preparation, qualifications, documentation, reference-navigation ability, compliance, and performance throughout the process.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919388237877,"sku":null,"price":4460.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-46-NC-BUILDING-ONEPACKAGE.jpg?v=1787552471"},{"product_id":"the-1-package-all-inclusive-north-carolina-unlimited-electrical-contractor-exam-licensing-business-setup-solution","title":"The 1 Package: All-Inclusive North Carolina Unlimited Electrical Contractor Exam, Licensing \u0026 Business Setup Solution","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eThe 1 Package: All-Inclusive North Carolina Unlimited Electrical Contractor Exam, Licensing \u0026amp; Business Setup Solution\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Unlimited Electrical Contractor examination, organize the licensing process, and establish the business structure needed to operate professionally with an all-inclusive package built for experienced electrical contractors.\u003c\/p\u003e\n\u003cp\u003eThe 1 Package combines highlighted and tabbed rental reference books, the North Carolina Electrical Contractor online exam prep course, live classes, Application Service, business formation, Employer Identification Number filing, and contractor compliance guidance. It is designed to support candidates from exam preparation through the practical steps involved in establishing a properly structured electrical contracting business.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Unlimited classification is the state’s broadest regular electrical contractor license. It permits a properly licensed business to perform electrical contracting projects without a project-value limitation. License holders must still comply with applicable electrical codes, permits, inspections, workplace safety requirements, business laws, financial responsibility standards, and the rules of the North Carolina State Board of Examiners of Electrical Contractors.\u003c\/p\u003e\n\u003cp\u003eThis package includes highlighted and tabbed rental copies of the National Electrical Code, NEC, 2020 Edition, and NFPA 72, National Fire Alarm and Signaling Code, 2019 Edition. These technical references support preparation involving services, feeders, branch circuits, motors, transformers, generators, grounding, bonding, raceways, conductor sizing, overcurrent protection, emergency systems, fire alarms, calculations, inspection, testing, and electrical plans.\u003c\/p\u003e\n\u003cp\u003eThe package also includes highlighted and tabbed rental copies of Electrical Contractors Licensing Law, the Board’s Rules for the Implementation of the Electrical Contractors Licensing Law, and the NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition. These books support preparation involving contractor licensing, qualified-individual responsibilities, contracts, estimating, bidding, accounting, financial management, employment practices, safety, insurance, recordkeeping, and project administration.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Electrical Contractor trade online exam prep course provides structured review of technical, calculation, licensing, plan-reading, and business subjects. Live classes add guided instruction for important Code concepts, electrical calculations, reference navigation, examination topics, and licensing responsibilities.\u003c\/p\u003e\n\u003cp\u003eThe package includes \u003cstrong\u003e1 year of course access\u003c\/strong\u003e and a one-year rental period for the books. The rental period begins when the books are received. Candidates can use the same highlighted and tabbed references throughout preparation so that article locations, chapter layouts, tables, definitions, exceptions, and cross-references become familiar before test day.\u003c\/p\u003e\n\u003cp\u003eApplication Service is included to help organize the information and supporting material needed for the North Carolina electrical contractor application process. Business Formation is included to establish an LLC or corporation for the electrical contracting business. EIN Filing with the IRS is included to obtain the business’s federal Employer Identification Number. Contractor Compliance Guidance is also included to help the customer understand ongoing business and contractor obligations.\u003c\/p\u003e\n\u003cp\u003ePlease allow 15 business days for the rental books to be highlighted and tabbed before shipment. The package price is $1,955, plus a $400 refundable rental-book deposit, for a total of $2,355. The $400 deposit is refundable when the books are returned in similar condition within one year from the date they are received.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e National Electrical Code, NEC, 2020 Edition, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e NFPA 72 - National Fire Alarm and Signaling Code, 2019 Edition, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e Electrical Contractors Licensing Law, General Statutes Chapter 87, Article 4, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e The Board’s Rules for the Implementation of the Electrical Contractors Licensing Law, Title 21, North Carolina Administrative Code, Chapter 18B, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eOnline Course:\u003c\/strong\u003e North Carolina Electrical Contractor trade online exam prep course.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLive Classes:\u003c\/strong\u003e Guided live exam-preparation classes are included.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 1 year of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Rental Period:\u003c\/strong\u003e One year from the date the books are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication Service:\u003c\/strong\u003e Included with this package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBusiness Formation — LLC or Corporation:\u003c\/strong\u003e Establish the customer’s business entity so the company is legally structured and prepared to operate as an electrical contractor in North Carolina.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEIN Filing with the IRS:\u003c\/strong\u003e Obtain the business’s Employer Identification Number so the company can open business bank accounts, manage taxes properly, hire employees, and operate the electrical contracting business professionally.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractor Compliance Guidance:\u003c\/strong\u003e Assistance understanding compliance responsibilities that apply to North Carolina electrical contractors so the business is positioned for organized, long-term operation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Preparation:\u003c\/strong\u003e Please allow 15 business days for the rental books to be highlighted and tabbed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $1,955.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Book Deposit:\u003c\/strong\u003e $400.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Due:\u003c\/strong\u003e $2,355.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e The $400 deposit is refundable when the rental books are returned in similar condition within one year from the date they are received.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Unlimited Electrical Contractor examination contains 100 multiple-choice questions. Candidates have a maximum of six hours to complete the examination, and a minimum score of 70 percent is required to pass.\u003c\/p\u003e\n\u003cp\u003eThe examination is administered after the North Carolina State Board of Examiners of Electrical Contractors approves the applicant. Approved candidates receive examination authorization and scheduling instructions for the testing provider.\u003c\/p\u003e\n\u003cp\u003eThe Unlimited examination evaluates the technical, supervisory, calculation, plan-reading, licensing, and business knowledge needed to direct electrical contracting projects without a project-value limitation.\u003c\/p\u003e\n\u003cp\u003eService and feeder preparation may include residential and commercial load calculations, service conductor sizing, service equipment, disconnecting means, neutral loads, parallel conductors, grounding electrode conductors, feeder demand factors, transformer secondaries, voltage drop, and conductor protection.\u003c\/p\u003e\n\u003cp\u003eBranch-circuit preparation should include conductor ampacity, continuous loads, receptacle loads, lighting loads, appliance circuits, multiwire branch circuits, conductor identification, voltage limitations, overcurrent protection, and requirements for specific occupancies and equipment.\u003c\/p\u003e\n\u003cp\u003eMotor preparation may involve full-load current, branch-circuit conductor sizing, feeder sizing, overload protection, short-circuit and ground-fault protection, controllers, disconnects, duty ratings, multimotor installations, and use of NEC motor tables.\u003c\/p\u003e\n\u003cp\u003eTransformer preparation may include primary and secondary conductor sizing, overcurrent protection, grounding and bonding, separately derived systems, secondary-system calculations, clearances, ventilation, vaults, and transformer installations within buildings.\u003c\/p\u003e\n\u003cp\u003eGrounding and bonding questions may address grounding electrode systems, service bonding, separately derived systems, equipment grounding conductors, bonding jumpers, metal piping, structural metal, raceway bonding, objectionable current, and effective fault-current paths.\u003c\/p\u003e\n\u003cp\u003eRaceway and conductor questions may involve conduit fill, conductor adjustment, ambient-temperature correction, terminal limitations, conductor insulation, support, bends, cable trays, underground installations, physical protection, pull boxes, junction boxes, and conductor-pulling requirements.\u003c\/p\u003e\n\u003cp\u003eOvercurrent-protection preparation may include standard fuse and circuit-breaker sizes, conductor protection, tap conductors, transformers, motor circuits, selective coordination, interrupting ratings, series ratings, equipment protection, and permitted exceptions.\u003c\/p\u003e\n\u003cp\u003eSpecial-system preparation may include emergency systems, legally required standby systems, optional standby systems, generators, fire pumps, healthcare facilities, hazardous locations, marinas, swimming pools, photovoltaic systems, energy storage systems, and electric vehicle charging equipment.\u003c\/p\u003e\n\u003cp\u003eFire alarm preparation may include control units, initiating devices, notification appliances, supervising stations, emergency communications, signaling pathways, system power supplies, batteries, inspection, testing, maintenance, and documentation.\u003c\/p\u003e\n\u003cp\u003eElectrical plan questions may require candidates to interpret power plans, lighting plans, one-line diagrams, riser diagrams, panel schedules, equipment ratings, symbols, feeder routes, conductor callouts, specifications, and installation notes.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Unlimited Electrical Contractor examination is an open-book test. Candidates may use the 2020 National Electrical Code and NFPA 72, National Fire Alarm and Signaling Code, 2019 Edition, as the technical examination-room references included in this rental package.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed NEC supports questions involving services, feeders, branch circuits, motors, transformers, generators, grounding, bonding, conductor sizing, raceways, overcurrent protection, emergency systems, special occupancies, and special equipment.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed NFPA 72 supports questions involving fire alarm fundamentals, initiating devices, notification appliances, supervising stations, emergency communications, pathways, system power, inspection, testing, maintenance, and documentation.\u003c\/p\u003e\n\u003cp\u003eThe Electrical Contractors Licensing Law, Board rules, and NASCLA business reference are included for closed-book preparation and are not allowed in the examination room. Candidates should study those books before test day so licensing and business questions can be answered without consulting the references.\u003c\/p\u003e\n\u003cp\u003eApproved exam-room books must comply with current testing requirements involving binding, highlighting, notes, tabs, and added materials. Candidates should not add temporary tabs, removable notes, loose pages, unauthorized inserts, or other prohibited materials.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing still requires advanced reference-navigation ability. Candidates should know how to move from the subject of a question to the appropriate article, chapter, section, table, definition, exception, annex, or cross-reference.\u003c\/p\u003e\n\u003cp\u003eA motor-feeder question may require multiple Code sections and tables. A transformer question may involve primary protection, secondary conductors, grounding, bonding, and separately derived system requirements. A fire alarm question may require information from both the NEC and NFPA 72.\u003c\/p\u003e\n\u003cp\u003eTimed preparation should use a consistent process: identify the subject, select the correct reference, locate the governing provision, read the complete requirement, review exceptions, complete the calculation, and select the best answer.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eReview the Unlimited classification.\u003c\/strong\u003e Understand its project authority, experience qualifications, financial requirements, and supervisory responsibilities.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDocument qualifying experience.\u003c\/strong\u003e Gather employment records, project records, and statements showing the required electrical experience.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eObtain supervisory statements.\u003c\/strong\u003e Secure statements from individuals familiar with the applicant’s ability to supervise and direct electrical installation work.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eUse the included Application Service.\u003c\/strong\u003e Organize the personal, employment, experience, and supporting information needed for the examination application.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the examination application.\u003c\/strong\u003e Provide the completed application and required documentation to the Board.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit supporting records.\u003c\/strong\u003e Include experience verification, supervisory statements, character references, and other required documents.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the required examination fee.\u003c\/strong\u003e Include the applicable payment required by the Board.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive Board approval.\u003c\/strong\u003e The Board determines whether the applicant qualifies for the Unlimited examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination authorization.\u003c\/strong\u003e Approved candidates receive eligibility and scheduling instructions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule the examination.\u003c\/strong\u003e Select an appointment within the authorized testing period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the online course.\u003c\/strong\u003e Follow the technical, calculation, plan-reading, licensing, and business study sequence.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eAttend live classes.\u003c\/strong\u003e Use the guided sessions to reinforce technical subjects, Code navigation, calculations, and licensing concepts.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePractice with the rental books.\u003c\/strong\u003e Use the highlighted and tabbed references throughout the preparation period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination.\u003c\/strong\u003e Bring the required identification and approved technical references to the testing center.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the licensing process.\u003c\/strong\u003e Submit the required business, financial, and listed qualified individual information after passing.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEstablish the business entity.\u003c\/strong\u003e Complete formation of the LLC or corporation included with the package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eObtain the EIN.\u003c\/strong\u003e Complete the included IRS EIN filing for the business.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReview contractor compliance responsibilities.\u003c\/strong\u003e Organize the business around applicable licensing, renewal, supervision, recordkeeping, and operating requirements.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReturn the rental books.\u003c\/strong\u003e Return the books in similar condition within one year from receipt to qualify for the $400 deposit refund.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina State Board of Examiners of Electrical Contractors regulates the Unlimited examination and licensing process. The Board establishes applicant qualifications, reviews experience, authorizes examinations, certifies qualified individuals, issues licenses, and enforces electrical contracting laws and rules.\u003c\/p\u003e\n\u003cp\u003eAn applicant for the Unlimited classification must document at least 9,000 hours of qualifying experience. At least 8,000 hours must be primary experience. The remaining experience may consist of primary experience, secondary experience, or a combination of both.\u003c\/p\u003e\n\u003cp\u003ePrimary experience generally involves direct work installing electrical wiring and equipment governed by the NEC or performing activities directly related to those installations. Recognized experience may also include qualifying supervision, estimating, inspection, engineering, instruction, maintenance, military service, and other approved electrical work.\u003c\/p\u003e\n\u003cp\u003eUnlimited applicants must provide statements from individuals familiar with their electrical experience and ability to supervise and direct electrical wiring and installation projects.\u003c\/p\u003e\n\u003cp\u003eThe Unlimited license permits electrical contracting projects regardless of project value. The absence of a project-value limit does not remove the obligation to comply with the NEC, permits, inspections, workplace safety rules, contracts, and other legal requirements.\u003c\/p\u003e\n\u003cp\u003eElectrical contracting must be performed in the exact name shown on the active license. The licensed entity must maintain a listed qualified individual who is regularly on active duty and has the authority and responsibility to supervise and direct electrical contracting.\u003c\/p\u003e\n\u003cp\u003eApplicants for the Unlimited license must provide the financial responsibility or bonding documentation required for the classification. The documentation must relate to the license applicant and satisfy the Board’s licensing requirements.\u003c\/p\u003e\n\u003cp\u003ePassing the examination establishes the individual’s examination qualification but does not independently authorize electrical contracting. The proper business license must be issued and active before regulated work is offered or performed.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: National Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers services, feeders, branch circuits, motors, transformers, generators, grounding, bonding, raceways, conductor sizing, overcurrent protection, emergency systems, special occupancies, and electrical equipment.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: NFPA 72 - National Fire Alarm and Signaling Code, 2019 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers fire alarm fundamentals, initiating devices, notification appliances, supervising stations, emergency communications, pathways, power supplies, inspection, testing, maintenance, documentation, and system performance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Electrical Contractors Licensing Law, General Statutes Chapter 87, Article 4\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference addresses Board authority, electrical contracting, license classifications, qualified individuals, prohibited conduct, enforcement, and statutory responsibilities. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: The Board’s Rules for the Implementation of the Electrical Contractors Licensing Law, Title 21, North Carolina Administrative Code, Chapter 18B\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference covers examination qualifications, experience requirements, licensing procedures, financial responsibility, listed qualified individuals, renewals, continuing education, and disciplinary requirements. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference supports preparation involving business organization, contracts, estimating, financial management, scheduling, employment practices, safety, insurance, recordkeeping, and risk management. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference is used for open-book questions involving installations, calculations, conductors, services, feeders, motors, transformers, grounding, bonding, overcurrent protection, and special systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNFPA 72 - National Fire Alarm and Signaling Code, 2019 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference is used for open-book questions involving fire alarm systems, initiating devices, notification appliances, pathways, power supplies, inspection, testing, maintenance, and documentation.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eCreate a study schedule covering services, feeders, branch circuits, motors, transformers, grounding, bonding, conductor sizing, overcurrent protection, fire alarm systems, emergency systems, special occupancies, electrical plans, licensing law, Board rules, and business practices.\u003c\/p\u003e\n\u003cp\u003ePractice service, feeder, dwelling, commercial, motor, transformer, grounding, raceway, box-fill, load, and voltage-drop calculations. Show each step and identify the NEC table, demand factor, percentage, or rule used.\u003c\/p\u003e\n\u003cp\u003eUse the highlighted and tabbed NEC for timed navigation involving conductor ampacity, correction factors, adjustment factors, motor circuits, transformer protection, raceway fill, box sizing, grounding conductors, equipment ratings, and special systems.\u003c\/p\u003e\n\u003cp\u003eUse the highlighted and tabbed NFPA 72 to review initiating devices, notification appliances, supervising stations, emergency communications, pathways, system power, testing, inspection, maintenance, and documentation.\u003c\/p\u003e\n\u003cp\u003ePractice interpreting lighting plans, power plans, panel schedules, one-line diagrams, risers, symbols, equipment notes, feeder callouts, and circuit information. Connect each plan detail to the governing Code provision.\u003c\/p\u003e\n\u003cp\u003eStudy the licensing law and Board rules as closed-book subjects. Focus on Unlimited experience requirements, supervisory statements, listed qualified individuals, financial responsibility, license operation, renewals, and prohibited conduct.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Unlimited Electrical Contractor candidates bring exam preparation, application organization, licensing support, and business setup into one structured solution.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed rental books support faster access to major NEC articles, NFPA 72 chapters, calculation tables, licensing provisions, Board rules, and business topics.\u003c\/p\u003e\n\u003cp\u003eThe online course provides organized technical, calculation, plan-reading, licensing, and business review. Live classes add guided instruction for challenging Code concepts, calculations, reference navigation, and exam subjects.\u003c\/p\u003e\n\u003cp\u003eApplication Service helps candidates organize information needed for the examination and licensing process. Business Formation helps establish the LLC or corporation, while EIN Filing supports banking, tax administration, employee hiring, and professional business operation.\u003c\/p\u003e\n\u003cp\u003eContractor Compliance Guidance helps the new business understand important operating responsibilities involving licensing, supervision, recordkeeping, renewal, and contractor conduct.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation helps candidates identify the subject of a question, locate the appropriate reference, interpret the governing requirement, complete calculations, and apply Code provisions efficiently.\u003c\/p\u003e\n\u003cp\u003eNo package, course, class, book, application service, or business service can guarantee examination passage, application approval, license issuance, or business results. Outcomes depend on the candidate’s qualifications, experience, study effort, documentation, financial compliance, and performance during the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in The 1 Package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes five highlighted and tabbed rental books, the online exam prep course, live classes, 1 year of course access, a one-year book rental period, Application Service, Business Formation, EIN Filing, and Contractor Compliance Guidance.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $1,955, plus a $400 refundable book deposit, for a total of $2,355.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the $400 deposit refundable?\u003c\/h2\u003e\n\u003cp\u003eYes. The deposit is refundable when the rental books are returned in similar condition within one year from the date they are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the book rental period?\u003c\/h2\u003e\n\u003cp\u003eThe book rental period is one year from the date the books are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course available?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 1 year of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre live classes included?\u003c\/h2\u003e\n\u003cp\u003eYes. Guided live exam-preparation classes are included.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs Application Service included?\u003c\/h2\u003e\n\u003cp\u003eYes. Application Service is included to support organization of the information needed for the application process.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat does Business Formation include?\u003c\/h2\u003e\n\u003cp\u003eBusiness Formation establishes an LLC or corporation for the customer’s North Carolina electrical contracting business.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhy is an EIN useful?\u003c\/h2\u003e\n\u003cp\u003eAn EIN can be used to open business bank accounts, manage federal tax matters, hire employees, and operate the contracting business professionally.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does book preparation take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for the rental books to be highlighted and tabbed before shipment.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich books are allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eThe 2020 National Electrical Code and NFPA 72, 2019 Edition, are the technical exam-room references included in the package.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the licensing law, Board rules, and NASCLA book allowed during the exam?\u003c\/h2\u003e\n\u003cp\u003eNo. Those references are included for closed-book study and are not allowed in the examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow many questions are on the examination?\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Unlimited Electrical Contractor examination contains 100 multiple-choice questions.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much time is allowed?\u003c\/h2\u003e\n\u003cp\u003eCandidates have a maximum of six hours to complete the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much experience is required?\u003c\/h2\u003e\n\u003cp\u003eApplicants must document at least 9,000 hours of qualifying experience, including at least 8,000 hours of primary experience.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs there a project-value limit?\u003c\/h2\u003e\n\u003cp\u003eNo. The Unlimited classification permits electrical contracting projects regardless of project value.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the exam automatically issue the license?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing satisfies the examination requirement, but the applicant must complete the Board’s licensing process and satisfy the applicable business, financial, and listed qualified individual requirements.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919388270645,"sku":null,"price":2360.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-26-NC-UNLIMITED-ELECTRICAL-ONEPACKAGE.jpg?v=1787552473"},{"product_id":"the-1-package-all-inclusive-north-carolina-limited-intermediate-electrical-contractor-exam-licensing-business-setup-solution","title":"The 1 Package: All-Inclusive North Carolina Intermediate (I) Electrical Contractor Exam, Licensing \u0026 Business Setup Solution","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eThe 1 Package: All-Inclusive North Carolina Intermediate (I) Electrical Contractor Exam, Licensing \u0026amp; Business Setup Solution\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Intermediate Electrical Contractor examination, organize your licensing application, and establish your contracting business with one comprehensive solution. The 1 Package combines rental reference books, an online electrical trade course, live classes, Application Service, business formation support, EIN filing, and contractor compliance guidance.\u003c\/p\u003e\n\u003cp\u003eThis all-inclusive package is designed for candidates who want support beyond basic exam preparation. The North Carolina Intermediate Electrical Contractor licensing process involves technical study, electrical-code navigation, calculations, state licensing requirements, business preparation, and administrative steps. The 1 Package brings these areas together so candidates can follow a more organized path from exam preparation to business setup.\u003c\/p\u003e\n\u003cp\u003eThe package includes the National Electrical Code, NEC, 2020 Edition; NFPA 72, National Fire Alarm and Signaling Code, 2019 Edition; the North Carolina Electrical Contractors Licensing Law; the Board’s Rules for implementing that law; and the NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition.\u003c\/p\u003e\n\u003cp\u003eThe NEC and NFPA 72 support preparation for technical subjects such as services, feeders, branch circuits, grounding and bonding, conductor sizing, overcurrent protection, motors, transformers, special systems, calculations, and fire-alarm installations. The licensing law, Board rules, and NASCLA guide support closed-book preparation involving license classifications, qualified individuals, business listings, permits, inspections, contracts, estimating, project management, and financial responsibilities.\u003c\/p\u003e\n\u003cp\u003eThe package also includes 1 year of course access and live classes during the course-access period. Candidates can use the online trade course and live instruction to review technical topics, practice calculations, strengthen code-navigation skills, and build a consistent study schedule.\u003c\/p\u003e\n\u003cp\u003eApplication Service is included to help organize the information and supporting materials needed for the North Carolina electrical contractor examination and licensing process. Business Formation, EIN Filing with the IRS, and Contractor Compliance Guidance are also included to support the transition from exam candidate to properly structured contracting business.\u003c\/p\u003e\n\u003cp\u003eThe package price is $2,055, plus a $300 refundable rental-book deposit, for a total initial payment of $2,355. After the rental books are returned in acceptable condition, the $300 deposit is refunded within 1 year. Please allow 15 business days for processing.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e National Electrical Code, NEC, 2020 Edition rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e NFPA 72, National Fire Alarm and Signaling Code, 2019 Edition rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e Electrical Contractors Licensing Law, General Statutes Chapter 87, Article 4 rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e The Board’s Rules for the Implementation of the Electrical Contractors Licensing Law, Title 21, North Carolina Administrative Code, Chapter 18B rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 1 year of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLive Classes:\u003c\/strong\u003e Included during the one-year course-access period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication Service:\u003c\/strong\u003e Included with this package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBusiness Formation (LLC or Corporation):\u003c\/strong\u003e Establish the customer’s business entity so the business is legally structured and ready to operate as an electrical contractor.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEIN Filing with the IRS:\u003c\/strong\u003e Obtain the Employer Identification Number needed to open business bank accounts, manage taxes properly, hire employees, and operate the contracting business professionally.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractor Compliance Guidance:\u003c\/strong\u003e Assistance understanding compliance requirements relevant to North Carolina contractors so the business is positioned for long-term success.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $2,055\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Rental-Book Deposit:\u003c\/strong\u003e $300\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Initial Payment:\u003c\/strong\u003e $2,355\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e After the books are returned in acceptable condition, the $300 deposit is refunded within 1 year.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProcessing:\u003c\/strong\u003e Please allow 15 business days.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Intermediate Electrical Contractor examination is part of the licensing process administered by the North Carolina State Board of Examiners of Electrical Contractors. Approved candidates schedule and complete the computer-based examination through PSI.\u003c\/p\u003e\n\u003cp\u003eThe Intermediate classification falls between the Limited and Unlimited electrical contractor classifications. Candidates should review the current scope and project limitation associated with the Intermediate license before applying or accepting electrical contracting work.\u003c\/p\u003e\n\u003cp\u003eTechnical preparation may include electrical theory, services, feeders, branch circuits, wiring methods, conductor ampacity, grounding and bonding, overcurrent protection, motors, transformers, generators, raceways, boxes, special occupancies, special equipment, fire-alarm systems, and electrical calculations.\u003c\/p\u003e\n\u003cp\u003eCalculation-based preparation may involve service and feeder loads, demand factors, continuous loads, conductor sizing, temperature correction, adjustment factors, voltage drop, raceway fill, box fill, motor circuits, transformer values, grounding-conductor sizing, and overcurrent-protection requirements.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina-specific subjects may include license classifications, qualified individuals, business listings, examination applications, permits, inspections, renewals, continuing education, prohibited practices, professional conduct, and Board enforcement authority.\u003c\/p\u003e\n\u003cp\u003eBusiness and project-management preparation may include business organization, contracts, estimating, bidding, scheduling, financial management, employment responsibilities, safety, risk management, taxes, recordkeeping, and project administration.\u003c\/p\u003e\n\u003cp\u003eCandidates must receive approval from the North Carolina State Board of Examiners of Electrical Contractors before scheduling the examination. The Board controls examination eligibility, license qualification, application approval, and final license issuance.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Intermediate Electrical Contractor examination is open book for technical references authorized by the Board. Candidates may consult approved books during the examination when the references match the permitted editions and comply with current testing-center requirements.\u003c\/p\u003e\n\u003cp\u003eThe National Electrical Code, NEC, 2020 Edition, is the primary technical reference included in this package. Candidates should become familiar with the NEC’s chapters, articles, parts, definitions, tables, exceptions, informational notes, annexes, and index.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing still requires preparation. Candidates should not expect to search the entire NEC for every answer. A stronger method is to identify the main subject, choose likely article numbers or index terms, locate the applicable provision, and read the complete section before selecting an answer.\u003c\/p\u003e\n\u003cp\u003eElectrical questions may require the use of several related NEC provisions. A motor question may involve conductor sizing, overload protection, short-circuit and ground-fault protection, disconnecting means, controllers, and grounding. A service question may require load calculations, conductor sizing, service equipment, bonding, grounding electrodes, and installation requirements.\u003c\/p\u003e\n\u003cp\u003eNFPA 72, National Fire Alarm and Signaling Code, 2019 Edition, is included for fire-alarm study. Candidates can use it to review initiating devices, notification appliances, circuits, pathways, supervising stations, power supplies, emergency communications, inspection, testing, and maintenance.\u003c\/p\u003e\n\u003cp\u003eThe Electrical Contractors Licensing Law, the Board’s Rules, and the NASCLA contractor guide are not allowed in the examination room. These books are included for closed-book study. Candidates should become familiar with the licensing, regulatory, business, and project-management material before test day.\u003c\/p\u003e\n\u003cp\u003eAll materials carried into the testing center must meet current Board and PSI requirements concerning editions, binding, tabs, highlighting, markings, inserts, loose pages, and book condition.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eConfirm the Intermediate classification.\u003c\/strong\u003e Review the scope and project limitation to determine whether the Intermediate electrical contractor license matches your intended work.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReview the current examination requirements.\u003c\/strong\u003e Study the application instructions, exam subjects, approved references, and testing-center policies.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDocument qualifying electrical experience.\u003c\/strong\u003e Prepare complete and accurate employment and experience records for the requested classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGather supporting statements.\u003c\/strong\u003e Obtain the character and experience statements required by the Board’s application process.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eUse the included Application Service.\u003c\/strong\u003e Organize the information and supporting documents needed for the examination and licensing application.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the application.\u003c\/strong\u003e File the completed application and required materials with the North Carolina State Board of Examiners of Electrical Contractors.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination approval.\u003c\/strong\u003e The Board reviews the application and determines whether the applicant is eligible to test.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule through PSI.\u003c\/strong\u003e Approved candidates receive the information needed to schedule the computer-based examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination.\u003c\/strong\u003e Follow all identification, security, reference-material, and testing instructions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete license issuance requirements.\u003c\/strong\u003e After passing, submit the required license application, business-listing information, fees, and remaining documents.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEstablish the business entity.\u003c\/strong\u003e Use the included Business Formation service to form an LLC or corporation for the contracting business.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eObtain the EIN.\u003c\/strong\u003e Complete the included EIN filing so the business can establish banking, tax, payroll, and employer records.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReview contractor compliance obligations.\u003c\/strong\u003e Use the included guidance to understand ongoing business and contractor responsibilities.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eApplicants for a North Carolina electrical contractor examination must meet the Board’s qualifications for the selected classification. The application process includes experience documentation, character information, examination approval, and supporting records.\u003c\/p\u003e\n\u003cp\u003eThe Board evaluates experience gained through recognized electrical occupations and responsibilities. Relevant work may include experience as an electrician, electrical mechanic, foreman, superintendent, estimator, inspector, instructor, maintenance electrician, or another position accepted under the Board’s rules.\u003c\/p\u003e\n\u003cp\u003eExperience documentation should include accurate employment dates, duties, hours, supervisors, and descriptions of the electrical work performed. Submitted records should demonstrate experience relevant to supervising and directing electrical wiring or electrical installation work.\u003c\/p\u003e\n\u003cp\u003ePassing the examination does not independently authorize electrical contracting. The successful candidate must complete the Board’s license issuance and activation requirements and become properly associated with the licensed business or firm.\u003c\/p\u003e\n\u003cp\u003eElectrical contracting must be performed under the approved license classification and business listing. Licensees and qualified individuals are responsible for following requirements involving supervision, permits, inspections, renewals, continuing education, advertising, professional conduct, and the authorized scope of work.\u003c\/p\u003e\n\u003cp\u003eForming an LLC or corporation and obtaining an EIN do not replace electrical contractor licensing. Business formation, tax registration, and professional licensing are separate parts of establishing a contracting company.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: National Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental reference covers wiring and protection, wiring methods, services, feeders, branch circuits, grounding and bonding, motors, transformers, calculations, equipment, special occupancies, and special systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: NFPA 72, National Fire Alarm and Signaling Code, 2019 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental study reference covers fire-alarm systems, initiating devices, notification appliances, circuits, pathways, supervising stations, emergency communications, inspection, testing, and maintenance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Electrical Contractors Licensing Law, General Statutes Chapter 87, Article 4\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental study reference addresses North Carolina electrical contractor licensing, Board authority, classifications, examinations, violations, enforcement, and related legal responsibilities. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: The Board’s Rules for the Implementation of the Electrical Contractors Licensing Law, Title 21, North Carolina Administrative Code, Chapter 18B\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental study reference addresses applications, experience credit, qualified individuals, business listings, renewals, continuing education, reciprocity, enforcement, and administrative procedures. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental study reference covers business organization, licensing, contracts, estimating, bidding, financial management, project administration, employment responsibilities, safety, risk management, and North Carolina electrical contracting practices. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe NEC is the primary open-book technical reference included for the North Carolina Intermediate Electrical Contractor examination.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBegin by learning how the NEC is organized. Review Article 90, Article 100 definitions, Article 110 general requirements, and the structure of Chapters 1 through 9. Understanding the code layout helps candidates move from general rules to equipment-specific requirements.\u003c\/p\u003e\n\u003cp\u003ePractice using the NEC index with different search terms. Examination wording may not match an article heading. A question about conductor protection may involve ampacity, overcurrent protection, adjustment factors, temperature correction, physical damage, or another related term.\u003c\/p\u003e\n\u003cp\u003eUse a consistent calculation method. Identify the known values, locate the controlling code section, select the proper formula or table, maintain consistent units, complete the arithmetic, and confirm the result against applicable limitations.\u003c\/p\u003e\n\u003cp\u003eStudy the closed-book references separately. Review classifications, qualified individuals, business listings, contracts, estimating, project administration, financial management, safety, employment responsibilities, permits, inspections, and enforcement authority.\u003c\/p\u003e\n\u003cp\u003eUse the online course and live classes throughout the one-year access period. Combine instruction with timed NEC searches, calculation practice, fire-alarm review, and repeated work with the rental references.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Intermediate Electrical Contractor candidates combine exam preparation, application support, rental references, live instruction, and business setup into one organized package.\u003c\/p\u003e\n\u003cp\u003eOrganized study guidance helps divide the examination into manageable subjects, including NEC navigation, calculations, grounding and bonding, services, feeders, motors, transformers, fire alarms, licensing law, Board rules, and contractor business practices.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review connects code requirements to practical electrical systems. Candidates can study how conductors, raceways, equipment, controls, grounding, overcurrent protection, and system loads work together.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation supports a repeatable problem-solving method. Candidates learn to identify the question’s central issue, select the correct reference, locate the controlling provision, complete the calculation, and confirm the answer.\u003c\/p\u003e\n\u003cp\u003eReference-navigation practice helps candidates become more familiar with NEC articles, indexes, tables, exceptions, definitions, and cross-references. Live classes provide additional opportunities to review difficult subjects during the one-year course-access period.\u003c\/p\u003e\n\u003cp\u003eApplication Service helps organize the licensing process. Business Formation and EIN Filing support the creation of a properly structured business entity, while Contractor Compliance Guidance helps the customer understand important operational responsibilities.\u003c\/p\u003e\n\u003cp\u003eNo package can guarantee an examination score, application approval, license issuance, or business result. Preparation, licensing, compliance, and business outcomes depend on the customer’s qualifications, participation, documentation, and decisions by the appropriate authorities.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in The 1 Package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes five rental references, 1 year of course access, live classes, Application Service, Business Formation, EIN Filing with the IRS, and Contractor Compliance Guidance.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $2,055, plus a $300 refundable rental-book deposit, for a total initial payment of $2,355.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhen is the $300 deposit refunded?\u003c\/h2\u003e\n\u003cp\u003eAfter the rental books are returned in acceptable condition, the $300 deposit is refunded within 1 year.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 1 year of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre live classes included?\u003c\/h2\u003e\n\u003cp\u003eYes. Live classes are included during the one-year course-access period.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the package include business formation?\u003c\/h2\u003e\n\u003cp\u003eYes. Business Formation for an LLC or corporation is included.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs EIN filing included?\u003c\/h2\u003e\n\u003cp\u003eYes. EIN Filing with the IRS is included to help establish the business’s federal tax identification number.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs Application Service included?\u003c\/h2\u003e\n\u003cp\u003eYes. Application Service is included to help organize the examination and licensing application materials.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does processing take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for processing.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all rental books allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eNo. The Electrical Contractors Licensing Law, the Board’s Rules, and the NASCLA contractor guide are closed-book study references and are not allowed in the examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue the license?\u003c\/h2\u003e\n\u003cp\u003eNo. Successful candidates must complete the Board’s license application, business-listing, fee, and activation requirements after passing.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes forming a business automatically create an electrical contractor license?\u003c\/h2\u003e\n\u003cp\u003eNo. Business formation and contractor licensing are separate processes. The business and its qualified individual must satisfy all applicable licensing requirements before performing regulated electrical contracting work.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919388303413,"sku":null,"price":2360.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-6-NC-INTERMEDIATE-ELECTRICAL-ONEPACKAGE.jpg?v=1787552475"},{"product_id":"north-carolina-water-lines-and-sewer-lines-contractor-ultimate-exam-prep-rental-package","title":"North Carolina Water Lines and Sewer Lines Contractor Ultimate Exam Prep Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Water Lines and Sewer Lines Contractor Ultimate Exam Prep Rental Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Water Lines and Sewer Lines Contractor examination with an Ultimate package that combines highlighted and tabbed rental books, an online trade exam prep course, live classes, extended course access, and Application Service.\u003c\/p\u003e\n\u003cp\u003eThis package is designed for contractors preparing to qualify for work involving water mains, sewer mains, water service lines, building sewer lines, lift stations, pumping stations, water storage tanks, underground utilities, excavation, grading, backfill, pavement restoration, and erosion-control work associated with water and sewer construction.\u003c\/p\u003e\n\u003cp\u003eThe rental package includes technical study references covering construction safety, ductile iron pipe installation, concrete pipe and box culvert installation, excavation safety, sedimentation control, contractor business practices, pipe and excavation contracting, and North Carolina general contracting laws and regulations.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Occupational Safety and Health Standards for the Construction Industry and the Installation Guide for Ductile Iron Pipe support preparation for open-book technical questions. The package also includes the 2019 edition of \u003cem\u003eConcrete Pipe and Box Culvert Installation\u003c\/em\u003e for course preparation and technical study.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Excavation Safety Guidelines, sedimentation-control regulations, Sedimentation Pollution Control Act, North Carolina business and project management guide, \u003cem\u003ePipe and Excavation Contracting\u003c\/em\u003e, and North Carolina general contracting laws are included for closed-book review. These materials help candidates study regulatory and business subjects that must be understood before entering the examination room.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Water Lines and Sewer Lines Contractor online exam prep course organizes the examination content into practical study areas. Course topics support preparation involving trenching, excavation protection, pipe bedding, alignment, joining, thrust restraint, backfill, compaction, utility-location procedures, erosion control, safety, business law, and contractor responsibilities.\u003c\/p\u003e\n\u003cp\u003eLive classes provide guided instruction for important trade subjects, reference-navigation techniques, safety requirements, underground pipe installation practices, and commonly challenging examination topics. Candidates can use the live instruction together with the online course and rental books to build a consistent preparation plan.\u003c\/p\u003e\n\u003cp\u003eThis Ultimate package includes \u003cstrong\u003e1 year of course access\u003c\/strong\u003e and a one-year rental period for the books. The rental period begins when the books are received. The extended access period gives candidates time to review the course, attend live classes, study the closed-book material, and practice locating information in the technical references.\u003c\/p\u003e\n\u003cp\u003eApplication Service is included with this package. The service supports organization of the information needed for the North Carolina general contractor application process. Examination eligibility, application approval, license qualification, and final license issuance remain under the authority of the North Carolina Licensing Board for General Contractors.\u003c\/p\u003e\n\u003cp\u003ePlease allow 15 business days for the rental books to be highlighted and tabbed before shipment. The highlighting and permanent tabs are intended to improve organization and make major installation procedures, safety provisions, tables, definitions, legal requirements, and business topics easier to locate during study.\u003c\/p\u003e\n\u003cp\u003eThe package price is $1,315, plus a $300 refundable book deposit, for a total of $1,615. The $300 deposit is refundable when the rental books are returned in similar condition within one year from the date they are received.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e North Carolina Occupational Safety and Health Standards for the Construction Industry, with the latest available amendments, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e Installation Guide for Ductile Iron Pipe, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e Concrete Pipe and Box Culvert Installation, 2019, highlighted and tabbed rental copy for technical study.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e North Carolina Excavation Safety Guidelines, 2022 or later, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e North Carolina Administrative Code, Title 15A, Chapter 4 Sedimentation Control, including the latest amendments, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e North Carolina General Statutes Chapter 113A, Article 4, Sedimentation Pollution Control Act of 1973, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e Pipe and Excavation Contracting, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e Laws and Regulations Applicable to General Contracting in the State of North Carolina, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eOnline Course:\u003c\/strong\u003e North Carolina Water Lines and Sewer Lines Contractor trade online exam prep course.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLive Classes:\u003c\/strong\u003e Guided live exam-preparation classes are included.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 1 year of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Rental Period:\u003c\/strong\u003e One year from the date the books are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication Service:\u003c\/strong\u003e Included with this package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Preparation:\u003c\/strong\u003e Please allow 15 business days for the books to be highlighted and tabbed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $1,315.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Book Deposit:\u003c\/strong\u003e $300.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Due:\u003c\/strong\u003e $1,615.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e The $300 deposit is refundable when the rental books are returned in similar condition within one year from the date they are received.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Water Lines and Sewer Lines Contractor examination contains 45 questions. Candidates have 120 minutes to complete the examination, and a score of 70 percent is required to pass.\u003c\/p\u003e\n\u003cp\u003eThe examination is administered by PSI after the North Carolina Licensing Board for General Contractors determines that the applicant is eligible. Approved candidates receive an examination eligibility notice with scheduling instructions.\u003c\/p\u003e\n\u003cp\u003eExamination subjects include safety, general trade knowledge, concrete pipe, ductile iron pipe, excavating and grading, liens, erosion and sedimentation control, underground utility-location responsibilities, and North Carolina laws and regulations.\u003c\/p\u003e\n\u003cp\u003eSafety preparation should include personal protective equipment, trench access, excavation inspections, protective systems, competent-person responsibilities, equipment operation, material handling, hazard communication, traffic exposure, confined spaces, and work around existing utilities.\u003c\/p\u003e\n\u003cp\u003eExcavation questions may involve soil conditions, trench stability, sloping, benching, shoring, shielding, spoil placement, access ladders, ramps, water accumulation, atmospheric hazards, adjacent structures, mobile equipment, and inspection of the excavation area.\u003c\/p\u003e\n\u003cp\u003eDuctile iron pipe preparation should cover receiving and storing pipe, trench preparation, bedding, lowering pipe into the trench, alignment, gasket installation, joint assembly, cutting, fittings, restrained joints, thrust restraint, backfill, testing, inspection, and disinfection procedures.\u003c\/p\u003e\n\u003cp\u003eConcrete pipe preparation may involve pipe handling, trench dimensions, foundation preparation, bedding, line and grade, joint assembly, lift holes, haunch support, initial backfill, final backfill, compaction, testing, and protection from construction loads.\u003c\/p\u003e\n\u003cp\u003eGeneral trade knowledge may include construction terminology, tools, equipment, materials, measurements, estimating, plan interpretation, work sequencing, field coordination, grade control, and accepted underground utility installation practices.\u003c\/p\u003e\n\u003cp\u003eExcavating and grading topics may include site preparation, trench dimensions, dewatering, soil removal, equipment selection, bedding elevations, backfill lifts, compaction, settlement prevention, pavement restoration, and protection of existing improvements.\u003c\/p\u003e\n\u003cp\u003eErosion and sedimentation-control preparation may address land-disturbing activities, stabilization, sediment barriers, construction entrances, diversion measures, stockpile protection, inspections, maintenance responsibilities, and protection of nearby property and waterways.\u003c\/p\u003e\n\u003cp\u003eUnderground utility-location questions may address advance notice, facility-location requests, tolerance zones, markings, excavation practices, damage prevention, emergency procedures, and responsibilities when an underground facility is exposed or damaged.\u003c\/p\u003e\n\u003cp\u003eLaw and regulation topics may involve contractor licensing, license classifications, license limitations, qualifiers, liens, contracts, project records, business practices, statutory responsibilities, and compliance with North Carolina general contracting requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Water Lines and Sewer Lines Contractor examination is an open-book test. Candidates may use only the references specifically approved under the current PSI examination rules.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Occupational Safety and Health Standards for the Construction Industry, with the latest available amendments, supports open-book questions involving construction safety, trenching, excavation, protective systems, access, personal protective equipment, equipment operation, and workplace hazards.\u003c\/p\u003e\n\u003cp\u003eThe Installation Guide for Ductile Iron Pipe supports open-book questions involving pipe handling, storage, trench preparation, bedding, joint assembly, fittings, thrust restraint, backfill, testing, and installation practices.\u003c\/p\u003e\n\u003cp\u003eThe exam reference list identifies the 2007 edition of \u003cem\u003eConcrete Pipe and Box Culvert Installation\u003c\/em\u003e for exam-room use. This Ultimate package includes the customer-selected 2019 edition for technical study and course preparation. Candidates should obtain the edition currently listed by PSI when assembling their exam-room reference set.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Excavation Safety Guidelines, sedimentation-control rules, Sedimentation Pollution Control Act, business and project management guide, \u003cem\u003ePipe and Excavation Contracting\u003c\/em\u003e, and North Carolina general contracting laws are included for closed-book preparation and are not allowed in the examination room.\u003c\/p\u003e\n\u003cp\u003eCandidates should review current PSI rules governing highlighting, underlining, tabs, notes, inserts, and book binding before test day. Permanent tabs may support navigation, but temporary flags, loose papers, unauthorized inserts, and removable notes are not acceptable exam-room materials.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing requires more than access to references. Candidates should know which book applies to each subject and how to locate the appropriate chapter, table, procedure, or safety requirement without searching through unrelated material.\u003c\/p\u003e\n\u003cp\u003eTimed navigation practice is especially important because candidates have 120 minutes to complete 45 questions. A productive approach is to identify the topic, choose the proper reference, locate the relevant provision, read the surrounding material, and select the answer that reflects the complete requirement.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eConfirm the classification.\u003c\/strong\u003e Determine that Water Lines and Sewer Lines matches the underground utility construction the business plans to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the license limitation.\u003c\/strong\u003e Choose the Limited, Intermediate, or Unlimited limitation that fits the company’s financial qualifications and intended project size.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the qualifying party.\u003c\/strong\u003e Designate the individual who will complete the examination and qualify the business for the classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eUse the included Application Service.\u003c\/strong\u003e Organize the business, ownership, qualifier, financial, and supporting information required for the application.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the license application.\u003c\/strong\u003e Provide the completed application and required documents to the North Carolina Licensing Board for General Contractors.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e The Board reviews the application before authorizing the qualifying party to schedule the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule with PSI.\u003c\/strong\u003e Follow the eligibility instructions and select an available examination appointment.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the online course.\u003c\/strong\u003e Review safety, ductile iron pipe, concrete pipe, excavation, erosion control, utility location, liens, and regulations.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eAttend live classes.\u003c\/strong\u003e Use guided instruction to reinforce trade topics, reference navigation, safety requirements, and installation procedures.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStudy the closed-book references.\u003c\/strong\u003e Review the regulatory and business materials that cannot be consulted during the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePractice with approved references.\u003c\/strong\u003e Build speed and familiarity using the exam-room technical books.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination.\u003c\/strong\u003e Bring the required identification and permitted references to the PSI testing center.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete remaining license requirements.\u003c\/strong\u003e Satisfy the applicable financial, qualifier, and business requirements before license issuance.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMaintain the license.\u003c\/strong\u003e Keep the business information, qualifier status, annual renewal, and continuing education requirements current.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReturn the rental books.\u003c\/strong\u003e Return the books in similar condition within one year from receipt to qualify for the $300 deposit refund.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates the Water Lines and Sewer Lines classification. It is a public utilities specialty classification covering construction work associated with water and sewer systems.\u003c\/p\u003e\n\u003cp\u003eThe classification includes water and sewer mains, water service lines, house and building sewer lines, water storage tanks, lift stations, pumping stations, and related appurtenances. It also includes pavement patching, backfill, and erosion-control work performed as part of water-line and sewer-line construction.\u003c\/p\u003e\n\u003cp\u003eA North Carolina general contractor license is required when the cost of the undertaking meets or exceeds the state licensing threshold. The active license must include the classification and limitation needed for the contracted work.\u003c\/p\u003e\n\u003cp\u003eEach licensed entity must have a qualifying party for the approved classification. The qualifying party is the individual whose examination qualification supports the business license.\u003c\/p\u003e\n\u003cp\u003eThe applicant must apply in the business’s correct legal name and provide the ownership, organizational, qualifier, and financial information required by the Board.\u003c\/p\u003e\n\u003cp\u003eLicense limitations are connected to the applicant’s financial qualifications and determine the size of project the business may undertake. Candidates should select the limitation that matches the company’s intended contracting activity and financial documentation.\u003c\/p\u003e\n\u003cp\u003ePassing the trade examination does not independently authorize contracting. The Board must issue the license before the business performs or offers to perform work requiring North Carolina general contractor licensure.\u003c\/p\u003e\n\u003cp\u003eLicensed contractors remain responsible for compliance with contracts, plans, specifications, safety requirements, environmental regulations, utility-location laws, permits, inspections, testing requirements, and professional standards.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers construction safety, trenching, excavation, protective systems, access, personal protective equipment, equipment operation, and workplace hazards.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Installation Guide for Ductile Iron Pipe\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference addresses handling, storage, trench preparation, bedding, joint assembly, fittings, restrained joints, thrust restraint, backfill, testing, and ductile iron pipe installation.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Concrete Pipe and Box Culvert Installation, 2019\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference supports technical study involving concrete pipe handling, foundations, bedding, alignment, joints, haunch support, backfill, compaction, and installation quality.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Excavation Safety Guidelines, 2022 or Later\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference supports preparation involving utility-location requests, markings, tolerance zones, safe excavation, damage prevention, and responsibilities around underground facilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Administrative Code, Title 15A, Chapter 4 Sedimentation Control\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference covers erosion and sedimentation-control rules for land-disturbing activities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina General Statutes Chapter 113A, Article 4 Sedimentation Pollution Control Act of 1973\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference covers statutory responsibilities for controlling sedimentation pollution.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference covers contracts, estimating, financial management, project administration, employment practices, safety, insurance, and business operations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Pipe and Excavation Contracting\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference addresses excavation operations, pipe installation, equipment, estimating, production, materials, and field practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Laws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference covers statutes and rules governing contractor licensing, qualifiers, business operations, license limitations, and professional responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference supports open-book safety, trenching, and excavation questions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eInstallation Guide for Ductile Iron Pipe\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference supports open-book questions involving ductile iron pipe handling, joining, installation, restraint, backfill, and testing.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBuild a study schedule around safety, ductile iron pipe, concrete pipe, excavation, grading, erosion control, utility location, liens, and contractor regulations. Give additional attention to pipe installation and excavation because these subjects involve multiple steps and detailed field procedures.\u003c\/p\u003e\n\u003cp\u003ePractice locating trenching provisions, protective-system requirements, access rules, spoil-placement requirements, water-accumulation controls, and competent-person responsibilities in the construction safety reference.\u003c\/p\u003e\n\u003cp\u003eReview ductile iron pipe installation from delivery through testing. Understand bedding, joint cleanliness, gasket placement, deflection, fittings, thrust restraint, initial backfill, pressure testing, leakage testing, and disinfection.\u003c\/p\u003e\n\u003cp\u003eStudy concrete pipe as an installation system. Pipe performance depends on foundation preparation, bedding, haunch support, joint assembly, initial backfill, final backfill, compaction, and protection from excessive construction loading.\u003c\/p\u003e\n\u003cp\u003eReview the closed-book references repeatedly so that excavation safety, sedimentation control, utility-location requirements, lien procedures, licensing rules, and business responsibilities can be recalled during the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Water Lines and Sewer Lines Contractor candidates organize technical, safety, regulatory, and business subjects into a structured preparation plan.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed rental books support faster navigation through safety rules, pipe-installation procedures, excavation topics, sedimentation-control provisions, contractor laws, and project-management subjects.\u003c\/p\u003e\n\u003cp\u003eThe online course provides trade-focused review involving ductile iron pipe, concrete pipe, trenching, grading, utility location, erosion control, contractor law, liens, and field operations.\u003c\/p\u003e\n\u003cp\u003eLive classes provide guided opportunities to review challenging material, improve reference navigation, discuss installation procedures, and strengthen understanding of important examination subjects.\u003c\/p\u003e\n\u003cp\u003eApplication Service supports candidates as they organize information for the North Carolina licensing process. Final application approval and examination eligibility remain with the Board.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation helps candidates identify the subject of a question, select the appropriate reference, locate the relevant information, and apply the requirement to a realistic construction situation.\u003c\/p\u003e\n\u003cp\u003eNo course, class, rental package, or application service can guarantee examination passage or license issuance. Results depend on the candidate’s knowledge, field experience, study effort, application approval, reference-navigation ability, and examination performance.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in the Ultimate package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes nine highlighted and tabbed rental books, the online trade exam prep course, live classes, 1 year of course access, a one-year book rental period, and Application Service.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $1,315, plus a $300 refundable book deposit, for a total of $1,615.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the $300 deposit refundable?\u003c\/h2\u003e\n\u003cp\u003eYes. The deposit is refundable when the rental books are returned in similar condition within one year from the date they are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the rental period?\u003c\/h2\u003e\n\u003cp\u003eThe rental period is one year from the date the books are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course available?\u003c\/h2\u003e\n\u003cp\u003eThe Ultimate package includes 1 year of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre live classes included?\u003c\/h2\u003e\n\u003cp\u003eYes. Guided live exam-preparation classes are included.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs Application Service included?\u003c\/h2\u003e\n\u003cp\u003eYes. Application Service is included to support organization of the information needed for the North Carolina licensing application process.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does book preparation take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for the rental books to be highlighted and tabbed before shipment.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the examination open book?\u003c\/h2\u003e\n\u003cp\u003eYes. Candidates may use the references specifically permitted under the current PSI examination rules.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the included 2019 concrete pipe book the listed exam-room edition?\u003c\/h2\u003e\n\u003cp\u003eNo. The package includes the 2019 edition for study and course preparation. Candidates should obtain the concrete pipe edition currently identified on the PSI exam reference list for exam-room use.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow many questions are on the examination?\u003c\/h2\u003e\n\u003cp\u003eThe examination contains 45 questions.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much time is allowed?\u003c\/h2\u003e\n\u003cp\u003eCandidates have 120 minutes to complete the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat score is required to pass?\u003c\/h2\u003e\n\u003cp\u003eA score of 70 percent is required to pass.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue the license?\u003c\/h2\u003e\n\u003cp\u003eNo. The applicant must complete the Board’s financial, business, qualifier, and licensing requirements before the license is issued.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919388598325,"sku":null,"price":1620.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-75-NC-WATER-LINES-ULTIMATE.jpg?v=1787552482"},{"product_id":"north-carolina-residential-contractor-ultimate-exam-prep-rental-package","title":"North Carolina Residential Contractor Ultimate Exam Prep Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Residential Contractor Ultimate Exam Prep Rental Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Residential Contractor examination with a comprehensive Ultimate package that combines highlighted and tabbed rental books, 1 year of online course access, live classes, and Application Service. This package is designed for candidates who want a structured way to study residential construction, code requirements, jobsite safety, business law, project management, carpentry, roofing, masonry, concrete, excavation, wood trusses, erosion control, and North Carolina contractor regulations.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Residential Contractor classification covers qualifying construction and demolition work involving residential units governed by the state residential building code. Residential contractors may also perform related site work, driveways, sidewalks, water and wastewater work, and authorized specialty work when those activities are part of the residential project.\u003c\/p\u003e\n\u003cp\u003ePreparing for this examination requires a broad understanding of how residential projects move from planning and site preparation through foundations, framing, roofing, exterior finishes, interior construction, inspections, and completion. Candidates must also understand contractor responsibilities involving permits, safety, contracts, financial management, estimating, project administration, and compliance with North Carolina licensing requirements.\u003c\/p\u003e\n\u003cp\u003eThis Ultimate package includes the North Carolina Occupational Safety and Health Standards for the Construction Industry with the latest available amendments, the Contractor’s Guide to Business, Law and Project Management—North Carolina General Contractors Edition, 10th Edition, the 2018 North Carolina Residential Code, and the 2018 North Carolina Administrative Code and Policies. These references are included for open-book examination preparation.\u003c\/p\u003e\n\u003cp\u003eThe package also includes nine books that are not allowed in the examination room but support closed-book study. These references cover carpentry, roofing, masonry, excavation, concrete, metal-plate-connected wood trusses, sedimentation control, and North Carolina general contractor laws and regulations.\u003c\/p\u003e\n\u003cp\u003eAll included trade reference books are highlighted and tabbed to help candidates organize their study. Tabs identify major sections and common examination subjects, while highlighting draws attention to important requirements, procedures, terminology, tables, and construction concepts. Candidates should still read the complete surrounding provisions and practice navigating the books under timed conditions.\u003c\/p\u003e\n\u003cp\u003eThe package includes 1 year of course access and live classes during the one-year access period. The North Carolina Residential Contractor online exam prep course helps divide a large examination library into manageable study areas. Live classes provide additional trade-focused review, reference-navigation practice, and opportunities to reinforce difficult construction topics.\u003c\/p\u003e\n\u003cp\u003eApplication Service is included with this Ultimate package. The service helps organize information and supporting materials for the North Carolina contractor examination and licensing application process. Final examination eligibility and license approval remain subject to the requirements and decisions of the North Carolina Licensing Board for General Contractors.\u003c\/p\u003e\n\u003cp\u003eThe package price is $2,065, plus a $650 refundable rental-book deposit, for a total initial payment of $2,715. The $650 deposit is refunded when the books are returned in similar condition within 1 year from the time they are received. Please allow 15 business days for processing.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book(s):\u003c\/strong\u003e Thirteen highlighted and tabbed rental references listed below.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 1 year of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLive Classes:\u003c\/strong\u003e Included during the one-year course-access period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication Service:\u003c\/strong\u003e Included with this package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Rental Period:\u003c\/strong\u003e 1 year from the time the books are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $2,065\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Rental-Book Deposit:\u003c\/strong\u003e $650\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Initial Payment:\u003c\/strong\u003e $2,715\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e The $650 deposit is refunded when the books are returned in similar condition within 1 year from the time they are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProcessing:\u003c\/strong\u003e Please allow 15 business days for processing.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Residential Contractor examination evaluates knowledge associated with residential construction, demolition, site work, safety, code compliance, business management, and contractor responsibilities. Candidates should prepare for both technical construction questions and questions involving business law, contracts, project administration, and licensing requirements.\u003c\/p\u003e\n\u003cp\u003eResidential-code preparation may include foundations, floor systems, wall framing, roof framing, exterior walls, weather protection, interior finishes, stairs, guards, decks, masonry, chimneys, structural requirements, fire-resistance provisions, insulation, and coordination with mechanical, plumbing, and electrical systems.\u003c\/p\u003e\n\u003cp\u003eCarpentry preparation should address building materials, layout, floor framing, wall framing, roof framing, openings, headers, sheathing, fastening, stairs, exterior trim, interior finishes, and interpretation of plans and specifications. Candidates should understand how loads move from the roof and upper levels through walls, floors, foundations, and soil.\u003c\/p\u003e\n\u003cp\u003eRoofing preparation may involve roof shapes, slopes, framing, sheathing, underlayment, flashing, drainage, ventilation, roof coverings, material quantities, estimating, installation practices, and protection against moisture intrusion.\u003c\/p\u003e\n\u003cp\u003eMasonry study may include brick, block, stone, mortar, grout, reinforcement, anchors, ties, flashing, weeps, control joints, expansion joints, veneer construction, chimneys, fireplaces, foundations, and protection of masonry during construction.\u003c\/p\u003e\n\u003cp\u003eConcrete preparation may address materials, proportioning, formwork, reinforcement, placement, consolidation, finishing, curing, joints, slabs, walls, footings, quality control, cold- and hot-weather practices, and common construction defects.\u003c\/p\u003e\n\u003cp\u003ePipe and excavation topics may include soils, trenching, grading, drainage, pipe installation, compaction, shoring, dewatering, underground utilities, excavation safety, and coordination with foundations, water systems, and wastewater systems.\u003c\/p\u003e\n\u003cp\u003eWood-truss preparation should include storage, handling, lifting, placement, temporary restraint, permanent bracing, installation sequencing, bearing, connections, and protection against damage or unauthorized field modifications.\u003c\/p\u003e\n\u003cp\u003eSafety preparation may include fall protection, ladders, scaffolds, excavations, electrical hazards, tools, silica exposure, personal protective equipment, material handling, housekeeping, cranes, and employer responsibilities.\u003c\/p\u003e\n\u003cp\u003eErosion and sedimentation control may also appear in preparation materials. Candidates should understand the purpose of preventing sediment from leaving disturbed areas, protecting adjoining property and waterways, maintaining control measures, and complying with applicable North Carolina requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Residential Contractor examination is an open-book test for the references identified as permitted in the examination room. This package includes four exam-room references and nine additional closed-book study references.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Occupational Safety and Health Standards for the Construction Industry supports open-book questions involving fall protection, ladders, scaffolds, excavation, tools, personal protective equipment, electrical hazards, material handling, and employer responsibilities.\u003c\/p\u003e\n\u003cp\u003eThe Contractor’s Guide to Business, Law and Project Management—North Carolina General Contractors Edition, 10th Edition supports questions involving contracts, estimating, project management, financial controls, employment practices, insurance, safety programs, risk management, and contractor business operations.\u003c\/p\u003e\n\u003cp\u003eThe 2018 North Carolina Residential Code supports technical questions involving foundations, floor systems, walls, roofs, stairs, decks, exterior finishes, masonry, structural requirements, and other qualifying residential construction provisions.\u003c\/p\u003e\n\u003cp\u003eThe 2018 North Carolina Administrative Code and Policies supports questions involving permits, inspections, construction documents, approvals, code administration, enforcement, and the responsibilities of contractors and code officials.\u003c\/p\u003e\n\u003cp\u003eThe remaining references are not allowed in the examination room. They should be used throughout the one-year rental period to develop knowledge in carpentry, roofing, masonry, excavation, concrete, truss installation, erosion control, and North Carolina contractor regulations.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing requires efficient reference navigation. Candidates should study the tables of contents, indexes, definitions, chapter layouts, tables, figures, appendices, and cross-references in the permitted books.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed format supports faster navigation, but candidates must still understand the subject and choose the correct publication. A residential framing question may require the Residential Code, while a permit or inspection question may require the Administrative Code and Policies.\u003c\/p\u003e\n\u003cp\u003eRead complete provisions before selecting an answer. Code and business requirements may contain exceptions, definitions, limitations, or related sections that change how the rule applies.\u003c\/p\u003e\n\u003cp\u003eAll books taken into the examination room must comply with the current testing rules governing editions, binding, tabs, highlighting, markings, inserts, and loose materials.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eConfirm the Residential Contractor classification.\u003c\/strong\u003e Review the authorized scope and determine whether it matches the residential construction work the applicant intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the license limitation.\u003c\/strong\u003e Choose the limited, intermediate, or unlimited limitation based on the intended value of individual projects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the applicant entity.\u003c\/strong\u003e Determine whether the license applicant will be an individual, LLC, corporation, partnership, or another eligible entity.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesignate a qualifier.\u003c\/strong\u003e Identify the person who will satisfy the examination requirement for the Residential Contractor classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eUse the included Application Service.\u003c\/strong\u003e Organize the applicant, entity, qualifier, financial, ownership, and supporting information needed for submission.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the application.\u003c\/strong\u003e File the required materials through the North Carolina general contractor licensing process.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide evidence of financial responsibility.\u003c\/strong\u003e Meet the financial requirement associated with the selected license limitation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the background-check requirement.\u003c\/strong\u003e Provide or authorize the criminal background information required by the Board.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e Complete the application review process and obtain authorization before scheduling the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule the examination.\u003c\/strong\u003e Follow the scheduling instructions provided after eligibility is approved.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrepare the approved references.\u003c\/strong\u003e Confirm that all exam-room books comply with current rules for tabs, highlighting, binding, and markings.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination.\u003c\/strong\u003e Follow all identification, security, scheduling, calculator, and reference-material instructions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the licensing process.\u003c\/strong\u003e Passing the examination satisfies the testing requirement, but the applicant must complete all remaining requirements before the license is issued.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates Residential Contractor licenses. Applicants must meet the Board’s requirements involving age, character, financial responsibility, application documentation, background information, qualification, and examination eligibility.\u003c\/p\u003e\n\u003cp\u003eA North Carolina general contractor license is required when a person or business bids on, contracts for, or undertakes a construction project valued at $40,000 or more, subject to the definitions and exceptions established by state law.\u003c\/p\u003e\n\u003cp\u003eThe Residential Contractor classification covers qualifying construction and demolition involving residential units governed by the residential building code adopted by the North Carolina Building Code Council.\u003c\/p\u003e\n\u003cp\u003eThe classification also includes related site work, driveways, sidewalks, and water and wastewater systems ancillary to the residential structures, along with authorized specialty work performed as part of the project.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina general contractor licenses are issued with limited, intermediate, or unlimited limitations. Each limitation affects the value of individual projects the license holder may undertake and carries specific financial qualification requirements.\u003c\/p\u003e\n\u003cp\u003eThe qualifier’s examination credential and the contractor license are separate. Passing the Residential Contractor examination does not independently authorize an individual or business to enter into regulated construction contracts. The approved license must be issued to the legal entity conducting the contracting activity.\u003c\/p\u003e\n\u003cp\u003eLicensed contractors must operate within the classification and limitation shown on the active license. They are also responsible for maintaining accurate entity and qualifier information, obtaining permits, arranging inspections, complying with safety requirements, and meeting contractual and professional obligations.\u003c\/p\u003e\n\u003cp\u003eApplication approval, examination eligibility, and license issuance are controlled by the North Carolina Licensing Board for General Contractors. Candidates should complete all requested documentation accurately and respond to any additional requirements related to their application.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers fall protection, ladders, scaffolds, excavation, tools, electrical hazards, material handling, personal protective equipment, and employer safety responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers business organization, contracts, estimating, financial management, project administration, employment practices, safety, insurance, and risk management.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Building Code: Residential Code, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference contains requirements for qualifying residential construction, including foundations, framing, roofing, exterior walls, stairs, decks, masonry, structural systems, and related code provisions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Administrative Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference addresses permits, construction documents, inspections, approvals, code administration, enforcement, and contractor responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Carpentry and Building Construction, 2016\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers materials, layout, floor systems, wall framing, roof framing, stairs, sheathing, fastening, exterior finishes, and interior construction. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Roofing Construction and Estimating, Daniel Atcheson, 1995\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers roof systems, materials, flashing, drainage, installation practices, quantities, and estimating. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Modern Masonry - Brick, Block, Stone, Clois E. Kicklighter, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers brick, block, stone, mortar, grout, reinforcement, flashing, joints, veneer, fireplaces, and masonry construction. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Pipe and Excavation Contracting\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference addresses excavation, trenching, soils, grading, drainage, pipe installation, compaction, shoring, dewatering, and underground construction. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: The Contractor’s Guide to Quality Concrete Construction, 4th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers concrete materials, formwork, reinforcement, placement, consolidation, finishing, curing, joints, quality control, and common defects. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: BCSI: Guide to Good Practice for Handling, Installing, Restraining, and Bracing of Metal Plate Connected Wood Trusses, 2025\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers truss storage, handling, lifting, placement, temporary restraint, permanent bracing, connections, and safe installation. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Administrative Code, Title 15A, Chapter 4 Sedimentation Control, Including Latest Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference addresses administrative requirements for erosion and sedimentation control. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina General Statutes Chapter 113A, Article 4 Sedimentation Pollution Control Act of 1973\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference contains statutory provisions related to erosion and sedimentation control. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Laws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers classifications, limitations, qualifiers, applications, licensing requirements, conduct, liens, and contractor responsibilities. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for open-book questions involving construction safety and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for open-book questions involving contracts, estimating, financial management, project administration, and contractor business operations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Building Code: Residential Code, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for open-book technical questions involving residential construction and code compliance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Administrative Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for open-book questions involving permits, inspections, approvals, administration, and enforcement.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eDivide preparation into residential code, carpentry, roofing, masonry, concrete, excavation, wood trusses, safety, sedimentation control, business law, and contractor regulations.\u003c\/p\u003e\n\u003cp\u003eUse the four exam-room references during timed open-book exercises. Read the question, identify the subject, select the correct publication, locate the governing section, and review the complete requirement before choosing an answer.\u003c\/p\u003e\n\u003cp\u003eStudy the nine restricted references separately. Because they will not be available during the examination, review their major concepts through online course lessons, live classes, technical reading, practice questions, and repeated study.\u003c\/p\u003e\n\u003cp\u003ePractice interpreting plans, specifications, construction details, material quantities, and installation sequences. Residential contractor questions often require candidates to connect code requirements with practical building conditions.\u003c\/p\u003e\n\u003cp\u003eGive special attention to structural load paths, framing systems, roof assemblies, moisture protection, masonry, concrete, excavation safety, truss bracing, and sedimentation control.\u003c\/p\u003e\n\u003cp\u003eUse the one-year rental and course-access period to maintain a consistent study schedule. Rotate among online lessons, live instruction, technical reading, timed lookups, and focused review of weaker areas.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Residential Contractor candidates combine highlighted and tabbed rental references, an online trade course, live classes, and Application Service in one organized package.\u003c\/p\u003e\n\u003cp\u003eOrganized study guidance separates residential construction into manageable categories, including foundations, framing, roofing, masonry, concrete, excavation, trusses, safety, erosion control, business law, and contractor regulations.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review connects code requirements with practical construction methods. Candidates can strengthen their understanding of how site work, structural systems, materials, safety, and project administration fit together during residential construction.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation helps candidates identify the subject of an examination question, choose the correct reference, locate the applicable provision, and interpret the information efficiently.\u003c\/p\u003e\n\u003cp\u003eReference-navigation practice focuses on the four books permitted in the examination room. The highlighted and tabbed format supports organized study and faster access to major topics during timed practice.\u003c\/p\u003e\n\u003cp\u003eThe online course and live classes also support closed-book preparation for the carpentry, roofing, masonry, concrete, excavation, truss, erosion-control, and contractor-law references that cannot be taken into the examination room.\u003c\/p\u003e\n\u003cp\u003eApplication Service helps organize the administrative side of the examination and licensing process. No package can guarantee examination passage, application approval, or license issuance. Results depend on the candidate’s qualifications, preparation, experience, reference familiarity, participation, and performance during the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in the Ultimate package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes thirteen highlighted and tabbed rental references, 1 year of online course access, live classes during the one-year access period, and Application Service.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $2,065, plus a $650 refundable rental-book deposit, for a total initial payment of $2,715.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhen is the $650 deposit refunded?\u003c\/h2\u003e\n\u003cp\u003eThe deposit is refunded when the books are returned in similar condition within 1 year from the time they are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the rental period?\u003c\/h2\u003e\n\u003cp\u003eThe rental period is 1 year from the time the books are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 1 year of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre live classes included?\u003c\/h2\u003e\n\u003cp\u003eYes. Live classes are included during the one-year course-access period.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs Application Service included?\u003c\/h2\u003e\n\u003cp\u003eYes. Application Service is included with this Ultimate package.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does processing take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for processing.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the rental books highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eYes. The included trade references are highlighted and tabbed to support organized study and reference navigation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich books are allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eThe safety standards, Contractor’s Guide to Business, Law and Project Management, 2018 Residential Code, and 2018 Administrative Code and Policies are included as exam-room references.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all thirteen books allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eNo. Nine books are included for closed-book preparation and are not allowed in the examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue a contractor license?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing the examination satisfies the testing requirement, but the applicant must complete all financial, entity, qualifier, application, and licensing requirements before a license is issued.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the package guarantee a passing score?\u003c\/h2\u003e\n\u003cp\u003eNo. Examination performance depends on the candidate’s qualifications, experience, study effort, reference-navigation skills, participation, and performance during the test.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919388663861,"sku":null,"price":2720.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-63-NC-RESIDENTIAL-ULTIMATE.jpg?v=1787552485"},{"product_id":"north-carolina-roofing-contractor-ultimate-exam-prep-rental-package","title":"North Carolina Roofing Contractor Ultimate Exam Prep Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Roofing Contractor Ultimate Exam Prep Rental Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Roofing Contractor examination with a comprehensive Ultimate package that combines highlighted and tabbed rental books, 1 year of online course access, live classes, and Application Service. This package is designed for candidates who want an organized preparation path covering steep-slope roofing, membrane systems, metal panels, spray polyurethane foam roofing, roof substrates, repairs, flashing, construction safety, business law, licensing, liens, and North Carolina building-code requirements.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Roofing specialty classification covers the installation and repair of roofs and decks on residential, commercial, industrial, and institutional structures when the installed materials create a watertight and weather-resistant surface. Roofing candidates must be prepared to work across multiple roof systems and understand how materials, substrates, drainage, flashing, attachment methods, weather conditions, and safety requirements affect a completed installation.\u003c\/p\u003e\n\u003cp\u003eThis rental library includes the North Carolina Occupational Safety and Health Standards for the Construction Industry with the latest available amendments, the 2018 North Carolina Building Code, the Contractor’s Guide to Business, Law and Project Management—North Carolina General Contractors Edition, 10th Edition, the 2018 North Carolina Administrative Code and Policies, and three NRCA Roofing Manuals covering steep-slope, metal-panel, spray polyurethane foam, and membrane roofing systems.\u003c\/p\u003e\n\u003cp\u003eThe package also includes Roofing Construction and Estimating by Daniel Atcheson and Laws and Regulations Applicable to General Contracting in the State of North Carolina. These two references support study involving roofing calculations, materials, estimating, installation practices, licensing, liens, and contractor responsibilities, but they are not allowed in the examination room.\u003c\/p\u003e\n\u003cp\u003eAll included trade reference books are highlighted and tabbed to support organized study and efficient navigation. Tabs help identify major subjects, while highlighting draws attention to important requirements, tables, details, procedures, and terminology. Candidates should still read complete sections and practice locating information under timed conditions rather than relying only on marked passages.\u003c\/p\u003e\n\u003cp\u003eThe package includes 1 year of course access and live classes during the one-year access period. The North Carolina Roofing Contractor online exam prep course organizes the examination content into manageable categories and helps candidates build familiarity with the approved reference books. Live classes provide additional trade-focused review and support for difficult roofing, code, safety, and business topics.\u003c\/p\u003e\n\u003cp\u003eApplication Service is included with this Ultimate package. This service helps organize information and supporting materials for the North Carolina contractor examination and licensing application process. Examination eligibility and contractor license approval remain subject to the requirements and decisions of the North Carolina Licensing Board for General Contractors.\u003c\/p\u003e\n\u003cp\u003eThe package price is $2,015, plus a $700 refundable rental-book deposit, for a total initial payment of $2,715. The $700 deposit is refunded when the books are returned in similar condition within 1 year from the time they are received. Please allow 15 business days for the books to be highlighted, tabbed, and processed.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book(s):\u003c\/strong\u003e Nine highlighted and tabbed rental references listed below.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 1 year of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLive Classes:\u003c\/strong\u003e Included during the one-year course-access period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication Service:\u003c\/strong\u003e Included with this package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Rental Period:\u003c\/strong\u003e 1 year from the time the books are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $2,015\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Rental-Book Deposit:\u003c\/strong\u003e $700\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Initial Payment:\u003c\/strong\u003e $2,715\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e The $700 deposit is refunded when the books are returned in similar condition within 1 year from the time they are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProcessing:\u003c\/strong\u003e Please allow 15 business days for the books to be highlighted, tabbed, and processed.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Roofing Contractor examination contains 60 questions, requires a score of 70 percent to pass, and allows 120 minutes for completion. The examination is administered through PSI after the candidate receives eligibility from the North Carolina Licensing Board for General Contractors.\u003c\/p\u003e\n\u003cp\u003eThe examination content includes safety, roofing substrates, steep-slope roofing, roof repairs, elastomeric roofing, built-up bituminous roofing, business and law, sheet metal and flashing, licensing, liens, and general building-code requirements.\u003c\/p\u003e\n\u003cp\u003eSteep-slope roofing represents the largest subject area. Candidates should study asphalt shingles, wood shakes and shingles, slate, clay and concrete tile, roof decks, underlayment, fastening, flashing, valleys, hips, ridges, penetrations, ventilation, material storage, and weather-related installation practices.\u003c\/p\u003e\n\u003cp\u003eRoof-substrate preparation may involve deck materials, sheathing, insulation, cover boards, vapor retarders, drainage, slope, attachment, moisture conditions, existing roof systems, compatibility, and preparation before installation of the finished roofing material.\u003c\/p\u003e\n\u003cp\u003eMembrane-roofing preparation should include built-up roofing, modified bitumen, thermoplastic and thermoset single-ply systems, attachment methods, insulation, seams, flashing, penetrations, expansion joints, drainage, repairs, maintenance, and protection of completed work.\u003c\/p\u003e\n\u003cp\u003eMetal-panel preparation may include standing-seam and through-fastened systems, panel layout, substrates, clips, fasteners, laps, seams, sealants, thermal movement, flashing, transitions, trim, underlayment, condensation control, and safe handling of long metal panels.\u003c\/p\u003e\n\u003cp\u003eSpray polyurethane foam roofing preparation may address substrate conditions, foam application, thickness, protective coatings, surface preparation, weather limitations, drainage, flashing, repairs, maintenance, and protection of adjacent property and building components.\u003c\/p\u003e\n\u003cp\u003eRoof-repair questions may involve leak investigation, moisture damage, open seams, punctures, flashing defects, deteriorated materials, failed coatings, substrate problems, drainage issues, and selection of compatible repair materials and procedures.\u003c\/p\u003e\n\u003cp\u003eSheet-metal and flashing study may include base flashing, counterflashing, valleys, copings, edge metal, gravel stops, scuppers, gutters, downspouts, expansion joints, penetrations, roof-to-wall transitions, and methods used to direct water away from vulnerable areas.\u003c\/p\u003e\n\u003cp\u003eSafety preparation should include fall protection, personal fall-arrest systems, warning-line systems, roof openings, ladders, scaffolds, electrical hazards, material handling, hoisting, hot work, fire prevention, personal protective equipment, silica exposure, and employer responsibilities.\u003c\/p\u003e\n\u003cp\u003eBusiness and law preparation may include contracts, estimating, project administration, financial management, employment practices, insurance, scheduling, safety programs, risk control, licensing requirements, and construction liens.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Roofing Contractor examination is an open-book test. Candidates may use only the references identified as permitted for the examination, and each reference must comply with the current testing-center rules.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Occupational Safety and Health Standards for the Construction Industry supports questions involving fall protection, ladders, scaffolds, roof openings, electrical hazards, personal protective equipment, material handling, fire prevention, and employer safety responsibilities.\u003c\/p\u003e\n\u003cp\u003eThe 2018 North Carolina Building Code supports questions involving roof assemblies, weather protection, structural requirements, fire classifications, drainage, insulation, flashing, reroofing, materials, and general building-code provisions.\u003c\/p\u003e\n\u003cp\u003eThe Contractor’s Guide to Business, Law and Project Management—North Carolina General Contractors Edition, 10th Edition supports questions involving contracts, estimating, financial management, project administration, employment practices, insurance, safety programs, and risk management.\u003c\/p\u003e\n\u003cp\u003eThe 2018 North Carolina Administrative Code and Policies supports questions involving permits, inspections, construction documents, approvals, code administration, enforcement, and the authority and responsibilities of contractors and code officials.\u003c\/p\u003e\n\u003cp\u003eThe NRCA Roofing Manual: Steep Slope Roof Systems supports technical questions involving asphalt shingles, wood roofing, tile, slate, underlayments, decks, flashing, ventilation, details, and steep-slope installation practices.\u003c\/p\u003e\n\u003cp\u003eThe NRCA Roofing Manual: Metal Panel and SPF Roof Systems supports preparation involving metal roof panels, clips, fasteners, seams, thermal movement, flashing, spray polyurethane foam, coatings, repairs, and maintenance.\u003c\/p\u003e\n\u003cp\u003eThe NRCA Roofing Manual: Membrane Roofing Systems supports questions involving built-up, modified bitumen, and single-ply systems, including substrates, insulation, attachment, seams, flashing, drainage, maintenance, and repairs.\u003c\/p\u003e\n\u003cp\u003eRoofing Construction and Estimating and Laws and Regulations Applicable to General Contracting in the State of North Carolina are included for study but are not allowed in the examination room. Candidates should review these books thoroughly during the one-year rental period.\u003c\/p\u003e\n\u003cp\u003ePermanent tabs and highlighting may be used when they comply with current PSI requirements. Removable tabs, loose notes, unauthorized inserts, and other prohibited materials should not be added to the books.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing still requires preparation. Candidates should practice identifying the roofing system or business topic, selecting the correct book, locating the applicable section, and reading the surrounding requirements before choosing an answer.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eConfirm the Roofing specialty classification.\u003c\/strong\u003e Review the authorized scope and determine whether it matches the roofing work the applicant intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the appropriate license limitation.\u003c\/strong\u003e Choose the limited, intermediate, or unlimited limitation based on the intended value of individual projects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the applicant entity.\u003c\/strong\u003e Determine whether the license applicant will be an individual, LLC, corporation, partnership, or another eligible entity.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesignate a qualifier.\u003c\/strong\u003e Identify the individual who will satisfy the Roofing examination requirement for the applicant.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eUse the included Application Service.\u003c\/strong\u003e Organize the applicant, entity, ownership, qualifier, financial, and supporting information required for submission.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the licensing application.\u003c\/strong\u003e File the required materials with the North Carolina Licensing Board for General Contractors.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide evidence of financial responsibility.\u003c\/strong\u003e Meet the financial requirement associated with the selected license limitation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the background-check requirement.\u003c\/strong\u003e Provide or authorize the criminal background information required by the Board.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e The Board must approve the candidate before the PSI examination can be scheduled.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule the examination.\u003c\/strong\u003e Use the eligibility information to register and select an available testing appointment.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrepare the approved books.\u003c\/strong\u003e Confirm that each exam-room reference complies with current requirements for editions, binding, tabs, highlighting, and markings.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination.\u003c\/strong\u003e Follow all identification, calculator, security, scheduling, and reference-material rules.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete license issuance requirements.\u003c\/strong\u003e Passing the examination satisfies the testing component, but all remaining application requirements must be approved before the license is issued.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates the Roofing specialty classification. Applicants must complete the Board’s application process and satisfy the applicable entity, qualifier, financial, character, background, and examination requirements.\u003c\/p\u003e\n\u003cp\u003eA North Carolina general contractor license is required when a person or business bids on, contracts for, or undertakes a construction project valued at $40,000 or more, subject to the definitions and exceptions established by state law.\u003c\/p\u003e\n\u003cp\u003eThe Roofing specialty classification covers installation and repair of roofs and decks on residential, commercial, industrial, and institutional structures when the materials form a watertight and weather-resistant surface.\u003c\/p\u003e\n\u003cp\u003eThe classification includes roofing materials and components such as cedar, cement, clay tile, composition shingles, metal coverings, wood shakes, single-ply roofing, built-up roofing, protective and reflective coatings, sheet-metal valleys, flashings, gravel stops, gutters, downspouts, and bituminous waterproofing.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina general contractor licenses are issued with limited, intermediate, or unlimited limitations. Each limitation affects the permitted value of individual projects and carries separate financial qualification requirements.\u003c\/p\u003e\n\u003cp\u003eThe qualifier’s examination credential and the contractor license serve different purposes. Passing the Roofing examination does not independently authorize a person or company to bid, contract, or perform regulated work. The license must be issued to the legal entity conducting the contracting activity.\u003c\/p\u003e\n\u003cp\u003eLicensed roofing contractors must operate within the classification and limitation shown on the active license. They are also responsible for permits, inspections, employee supervision, workplace safety, contracts, code compliance, and maintaining accurate entity and qualifier information.\u003c\/p\u003e\n\u003cp\u003eApplication approval, examination eligibility, and license issuance are controlled by the North Carolina Licensing Board for General Contractors. Candidates should submit complete and accurate information and respond to any additional requirements related to the application.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers fall protection, ladders, scaffolds, roof openings, electrical hazards, personal protective equipment, material handling, hot work, fire prevention, and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Building Code: Building Code, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers roof assemblies, weather protection, roof coverings, structural requirements, fire classifications, drainage, insulation, flashing, reroofing, and general code provisions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers business organization, contracts, estimating, financial management, project administration, employment practices, insurance, safety, and risk management.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Administrative Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference addresses permits, construction documents, inspections, approvals, enforcement, code administration, and contractor responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: NRCA Roofing Manual: Steep Slope Roof Systems\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers asphalt shingles, wood roofing, tile, slate, roof decks, underlayments, flashing, ventilation, details, and steep-slope installation practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: NRCA Roofing Manual: Metal Panel and SPF Roof Systems\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference addresses metal-panel systems, clips, fasteners, seams, thermal movement, flashing, spray polyurethane foam roofing, protective coatings, repairs, and maintenance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: NRCA Roofing Manual: Membrane Roofing Systems\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers built-up roofing, modified bitumen, and single-ply systems, including substrates, insulation, attachment, seams, flashing, drainage, maintenance, and repairs.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Roofing Construction and Estimating, Daniel Atcheson, 1995\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers roof geometry, measurements, quantities, materials, estimating, flashing, drainage, installation procedures, and roofing construction practices. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Laws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers classifications, limitations, qualifiers, applications, licensing requirements, liens, enforcement, and contractor responsibilities. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for open-book questions involving roofing safety and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Building Code: Building Code, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for roofing assemblies, reroofing, weather protection, materials, drainage, and general building-code questions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for business, law, estimating, project management, insurance, and risk-control questions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Administrative Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for permits, inspections, approvals, administration, and code-enforcement questions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNRCA Roofing Manual: Steep Slope Roof Systems\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for technical questions involving steep-slope roofing materials, details, and installation.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNRCA Roofing Manual: Metal Panel and SPF Roof Systems\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for technical questions involving metal-panel and spray polyurethane foam roofing systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNRCA Roofing Manual: Membrane Roofing Systems\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for technical questions involving built-up, modified bitumen, and single-ply membrane systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBuild a study schedule around steep-slope roofing, roof substrates, membrane systems, metal panels, spray polyurethane foam, repairs, sheet metal, flashing, safety, business law, licensing, liens, and general building-code requirements.\u003c\/p\u003e\n\u003cp\u003eUse the seven exam-room references during timed lookup exercises. Read the question, identify the roofing system or business subject, choose the correct publication, locate the applicable section, and review the full requirement before selecting an answer.\u003c\/p\u003e\n\u003cp\u003eGive additional attention to steep-slope roofing because it represents the largest portion of the examination outline. Review deck preparation, underlayment, fastening, flashing, valleys, penetrations, ventilation, and material-specific installation requirements.\u003c\/p\u003e\n\u003cp\u003eStudy Roofing Construction and Estimating separately to reinforce roof geometry, quantities, labor considerations, material coverage, waste, and estimating methods. Review the laws and regulations book for licensing, liens, qualifiers, limitations, and contractor responsibilities.\u003c\/p\u003e\n\u003cp\u003ePractice calculations involving roof area, slope, material quantities, coverage, waste, labor, and project costs. Identify the units and assumptions required before completing each calculation.\u003c\/p\u003e\n\u003cp\u003eUse the one-year rental and course-access period to rotate among online lessons, live classes, technical reading, practice questions, calculations, and reference-navigation exercises.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Roofing Contractor candidates combine highlighted and tabbed rental books, an online trade course, live classes, and Application Service in one organized package.\u003c\/p\u003e\n\u003cp\u003eOrganized study guidance separates roofing preparation into steep-slope, membrane, metal-panel, spray polyurethane foam, substrate, repair, flashing, safety, building-code, business, licensing, and lien categories.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review helps candidates understand how roof decks, insulation, attachment methods, drainage, flashing, roof coverings, repairs, and safety practices work together as part of a complete roofing system.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation helps candidates identify the subject of an examination question, select the correct codebook or roofing manual, locate the applicable information, and apply it to a practical situation.\u003c\/p\u003e\n\u003cp\u003eReference-navigation practice focuses on the seven books permitted in the examination room. The highlighted and tabbed format supports organized study and faster access to major subjects during timed exercises.\u003c\/p\u003e\n\u003cp\u003eThe online course and live classes also support closed-book preparation for roofing estimating and North Carolina contractor laws. Application Service helps organize the administrative side of the examination and licensing process.\u003c\/p\u003e\n\u003cp\u003eNo package can guarantee examination passage, application approval, or license issuance. Results depend on the candidate’s qualifications, experience, preparation, participation, reference familiarity, and performance during the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in the Ultimate package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes nine highlighted and tabbed rental books, 1 year of online course access, live classes during the one-year access period, and Application Service.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $2,015, plus a $700 refundable rental-book deposit, for a total initial payment of $2,715.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhen is the $700 deposit refunded?\u003c\/h2\u003e\n\u003cp\u003eThe deposit is refunded when the books are returned in similar condition within 1 year from the time they are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the book rental period?\u003c\/h2\u003e\n\u003cp\u003eThe rental period is 1 year from the time the books are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 1 year of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre live classes included?\u003c\/h2\u003e\n\u003cp\u003eYes. Live classes are included during the one-year course-access period.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs Application Service included?\u003c\/h2\u003e\n\u003cp\u003eYes. Application Service is included with this Ultimate package.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does processing take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for the books to be highlighted, tabbed, and processed.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the rental books highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eYes. The included trade references are highlighted and tabbed to support organized study and efficient navigation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the North Carolina Roofing Contractor examination open book?\u003c\/h2\u003e\n\u003cp\u003eYes. Candidates may use the seven approved exam-room references when the materials comply with current testing requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich books are not allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eRoofing Construction and Estimating and Laws and Regulations Applicable to General Contracting in the State of North Carolina are included for study but are not allowed in the examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow many questions are on the examination?\u003c\/h2\u003e\n\u003cp\u003eThe examination contains 60 questions.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much time is allowed?\u003c\/h2\u003e\n\u003cp\u003eCandidates have 120 minutes to complete the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat score is required to pass?\u003c\/h2\u003e\n\u003cp\u003eA score of 70 percent is required to pass.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue a license?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing satisfies the examination requirement, but the applicant must complete all financial, entity, qualifier, application, and licensing requirements before a license is issued.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919388762165,"sku":null,"price":2720.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-69-NC-ROOFING-ULTIMATE.jpg?v=1787552488"},{"product_id":"north-carolina-metal-erection-contractor-ultimate-exam-prep-rental-package","title":"North Carolina Metal Erection Contractor Ultimate Exam Prep Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Metal Erection Contractor Ultimate Exam Prep Rental Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Metal Erection Contractor examination with a complete Ultimate rental package that combines highlighted and tabbed reference books, 1 year of online trade-course access, live classes, and Application Service. This package provides an organized preparation path for candidates studying structural steel erection, steel joists and girders, steel decking, reinforcing bars, welding, high-strength bolted connections, metal roofing and cladding, fencing, construction safety, contractor regulations, and business management.\u003c\/p\u003e\n\u003cp\u003eMetal erection work requires a combination of trade knowledge, safety awareness, reference-navigation skills, and practical judgment. Contractors may work with structural shapes, plates, tubing, pipe, steel joists, girders, decking, reinforcing steel, fabricated assemblies, stairs, rails, fences, roofing panels, cladding, and other architectural or structural metal components. Exam preparation should reflect the range of materials, connections, installation methods, and jobsite hazards involved in this specialty.\u003c\/p\u003e\n\u003cp\u003eThe rental library includes the North Carolina Occupational Safety and Health Standards for the Construction Industry with the latest available amendments and the Specification for Structural Joints Using ASTM A325 or A490 Bolts, 2004. These references support open-book preparation involving construction safety, steel erection, fall protection, structural stability, rigging, cranes, high-strength bolts, pretensioning, joint classifications, inspection, and connected materials.\u003c\/p\u003e\n\u003cp\u003eThe package also includes closed-book study references covering profiled metal roofing and cladding, reinforcing-bar placement, steel joists and joist girders, steel-deck construction, North Carolina contractor laws, business practices, welding, fences, and retaining walls. These books are important for preparation even though they are not allowed in the examination room.\u003c\/p\u003e\n\u003cp\u003eAll included rental books are highlighted and tabbed to support organized study. Permanent tabs help candidates identify major subjects, while highlighting draws attention to important sections, procedures, and terminology. Candidates should still read complete provisions and understand the surrounding context rather than relying only on marked passages.\u003c\/p\u003e\n\u003cp\u003eThe package includes 1 year of course access and live classes during the one-year access period. The online course and live instruction help candidates divide the exam into manageable subjects, strengthen trade knowledge, practice open-book navigation, and maintain a consistent study schedule.\u003c\/p\u003e\n\u003cp\u003eApplication Service is included with this Ultimate package. This service helps organize information and supporting materials for the North Carolina contractor examination and licensing application process. Final examination eligibility and contractor license approval remain under the authority of the appropriate North Carolina licensing agency.\u003c\/p\u003e\n\u003cp\u003eThe package price is $1,815, plus a $400 refundable rental-book deposit, for a total initial payment of $2,215. The $400 deposit is refunded when the books are returned in similar condition within 1 year from the time they are received. Please allow 15 business days for processing.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book(s):\u003c\/strong\u003e Ten highlighted and tabbed rental references listed below.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 1 year of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLive Classes:\u003c\/strong\u003e Included during the one-year course-access period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication Service:\u003c\/strong\u003e Included with this package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $1,815\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Rental-Book Deposit:\u003c\/strong\u003e $400\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Initial Payment:\u003c\/strong\u003e $2,215\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e The $400 deposit is refunded when the books are returned in similar condition within 1 year from the time they are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProcessing:\u003c\/strong\u003e Please allow 15 business days for processing.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Metal Erection Contractor examination evaluates knowledge associated with the fabrication, handling, assembly, erection, connection, alteration, and repair of structural and architectural metal components. Candidates should prepare for questions involving steel erection, joists, girders, steel decks, welding, bolting, reinforcing bars, metal roofing and siding, fencing, construction safety, laws, liens, and contractor responsibilities.\u003c\/p\u003e\n\u003cp\u003eSteel joists and joist girders are a major preparation area. Candidates should study proper storage, handling, lifting, placement, bearing, alignment, bridging, temporary stability, connections, field modifications, and erection sequencing. Joists and girders may remain unstable until required bridging and connections are completed, making safe sequencing an essential part of the work.\u003c\/p\u003e\n\u003cp\u003eSteel-deck preparation should include deck identification, storage, lifting, placement, alignment, attachment, side laps, openings, temporary loading, and coordination with structural framing. Candidates should understand the differences between roof deck and floor deck and recognize the importance of approved fastening and placement procedures.\u003c\/p\u003e\n\u003cp\u003eStructural bolting preparation should address ASTM A325 and A490 bolt assemblies, joint classifications, connected parts, faying surfaces, washers, installation methods, pretensioning, inspection, and the differences among snug-tightened, pretensioned, and slip-critical joints. Candidates should become familiar with the terminology and layout of the structural-joints specification.\u003c\/p\u003e\n\u003cp\u003eWelding preparation may include welding processes, equipment, electrodes, joint types, welding positions, symbols, cutting methods, base metals, inspection concepts, and safe work practices. Candidates should understand how welding is used to connect structural and miscellaneous metal components and how preparation, equipment, procedure, and workmanship affect a completed connection.\u003c\/p\u003e\n\u003cp\u003eAdditional preparation may involve reinforcing-bar identification and placement, profiled metal roofing and cladding, fence installation, North Carolina contractor regulations, liens, business management, contracts, estimating, project administration, safety, and risk management.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Metal Erection Contractor examination is an open-book test for the references identified as permitted in the examination room. This package includes the North Carolina Occupational Safety and Health Standards for the Construction Industry, with the latest available amendments, and the Specification for Structural Joints Using ASTM A325 or A490 Bolts, 2004, as the exam-room references.\u003c\/p\u003e\n\u003cp\u003eThe remaining books are included as closed-book study references and are not allowed in the examination room. Candidates should use them throughout the preparation period to learn the technical, regulatory, and business subjects associated with metal erection work.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing requires familiarity with each approved reference. Candidates should know which book applies to a question, where the relevant material is located, and how the publication is organized. Practice should include tables of contents, indexes, definitions, headings, tables, notes, and cross-references.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed format supports faster navigation, but the candidate must still identify the correct subject. A question involving steel-erection fall protection should direct the candidate to the safety standards, while a question involving pretensioned bolts should direct the candidate to the structural-joints specification.\u003c\/p\u003e\n\u003cp\u003eRead complete provisions before choosing an answer. Safety and structural-joint requirements may include conditions, exceptions, inspection criteria, definitions, or additional procedures that affect the correct response.\u003c\/p\u003e\n\u003cp\u003eAll exam-room materials must comply with current testing rules governing binding, tabs, highlighting, markings, inserts, loose pages, and book condition. Candidates should inspect the books before test day and follow the examination instructions provided with their eligibility information.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eConfirm the Metal Erection classification.\u003c\/strong\u003e Review the classification scope and determine whether it matches the structural and architectural metal work the applicant intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the appropriate license limitation.\u003c\/strong\u003e Choose the contractor license limitation that fits the intended size and scope of projects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the applicant entity.\u003c\/strong\u003e Determine whether the license will be held by an individual or an eligible business entity.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesignate a qualifier.\u003c\/strong\u003e Identify the individual who will satisfy the examination requirement for the Metal Erection classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eUse the included Application Service.\u003c\/strong\u003e Organize the applicant, qualifier, entity, financial, and supporting information needed for submission.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the licensing application.\u003c\/strong\u003e File the required materials through the applicable North Carolina contractor licensing process.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide required financial information.\u003c\/strong\u003e Submit the documentation required for the selected license limitation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e Complete the application review process and obtain authorization before scheduling the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule the exam.\u003c\/strong\u003e Follow the scheduling instructions provided with the examination authorization.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrepare the permitted references.\u003c\/strong\u003e Confirm that the exam-room books comply with the current rules for tabs, highlighting, binding, and markings.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination.\u003c\/strong\u003e Follow all identification, security, scheduling, and reference-material requirements.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the remaining licensing requirements.\u003c\/strong\u003e Passing the exam satisfies the testing component, but the full application must be approved before a contractor license is issued.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eNorth Carolina contractor licensing distinguishes between the examination credential held by a qualifier and the contractor license issued to an approved individual or business entity. Passing the Metal Erection examination does not by itself authorize a person or company to perform work that requires an active contractor license.\u003c\/p\u003e\n\u003cp\u003eThe applicant must select the proper classification and limitation, provide the required application information, identify an eligible qualifier, and satisfy applicable financial and administrative requirements. The legal entity entering into construction contracts should match the entity shown on the approved contractor license.\u003c\/p\u003e\n\u003cp\u003eA Metal Erection Contractor should operate within the work authorized by the classification and within the project limitation shown on the active license. Contractors are also responsible for permits, inspections, jobsite safety, contract obligations, employment requirements, and other laws affecting construction activity.\u003c\/p\u003e\n\u003cp\u003eChanges involving the licensed entity, business name, ownership, qualifier, or other material information should be handled through the applicable licensing process. Maintaining current entity records and an active license is an ongoing contractor responsibility.\u003c\/p\u003e\n\u003cp\u003eHolding a contractor license does not replace the obligation to comply with approved plans, specifications, safety standards, inspection requirements, and project contracts. Licensing, code compliance, and jobsite safety are separate but connected responsibilities.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers construction safety, steel erection, fall protection, cranes, rigging, material handling, welding and cutting, ladders, scaffolds, electrical hazards, personal protective equipment, and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Specification for Structural Joints Using ASTM A325 or A490 Bolts, 2004\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers high-strength structural bolting, joint classifications, bolt assemblies, connected materials, faying surfaces, washers, installation, pretensioning, inspection, and connection requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Profiled Sheet Roofing and Cladding - A Guide to Good Practice, 3rd Edition, 1999\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers profiled metal roofing and cladding, handling, storage, layout, installation, fasteners, laps, detailing, weather protection, and good construction practices. This book is not allowed in the exam room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Placing Reinforcing Bars\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference addresses reinforcing-bar identification, fabrication, handling, supports, tying, spacing, placement, splices, tolerances, and field practices. This book is not allowed in the exam room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Technical Digest No. 9 – Handling and Erection of Steel Joists and Joist Girders\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers joist and girder storage, lifting, placement, bearing, bridging, temporary stability, connections, field modifications, and erection procedures. This book is not allowed in the exam room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Laws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference addresses classifications, license limitations, qualifiers, applications, liens, professional responsibilities, enforcement, and North Carolina contractor requirements. This book is not allowed in the exam room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: SDI Manual of Construction with Steel Deck\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers steel-deck storage, handling, placement, alignment, attachment, side laps, openings, temporary loading, and construction practices. This book is not allowed in the exam room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference covers business organization, contracts, estimating, project management, financial practices, employment responsibilities, safety, risk management, and contractor administration. This book is not allowed in the exam room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Modern Welding, 2013\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental study reference supports preparation involving welding processes, equipment, electrodes, joint types, positions, symbols, cutting methods, metals, inspection concepts, and welding safety. This book is not allowed in the exam room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Fences \u0026amp; Retaining Walls, Used\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed used rental reference covers fence materials, posts, rails, gates, layouts, foundations, installation methods, and related construction practices. This book is not allowed in the exam room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference is included for open-book questions involving steel erection and general construction safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSpecification for Structural Joints Using ASTM A325 or A490 Bolts, 2004\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference is included for open-book questions involving high-strength bolted structural joints.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBegin preparation by dividing the material into major subjects: steel-erection safety, general construction safety, steel joists and girders, steel decks, reinforcing bars, welding, structural bolting, metal roofing and cladding, fencing, contractor regulations, liens, and business management.\u003c\/p\u003e\n\u003cp\u003eUse the two exam-room references during timed open-book practice. This creates a realistic study environment and helps candidates avoid depending on references that will not be available during the examination.\u003c\/p\u003e\n\u003cp\u003eStudy the restricted books separately and review their key concepts repeatedly. Build a schedule that rotates among online course lessons, live classes, technical reading, practice questions, and reference-navigation exercises.\u003c\/p\u003e\n\u003cp\u003eUse the tabs to locate major subjects and read highlighted material in context. Practice searching indexes for unfamiliar terminology and locating related provisions that may affect the answer.\u003c\/p\u003e\n\u003cp\u003eGive additional attention to joist and girder erection, steel-deck handling, structural bolting, welding, reinforcing steel, and OSHA steel-erection requirements. These subjects involve both technical knowledge and safe sequencing.\u003c\/p\u003e\n\u003cp\u003eThe included trade course and live classes are available during the one-year access period. Use that time to complete the course in stages, revisit difficult topics, and practice with the rental books before the return deadline.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Metal Erection Contractor candidates combine highlighted and tabbed rental books, an online trade course, live classes, and Application Service in one organized preparation package.\u003c\/p\u003e\n\u003cp\u003eOrganized study guidance separates the examination into steel joists and girders, reinforcing bars, steel decks, welding, bolting, roofing and cladding, fencing, safety, contractor regulations, liens, and business management.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review connects structural members, joists, decking, reinforcing steel, welded connections, bolted joints, roofing systems, and erection procedures as parts of complete metal construction projects.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation helps candidates identify the subject of a question, select the correct reference, locate the relevant provision, and apply the information to a practical situation.\u003c\/p\u003e\n\u003cp\u003eReference-navigation practice focuses on the safety standards and structural-joints specification permitted in the exam room. The highlighted and tabbed format supports faster access to major sections during study and timed practice.\u003c\/p\u003e\n\u003cp\u003eThe course and live classes organize closed-book preparation around the technical, licensing, and business references that candidates must study before test day. Application Service also helps organize the administrative side of the examination and licensing process.\u003c\/p\u003e\n\u003cp\u003eNo package can guarantee examination passage, application approval, or license issuance. Results depend on the candidate’s preparation, trade experience, participation, reference familiarity, and performance during the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in the Ultimate Exam Prep Rental Package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes ten highlighted and tabbed rental references, 1 year of course access, live classes during the one-year access period, and Application Service.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $1,815, plus a $400 refundable rental-book deposit, for a total initial payment of $2,215.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhen is the $400 deposit refunded?\u003c\/h2\u003e\n\u003cp\u003eThe deposit is refunded when the books are returned in similar condition within 1 year from the time they are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 1 year of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre live classes included?\u003c\/h2\u003e\n\u003cp\u003eYes. Live classes are included during the one-year course-access period.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs Application Service included?\u003c\/h2\u003e\n\u003cp\u003eYes. Application Service is included with this Ultimate package.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does processing take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for processing.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all rental books highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eYes. All included rental references are highlighted and tabbed to support organized preparation and navigation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich books are allowed in the exam room?\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Occupational Safety and Health Standards for the Construction Industry and the Specification for Structural Joints Using ASTM A325 or A490 Bolts, 2004, are included as exam-room references.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the other books allowed in the exam room?\u003c\/h2\u003e\n\u003cp\u003eNo. The roofing, reinforcing-bar, joist, steel-deck, welding, fencing, contractor-law, and business references are included for study but are not allowed in the examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the package include a used book?\u003c\/h2\u003e\n\u003cp\u003eYes. The included Fences \u0026amp; Retaining Walls reference is a used copy.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDo highlighting and tabs replace studying?\u003c\/h2\u003e\n\u003cp\u003eNo. Highlighting and tabs support navigation, but candidates must understand the subjects, read complete provisions, and practice using the references before exam day.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the exam automatically issue a contractor license?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing the exam satisfies the testing component, but the complete licensing application and all additional requirements must be approved before a license is issued.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this Ultimate package guarantee a passing score?\u003c\/h2\u003e\n\u003cp\u003eNo. Examination performance depends on the candidate’s preparation, trade experience, understanding of the material, reference-navigation skills, participation, and performance during the test.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919388991541,"sku":null,"price":2220.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-57-NC-METAL-ULTIMATE.jpg?v=1787552495"},{"product_id":"north-carolina-masonry-construction-contractor-ultimate-exam-prep-rental-package","title":"North Carolina Masonry Construction Contractor Ultimate Exam Prep Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Masonry Construction Contractor Ultimate Exam Prep Rental Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Masonry Construction Contractor examination with a complete Ultimate rental package that combines the approved exam references, an online trade course, live classes, and Application Service. This package is built for candidates who want an organized preparation path covering masonry materials, concrete block, brick construction, specialty masonry, mortar, grout, jobsite safety, building-code requirements, licensing rules, and open-book reference navigation.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Masonry Construction specialty classification covers work involving materials and systems commonly used throughout the masonry industry. Candidates must be prepared to answer questions about brick, concrete masonry units, structural masonry, stone, tile and block products, mortar and grout, reinforcement, anchorage, flashing, movement joints, fire-resistance requirements, construction tolerances, and safe jobsite practices.\u003c\/p\u003e\n\u003cp\u003eThis package includes the North Carolina Occupational Safety and Health Standards for the Construction Industry with the latest amendments, the 2018 North Carolina Building Code, ACI 530\/530.1 Building Code Requirements and Specification for Masonry Structures with Companion Commentaries, and the 2018 North Carolina Administrative Code and Policies. Together, these references support preparation for the principal safety, technical, structural, code, and administrative subjects associated with the examination.\u003c\/p\u003e\n\u003cp\u003eThe included online trade course provides 1 year of course access. Live classes are also included during the one-year access period, giving candidates an additional way to review difficult concepts, reinforce reference-navigation skills, and work through masonry-related topics in a structured learning environment.\u003c\/p\u003e\n\u003cp\u003eApplication Service is included with this Ultimate package. The service provides assistance organizing the information and documentation needed for the North Carolina general contractor examination and licensing application process. Examination eligibility and final license approval remain under the authority of the North Carolina Licensing Board for General Contractors.\u003c\/p\u003e\n\u003cp\u003eThe package price is $1,195, plus a $250 refundable rental-book deposit, for a total initial payment of $1,445. After the rental books are returned in similar condition within 1 year of rental, the $250 deposit is refunded. Please allow 15 business days for processing.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e North Carolina Occupational Safety and Health Standards for the Construction Industry, with latest amendments, rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e North Carolina Building Code: Building Code, 2018 Edition, rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e ACI 530\/530.1 – Building Code Requirements and Specification for Masonry Structures with Companion Commentaries, 2011 or 2013 Edition, rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e North Carolina Administrative Code and Policies, 2018 Edition, rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 1 year of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLive Classes:\u003c\/strong\u003e Included during the one-year course-access period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication Service:\u003c\/strong\u003e Included with this package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $1,195\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Rental-Book Deposit:\u003c\/strong\u003e $250\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Initial Payment:\u003c\/strong\u003e $1,445\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e The $250 deposit is refunded after the books are returned in similar condition within 1 year of rental.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProcessing:\u003c\/strong\u003e Please allow 15 business days.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Masonry Construction Contractor examination is administered by PSI for the North Carolina Licensing Board for General Contractors. Candidates must receive examination eligibility from the Board before scheduling the computer-based test.\u003c\/p\u003e\n\u003cp\u003eThe Masonry Construction examination contains 50 questions. Candidates must earn a score of at least 70 percent, and the testing time is 120 minutes. Because the examination covers several technical and regulatory areas, candidates should combine subject review with repeated practice locating information in the approved books.\u003c\/p\u003e\n\u003cp\u003eThe official examination content outline assigns questions to safety, concrete block, brick, specialty masonry, mortar and grout, laws and regulations, liens, and general building-code requirements. Concrete block and brick represent a substantial portion of the examination, while mortar and grout, safety, specialty materials, and regulatory subjects complete the test outline.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Masonry Construction specialty classification covers the installation, with or without mortar or adhesives, of materials and products common to the masonry industry. The classification includes brick, concrete block, gypsum partition tile, pumice block, lightweight masonry units, fire-clay products, refractory construction, rough-cut and dressed stone, marble panels, slate units, structural glazed tile or block, glass brick or block, and solar-screen tile or block.\u003c\/p\u003e\n\u003cp\u003eTechnical preparation should include masonry-unit properties, layout, bonding patterns, wall construction, anchorage, reinforcement, flashing, drainage, lintels, control joints, expansion joints, mortar selection, grout placement, curing, weather protection, structural requirements, and inspection considerations.\u003c\/p\u003e\n\u003cp\u003eCandidates should also review practical jobsite safety topics. These may involve fall protection, scaffolds, ladders, personal protective equipment, material handling, silica exposure, tools, electrical hazards, excavation conditions, housekeeping, lifting operations, and employer responsibilities under North Carolina occupational safety and health standards.\u003c\/p\u003e\n\u003cp\u003eBuilding-code preparation should focus on requirements that affect masonry assemblies, structural walls, fire-resistance-rated construction, means of protection, material standards, inspections, special inspections, structural design provisions, and the relationship between the North Carolina Building Code and referenced masonry standards.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Masonry Construction Contractor examination is an open-book test. Candidates are responsible for bringing the approved references to the examination center. The books must match the editions identified for the examination and comply with PSI rules for binding, markings, tabs, highlighting, and overall condition.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing does not eliminate the need for technical knowledge. Candidates have 120 minutes to answer 50 questions, which leaves limited time for searching unfamiliar books. The most effective preparation combines an understanding of masonry construction with regular practice using the indexes, tables of contents, chapter headings, tables, definitions, and cross-references in each publication.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Occupational Safety and Health Standards should be used for questions involving workplace hazards, employee protection, scaffolding, ladders, fall protection, personal protective equipment, tools, material handling, and construction-site safety responsibilities.\u003c\/p\u003e\n\u003cp\u003eThe 2018 North Carolina Building Code should be used for general building-code questions and requirements involving masonry construction, structural provisions, fire protection, life safety, special inspections, materials, building elements, and code compliance.\u003c\/p\u003e\n\u003cp\u003eACI 530\/530.1 is the primary structural masonry reference in the package. It addresses building-code requirements and construction specifications for masonry structures. Candidates should become familiar with provisions involving masonry materials, design requirements, reinforcement, anchorage, construction practices, quality assurance, inspection, tolerances, mortar, grout, and structural performance.\u003c\/p\u003e\n\u003cp\u003eThe 2018 North Carolina Administrative Code and Policies supports questions involving permits, inspections, approvals, code administration, enforcement, responsibilities, and procedures used within North Carolina’s construction-code system.\u003c\/p\u003e\n\u003cp\u003eReference materials may be highlighted, underlined, and indexed before the examination. Permanent tabs may be used when they comply with the testing rules. Candidates may not bring loose papers or unauthorized additions into the examination center. Downloaded code references must be complete and properly bound when permitted under the examination policy.\u003c\/p\u003e\n\u003cp\u003ePractice locating answers by subject rather than reading the books from beginning to end during the test. A question about scaffold access belongs in the safety standards, while a question about a reinforced masonry wall may require ACI 530\/530.1. A question about inspections or permits may lead to the Administrative Code and Policies, while a general structural or fire-resistance question may require the Building Code.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eConfirm the Masonry Construction classification.\u003c\/strong\u003e Review the classification scope and make sure it matches the masonry work the applicant intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the appropriate license limitation.\u003c\/strong\u003e North Carolina general contractor licenses are issued with financial limitations that affect the size of individual projects the licensee may undertake.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEstablish the applicant entity.\u003c\/strong\u003e Determine whether the applicant will operate as an individual, corporation, limited liability company, partnership, or another eligible legal entity.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesignate a qualifier.\u003c\/strong\u003e The qualifier is the individual who satisfies the examination requirement for the classification requested by the applicant.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the Board application.\u003c\/strong\u003e Submit the required application information to the North Carolina Licensing Board for General Contractors.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide financial documentation.\u003c\/strong\u003e Submit the financial information required for the selected license limitation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eUse the included Application Service.\u003c\/strong\u003e Organize the application information and supporting documentation needed for the Board’s review.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e After approval, the candidate receives the information needed to schedule the examination through PSI.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule and complete the examination.\u003c\/strong\u003e Follow PSI’s scheduling, identification, security, reference-material, and testing-center instructions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the licensing process.\u003c\/strong\u003e Passing the examination satisfies the qualifier’s testing requirement, but the applicant must complete all remaining Board requirements before a license is issued.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates general contracting classifications, specialty classifications, license limitations, qualifiers, applications, financial requirements, renewals, and professional conduct.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina requires a general contractor license when a contractor undertakes a construction project valued at $40,000 or more. The licensing requirement applies to the contractor who bids, contracts, or undertakes the project, subject to the definitions and exceptions established by state law.\u003c\/p\u003e\n\u003cp\u003eThe Masonry Construction specialty classification is intended for contractors performing the masonry work described in the Board’s classification rules. A contractor should operate only within the classification and limitation shown on the active license.\u003c\/p\u003e\n\u003cp\u003eThe legal entity that enters into contracts must hold the license. A qualifying examination credential held by an individual does not automatically authorize an unlicensed company to perform regulated work. The qualifier and the licensed entity must maintain the relationship required by the Board.\u003c\/p\u003e\n\u003cp\u003eApplicants must meet the financial requirement associated with the selected license limitation. The Board reviews the application, financial information, entity records, qualifier information, examination results, and required supporting documentation before issuing a license.\u003c\/p\u003e\n\u003cp\u003eBusiness registrations and legal entity records should remain current when applicable. Changes involving ownership, entity structure, qualifier status, or other material licensing information must be handled according to the Board’s current requirements.\u003c\/p\u003e\n\u003cp\u003ePassing the Masonry Construction examination does not by itself create an active contractor license. Final licensing depends on approval of the complete application and satisfaction of all applicable Board requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental reference addresses jobsite safety requirements for construction activities, including fall protection, scaffolds, ladders, personal protective equipment, tools, material handling, hazard communication, electrical safety, excavation, silica exposure, and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Building Code: Building Code, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental code establishes requirements for structural systems, masonry construction, building materials, fire protection, life safety, inspections, special inspections, occupancy-related provisions, and general building-code compliance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: ACI 530\/530.1 – Building Code Requirements and Specification for Masonry Structures with Companion Commentaries, 2011 or 2013 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental technical reference contains structural requirements and construction specifications for masonry systems, including materials, reinforcement, anchorage, design, workmanship, quality assurance, inspection, mortar, grout, and construction tolerances.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Administrative Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental reference covers construction-code administration, permits, inspections, approvals, enforcement procedures, responsibilities, interpretations, and statewide regulatory policies.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference is approved for use during the open-book Masonry Construction examination when prepared according to current PSI rules.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Building Code: Building Code, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis is an approved exam-room reference for general building-code and masonry-related requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eACI 530\/530.1 – Building Code Requirements and Specification for Masonry Structures with Companion Commentaries, 2011 or 2013 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis is an approved technical reference for structural masonry requirements and construction specifications.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Administrative Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference is approved for questions involving code administration, permits, inspections, approvals, and enforcement procedures.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eStart by dividing preparation according to the official content areas: safety, concrete block, brick, specialty masonry, mortar and grout, laws and regulations, liens, and general building-code requirements. Spend additional study time on concrete block and brick because those areas represent a large portion of the examination.\u003c\/p\u003e\n\u003cp\u003eFor block and brick questions, review dimensions, coursing, bonding, wall types, reinforcement, ties, anchors, lintels, flashing, weeps, movement joints, bearing, installation tolerances, and weather protection. Connect each construction practice to the applicable code or specification requirement.\u003c\/p\u003e\n\u003cp\u003eStudy mortar and grout as separate materials. Review mortar types, mixing, proportioning, placement, workability, joint finishing, grout selection, consolidation, lift requirements, reinforcement interaction, and temperature-related precautions.\u003c\/p\u003e\n\u003cp\u003eUse timed lookup exercises throughout the one-year course-access period. Read a practice question, identify the subject, choose the correct book, locate the applicable section, and review the surrounding provisions. This process builds both knowledge and navigation speed.\u003c\/p\u003e\n\u003cp\u003eUse live classes to reinforce technical subjects and clarify how the references work together. Combine class participation with individual reading, practice questions, reference searches, and regular review of safety and administrative topics.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Masonry Construction Contractor candidates combine rental books, structured online study, live classes, and Application Service in one preparation package.\u003c\/p\u003e\n\u003cp\u003eOrganized study guidance divides the examination into manageable subjects, including concrete block, brick, structural masonry, mortar, grout, specialty materials, jobsite safety, building-code requirements, and administrative procedures.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review helps candidates connect masonry materials and methods to complete wall and structural systems. Candidates can study how units, mortar, grout, reinforcement, anchors, flashing, joints, and code requirements work together.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation emphasizes the skills needed for an open-book examination. Candidates learn to identify the correct reference, locate a code section or specification, read exceptions and related provisions, and confirm answers within the available testing time.\u003c\/p\u003e\n\u003cp\u003eReference-navigation practice helps candidates become familiar with the organization of the Building Code, ACI 530\/530.1, the safety standards, and the Administrative Code and Policies. Live classes provide additional opportunities to reinforce technical concepts throughout the one-year access period.\u003c\/p\u003e\n\u003cp\u003eApplication Service supports the administrative side of the licensing process by helping candidates organize application information and supporting documents. No package can guarantee examination passage, application approval, or license issuance, but consistent preparation can help candidates approach the process with stronger knowledge and a clearer plan.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in the Ultimate Exam Prep Rental Package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes four rental references, 1 year of course access, live classes during the one-year access period, and Application Service.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $1,195, plus a $250 refundable rental-book deposit, for a total initial payment of $1,445.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhen is the $250 deposit refunded?\u003c\/h2\u003e\n\u003cp\u003eThe deposit is refunded after the books are returned in similar condition within 1 year of rental.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 1 year of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre live classes included?\u003c\/h2\u003e\n\u003cp\u003eYes. Live classes are included during the one-year course-access period.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs Application Service included?\u003c\/h2\u003e\n\u003cp\u003eYes. Application Service is included with this Ultimate package.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does processing take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for processing.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the North Carolina Masonry Construction examination open book?\u003c\/h2\u003e\n\u003cp\u003eYes. Candidates may use the approved references during the examination when the materials comply with current PSI requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow many questions are on the examination?\u003c\/h2\u003e\n\u003cp\u003eThe examination contains 50 questions and allows 120 minutes for completion.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat score is required to pass?\u003c\/h2\u003e\n\u003cp\u003eCandidates must earn a score of at least 70 percent.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all four rental books allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eYes. The listed safety standards, 2018 Building Code, ACI 530\/530.1, and 2018 Administrative Code and Policies are approved references for the open-book examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue the license?\u003c\/h2\u003e\n\u003cp\u003eNo. The applicant must complete the Board’s application, financial, entity, qualifier, and licensing requirements before a license is issued.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this package guarantee a passing score?\u003c\/h2\u003e\n\u003cp\u003eNo. Examination performance depends on the candidate’s preparation, trade knowledge, reference-navigation skills, participation, and performance during the test.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919389057077,"sku":null,"price":1450.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-51-NC-MASONRY-ULTIMATE.jpg?v=1787552498"},{"product_id":"north-carolina-building-contractor-ultimate-exam-prep-rental-package","title":"North Carolina Building Contractor Ultimate Exam Prep Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Building Contractor Ultimate Exam Prep Rental Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Building Contractor examination with an all-inclusive rental package combining professionally highlighted and tabbed reference books, an online trade exam prep course, live classes, and Application Service.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Building Contractor Ultimate Exam Prep Rental Package is designed for candidates who want a structured approach to technical study, open-book reference navigation, examination preparation, and licensing application support. The package includes the eight references identified for use in the examination room, twelve additional study books, 1 year of course access, and live instructional support.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Building Contractor classification covers a broad range of commercial, industrial, institutional, and residential construction and demolition work. Candidates may need to understand building-code requirements, structural concrete, masonry, accessibility, construction safety, contractor business practices, project management, code administration, sports-field construction, roofing, carpentry, excavation, steel systems, erosion control, and related construction methods.\u003c\/p\u003e\n\u003cp\u003eEvery rental book in this package is professionally highlighted and tabbed. Selected definitions, code provisions, tables, formulas, diagrams, procedures, administrative requirements, and business concepts are highlighted to support focused review. Permanently attached tabs identify major chapters, standards, sections, and frequently reviewed examination topics.\u003c\/p\u003e\n\u003cp\u003eThe included trade course helps candidates divide the reference library into manageable study areas. Live classes provide instructor-led review that can be combined with self-paced lessons, technical reading, calculation practice, and timed open-book exercises.\u003c\/p\u003e\n\u003cp\u003eThe package also includes Application Service. This service provides organized assistance with the North Carolina contractor licensing application process, including support with the forms and documentation associated with the selected licensing pathway.\u003c\/p\u003e\n\u003cp\u003eThe physical books are provided as rentals for one year. A $1,250 refundable deposit is added to the package price. The deposit is returned when the complete rental-book set is received back in similar condition within one year of the rental period.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book(s):\u003c\/strong\u003e The complete highlighted and tabbed North Carolina Building Contractor rental library listed below.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 1 year of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTrade Exam Prep Course:\u003c\/strong\u003e Online preparation covering building codes, structural concrete, masonry, accessibility, construction safety, business concepts, code administration, and reference navigation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLive Classes:\u003c\/strong\u003e Instructor-led exam preparation is included.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication Service:\u003c\/strong\u003e Included with this package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eExam-Room Reference Rentals:\u003c\/strong\u003e Eight highlighted and tabbed books identified for use during the North Carolina Building Contractor examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eAdditional Study Book Rentals:\u003c\/strong\u003e Twelve highlighted and tabbed technical and regulatory references used for broader preparation outside the examination room.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eOpen-Book Navigation Support:\u003c\/strong\u003e Practice-oriented preparation designed to improve book selection, lookup speed, and interpretation of technical requirements.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $2,565\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eRefundable Book Deposit:\u003c\/strong\u003e $1,250\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eTotal Due at Purchase:\u003c\/strong\u003e $3,815\u003c\/p\u003e\n\u003cp style=\"margin-bottom: 0;\"\u003e\u003cstrong\u003eDeposit Terms:\u003c\/strong\u003e The $1,250 deposit is refundable when the complete rental-book set is returned in similar condition within one year of the rental period.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cp\u003eThe one-year rental period gives candidates time to work through the large reference library, participate in live classes, complete course lessons, practice calculations, and prepare for the licensing process. Books should be protected from additional writing, moisture, torn pages, missing materials, loose inserts, or unauthorized alterations.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003ePlease allow an additional 15 business days for highlighted and tabbed trade book package orders.\u003c\/strong\u003e\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Building Contractor examination evaluates knowledge across building construction, structural systems, accessibility, contractor business practices, workplace safety, code administration, and project management.\u003c\/p\u003e\n\u003cp\u003eBuilding-code preparation may include occupancy classifications, construction types, allowable building height and area, fire-resistance ratings, fire walls, fire barriers, fire-protection systems, interior finishes, means of egress, exterior walls, roof assemblies, structural provisions, special inspections, and safeguards during construction.\u003c\/p\u003e\n\u003cp\u003eMany building-code questions require candidates to use more than one section. A question involving allowable building size may require review of occupancy, construction type, sprinkler conditions, frontage provisions, mixed-use requirements, and applicable table notes.\u003c\/p\u003e\n\u003cp\u003eStructural concrete preparation may include materials, reinforcement, concrete cover, development length, splices, slabs, beams, columns, walls, footings, foundations, durability, strength, inspections, and construction requirements.\u003c\/p\u003e\n\u003cp\u003eMasonry preparation may include masonry units, mortar, grout, reinforcement, anchors, ties, walls, columns, bearing, quality assurance, construction tolerances, inspections, and structural requirements.\u003c\/p\u003e\n\u003cp\u003eAccessibility preparation may involve accessible routes, entrances, doors, maneuvering clearances, ramps, stairs, elevators, platform lifts, toilet rooms, bathing facilities, parking, seating, reach ranges, operable parts, signage, and communication features.\u003c\/p\u003e\n\u003cp\u003eConstruction-safety preparation may cover personal protective equipment, fall protection, ladders, scaffolds, excavation, cranes, material handling, electrical hazards, tools, fire prevention, housekeeping, and employer responsibilities.\u003c\/p\u003e\n\u003cp\u003eBusiness and project-management preparation may address licensing, business organization, accounting, financial statements, contracts, estimating, bidding, scheduling, insurance, employment practices, safety programs, liens, project documentation, and risk management.\u003c\/p\u003e\n\u003cp\u003eCode-administration preparation may include permits, plan review, inspections, certificates of occupancy, alternate materials, violations, stop-work orders, enforcement procedures, and the responsibilities of contractors, design professionals, and building officials.\u003c\/p\u003e\n\u003cp\u003eSports-field preparation may involve site evaluation, grading, drainage, irrigation, soil preparation, natural turf, synthetic surfaces, field layout, construction, renovation, equipment, and maintenance.\u003c\/p\u003e\n\u003cp\u003eThe supplemental study references expand preparation into carpentry, roofing, excavation, concrete mixtures, post-tensioning, modern masonry methods, utility safety, sedimentation control, contractor regulations, steel joist erection, and steel-deck construction.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Building Contractor examination is open book. Candidates may use authorized references that comply with current testing-center requirements.\u003c\/p\u003e\n\u003cp\u003eThe eight approved exam-room references in this package are professionally highlighted and tabbed to support navigation. Candidates should learn which book applies to each subject and practice locating information without depending entirely on the tabs.\u003c\/p\u003e\n\u003cp\u003eUse the North Carolina Building Code for general building requirements, occupancy classifications, construction types, building height and area, fire protection, means of egress, exterior walls, roofing, structural provisions, and safeguards during construction.\u003c\/p\u003e\n\u003cp\u003eUse ACI 318 for structural concrete questions and ACI 530\/530.1 for masonry questions. Use ICC A117.1 for accessibility requirements and the North Carolina Administration Code and Policies for permits, inspections, enforcement, and administrative procedures.\u003c\/p\u003e\n\u003cp\u003eUse the North Carolina Occupational Safety and Health Standards for workplace-safety questions. Use the contractor business guide for licensing, accounting, contracts, estimating, project management, insurance, liens, and contractor responsibilities. Use the sports-fields reference for athletic-facility planning, construction, drainage, turf, and maintenance.\u003c\/p\u003e\n\u003cp\u003eHighlighted passages should be read in context. The correct answer may depend on a nearby exception, definition, table note, diagram, commentary provision, or cross-reference.\u003c\/p\u003e\n\u003cp\u003eThe twelve additional study books are included to build broader construction knowledge, but they are not identified as references allowed into the examination room. Final exam simulations should be completed using only the eight approved references.\u003c\/p\u003e\n\u003cp\u003eCandidates should review current examination rules regarding highlighting, underlining, tabs, notes, loose papers, inserted materials, and binding before taking any references to the testing center.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eReview the Building Contractor classification.\u003c\/strong\u003e Confirm that the classification matches the construction and demolition work the business plans to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the appropriate license limitation.\u003c\/strong\u003e Choose the monetary limitation that fits the value of projects the business intends to undertake.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the qualifier.\u003c\/strong\u003e Select the individual who will satisfy the examination requirement for the applicant business.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrepare the application.\u003c\/strong\u003e Use the included Application Service to organize the required applicant, business, financial, ownership, and qualifier information.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e Complete the applicable approval process before scheduling the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBegin the trade course.\u003c\/strong\u003e Use the online lessons to organize building code, concrete, masonry, accessibility, safety, business, administration, and sports-field subjects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eAttend live classes.\u003c\/strong\u003e Combine instructor-led review with self-paced study and reference practice.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStudy the complete rental library.\u003c\/strong\u003e Use the supplemental books to strengthen practical construction knowledge.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete timed open-book drills.\u003c\/strong\u003e Practice using only the eight exam-room-approved references during final simulations.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule and take the examination.\u003c\/strong\u003e Follow current candidate and testing-center requirements.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the licensing process.\u003c\/strong\u003e Satisfy the applicable financial, qualifier, organizational, classification, and limitation requirements.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReturn the rental books.\u003c\/strong\u003e Return the complete set in similar condition within one year to qualify for the refundable deposit.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates the Building Contractor classification. The classification covers commercial, industrial, institutional, and residential building construction and demolition.\u003c\/p\u003e\n\u003cp\u003eThe scope also includes associated sitework, parking decks, grading, paving, sidewalks, gutters, storm drainage, retaining walls, accessory structures, recreational facilities, athletic fields, running tracks, bleachers, and seating.\u003c\/p\u003e\n\u003cp\u003eThe applicant business must hold a classification that covers the work and a monetary limitation appropriate for the projects it intends to undertake.\u003c\/p\u003e\n\u003cp\u003eThe business must identify a qualifier who satisfies the applicable examination requirement. The applicant must also provide the financial, organizational, ownership, and business documentation required for the requested license.\u003c\/p\u003e\n\u003cp\u003ePassing the examination does not automatically issue a contractor license. The applicant must complete the licensing process and satisfy the requirements associated with the chosen classification and limitation.\u003c\/p\u003e\n\u003cp\u003eA contractor license does not replace project-specific permits, inspections, engineering services, architectural services, accessibility requirements, environmental approvals, erosion-control obligations, or workplace-safety responsibilities.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Sports Fields: Design, Construction and Maintenance, 2nd Edition, 2010\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA technical reference covering athletic-field planning, grading, drainage, irrigation, soil preparation, natural turf, synthetic surfaces, construction, renovation, and maintenance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA construction-safety reference covering personal protective equipment, fall protection, scaffolds, ladders, excavation, cranes, electrical hazards, tools, material handling, and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contractor reference covering licensing, accounting, financial management, contracts, estimating, bidding, scheduling, insurance, employment, safety, liens, and project administration.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Building Code: Building Code, 2018\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe primary building-code reference covering occupancy classifications, construction types, building height and area, fire protection, means of egress, structural requirements, exterior walls, roofing, and construction safeguards.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: ACI 530\/530.1-13, Building Code Requirements and Specification for Masonry Structures and Companion Commentaries\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA masonry reference covering materials, reinforcement, design requirements, construction, inspections, quality assurance, specifications, and commentary.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: ACI 318-14, Building Code Requirements for Structural Concrete and Commentary\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA structural concrete reference covering reinforcement, slabs, beams, columns, walls, foundations, durability, strength, development, splices, inspections, and construction requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Administration Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAn administrative reference covering permits, plan review, inspections, certificates of occupancy, enforcement, alternate materials, violations, and code procedures.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: ICC A117.1-2017, Standard for Accessible and Usable Buildings and Facilities\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAn accessibility standard covering routes, entrances, doors, ramps, stairs, elevators, toilet rooms, parking, seating, reach ranges, clearances, signage, and communication features.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAdditional Study Books Not Allowed into the Exam\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Technical Digest No. 9 – Handling and Erection of Steel Joists and Joist Girders\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA guide covering delivery, storage, bridging, erection, stability, sequencing, connections, and safety for steel joists and joist girders.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Carpentry and Building Construction, 2016\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA construction reference covering foundations, framing, floors, walls, roofs, stairs, doors, windows, finishes, tools, plans, and general building methods.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Design and Control of Concrete Mixtures, 17th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA concrete reference covering materials, proportioning, strength, durability, placement, consolidation, curing, testing, and quality control.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Pipe and Excavation Contracting\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA field reference covering excavation, trenching, pipe installation, dewatering, bedding, backfill, compaction, equipment, estimating, and safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Roofing Construction and Estimating, Daniel Atcheson, 1995\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA roofing reference covering systems, materials, installation, flashing, ventilation, repair, measurements, labor, estimating, and project planning.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Training and Certification of Field Personnel for Unbonded Post-Tensioning - Level 1 Field Fundamentals\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA field reference covering post-tensioning components, tendon installation, stressing, safety, inspection, handling, repairs, and quality control.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Modern Masonry: Brick, Block, Stone, Clois E. Kicklighter, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA masonry reference covering tools, materials, mortar, brick, concrete block, stone, layout, bonding, reinforcement, walls, and field techniques.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Excavation Safety Guidelines, 2022 or Later\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA practical guide covering utility-location procedures, markings, tolerance zones, safe digging, damage prevention, emergency response, and excavator responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina Administrative Code, Title 15A, Chapter 4, Sedimentation Control, Including Latest Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAdministrative rules covering land-disturbing activities, erosion-control plans, stabilization, inspections, enforcement, and sedimentation-control responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: North Carolina General Statutes Chapter 113A, Article 4, Sedimentation Pollution Control Act of 1973\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eState law establishing erosion and sedimentation-control responsibilities, planning requirements, enforcement authority, and pollution-prevention obligations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Laws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contractor law reference covering licensing statutes, Board rules, classifications, limitations, qualifier responsibilities, applications, renewals, and disciplinary provisions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: SDI Manual of Construction with Steel Deck\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Steel Deck Institute reference covering steel-deck products, handling, storage, erection, attachment, openings, accessories, tolerances, and safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBegin preparation by separating the exam-room references from the supplemental books. Use the complete library to build construction knowledge, then complete final timed exercises using only the eight approved references.\u003c\/p\u003e\n\u003cp\u003eStudy the North Carolina Building Code by practicing occupancy, construction type, height and area, fire-resistance requirements, means of egress, exterior walls, roofing, structural provisions, and construction safeguards.\u003c\/p\u003e\n\u003cp\u003eUse ACI 318 and ACI 530\/530.1 for structural study. Practice identifying which reference controls the question before beginning a lookup.\u003c\/p\u003e\n\u003cp\u003eUse ICC A117.1 for accessibility preparation. Work directly with diagrams and dimensions involving routes, doors, ramps, parking, toilet rooms, seating, reach ranges, and maneuvering clearances.\u003c\/p\u003e\n\u003cp\u003eUse the additional study books for practical review of carpentry, roofing, concrete mixtures, masonry installation, excavation, post-tensioning, steel joists, steel deck, utility safety, and erosion control.\u003c\/p\u003e\n\u003cp\u003eCombine live classes with course lessons, technical reading, calculation practice, mixed-reference drills, and review of missed questions. Protect every rental book and return the full set within the one-year rental period.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Building Contractor candidates organize a large technical and business reference library into a structured preparation plan.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review connects the North Carolina Building Code with structural concrete, masonry, accessibility, construction safety, roofing, carpentry, excavation, steel systems, sports fields, and code administration.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation encourages candidates to review course lessons, answer questions, locate supporting provisions, examine missed concepts, and repeat difficult searches.\u003c\/p\u003e\n\u003cp\u003eProfessional highlighting helps selected information stand out, while permanent tabs support navigation to major chapters and commonly reviewed subjects. Live classes add instructor-led support to the self-paced preparation process.\u003c\/p\u003e\n\u003cp\u003eApplication Service helps candidates organize the licensing paperwork and supporting information associated with their selected application pathway.\u003c\/p\u003e\n\u003cp\u003eNo package can guarantee a passing score, contractor license, permit, or business outcome. Results depend on the candidate’s preparation, construction experience, financial qualifications, reference-navigation skills, application completion, and examination performance.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFAQ Section\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in the Ultimate package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes eight exam-room-approved rental books, twelve supplemental study books, professional highlighting and tabbing, the online trade course, live classes, 1 year of course access, and Application Service.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is the total amount due at purchase?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $2,565, and the refundable book deposit is $1,250. The total due at purchase is $3,815.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the $1,250 deposit refundable?\u003c\/h2\u003e\n\u003cp\u003eYes. The deposit is refundable when the complete rental-book set is returned in similar condition within one year of the rental period.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 1 year of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre live classes included?\u003c\/h2\u003e\n\u003cp\u003eYes. Live instructor-led classes are included with the Ultimate package.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs Application Service included?\u003c\/h2\u003e\n\u003cp\u003eYes. Application Service is included to support organization of the North Carolina contractor licensing application process.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all books highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eYes. The exam-room-approved references and supplemental study books are professionally highlighted and tabbed.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all books allowed into the examination room?\u003c\/h2\u003e\n\u003cp\u003eNo. Only the eight books listed in the Exam Room Approved Books section are identified for use during the examination. The remaining books are included for study.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the examination open book?\u003c\/h2\u003e\n\u003cp\u003eYes. Candidates may use authorized references that comply with current testing-center requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan I add notes to the rental books?\u003c\/h2\u003e\n\u003cp\u003eThe books should be protected from additional writing, loose materials, missing pages, moisture, damage, or unauthorized alterations. They must be returned in similar condition to qualify for the deposit refund.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this package guarantee a passing score or contractor license?\u003c\/h2\u003e\n\u003cp\u003eNo. Examination and licensing outcomes depend on the candidate’s preparation, construction knowledge, financial qualifications, supporting documentation, reference-navigation ability, and performance during the examination and application processes.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAre you ready for the SEO metadata?\u003c\/strong\u003e\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919389155381,"sku":null,"price":3820.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-45-NC-BUILDING-ULTIMATE.jpg?v=1787552503"},{"product_id":"north-carolina-unlimited-electrical-contractor-ultimate-exam-prep-rental-package","title":"North Carolina Unlimited Electrical Contractor Ultimate Exam Prep Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Unlimited Electrical Contractor Ultimate Exam Prep Rental Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Unlimited Electrical Contractor examination with an Ultimate rental package that combines highlighted and tabbed reference books, a comprehensive online electrical contractor exam prep course, live classes, extended course access, and Application Service.\u003c\/p\u003e\n\u003cp\u003eThis package is designed for experienced electrical professionals preparing for North Carolina’s broadest regular electrical contractor classification. The Unlimited license permits a properly licensed contractor to perform electrical contracting projects without a project-value limitation, subject to applicable licensing laws, electrical codes, permits, inspections, safety requirements, financial responsibility standards, and professional obligations.\u003c\/p\u003e\n\u003cp\u003eThe package includes highlighted and tabbed rental copies of the National Electrical Code, NEC, 2020 Edition, and NFPA 72, National Fire Alarm and Signaling Code, 2019 Edition. These technical references support preparation involving services, feeders, branch circuits, motors, transformers, generators, grounding, bonding, conductor sizing, overcurrent protection, emergency systems, fire alarm systems, calculations, electrical plans, inspection, testing, and system documentation.\u003c\/p\u003e\n\u003cp\u003eThe package also includes highlighted and tabbed rental copies of the Electrical Contractors Licensing Law, the Board’s Rules for the Implementation of the Electrical Contractors Licensing Law, and the NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition. These references support closed-book preparation involving licensing qualifications, listed qualified individual responsibilities, contracts, estimating, bidding, financial management, scheduling, safety, insurance, employment practices, recordkeeping, and project administration.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Electrical Contractor trade online exam prep course provides structured preparation across technical, calculation, plan-reading, licensing, and business subjects. Live classes add guided instruction and help candidates work through important Code concepts, calculations, exam topics, and licensing responsibilities in an organized setting.\u003c\/p\u003e\n\u003cp\u003eThis Ultimate package includes \u003cstrong\u003e1 year of course access\u003c\/strong\u003e and a one-year book rental period beginning when the rental books are received. The extended access period gives candidates time to work through technical subjects, revisit difficult calculations, practice reference navigation, attend live classes, and develop a consistent study schedule.\u003c\/p\u003e\n\u003cp\u003eApplication Service is included with this package. This service supports candidates as they organize and prepare the information needed for the North Carolina electrical contractor application process. Final approval, examination authorization, and license issuance remain under the authority of the North Carolina State Board of Examiners of Electrical Contractors.\u003c\/p\u003e\n\u003cp\u003ePlease allow 15 business days for the trade reference books to be highlighted and tabbed before shipment. This preparation period allows the books to be organized for efficient study and reference navigation.\u003c\/p\u003e\n\u003cp\u003eThe package price is $1,315, plus a $400 refundable book deposit, for a total of $1,715. The $400 deposit is refundable when the rental books are returned in similar condition within one year from the date they are received.\u003c\/p\u003e\n\u003cp\u003eHighlighted and tabbed books can help candidates move more efficiently through major NEC articles, NFPA 72 chapters, tables, definitions, exceptions, licensing topics, and business subjects. Candidates should still read complete provisions, understand how requirements interact, practice calculations, and develop the ability to apply Code rules to real electrical installations.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e National Electrical Code, NEC, 2020 Edition, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e NFPA 72 - National Fire Alarm and Signaling Code, 2019 Edition, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e Electrical Contractors Licensing Law, General Statutes Chapter 87, Article 4, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e The Board’s Rules for the Implementation of the Electrical Contractors Licensing Law, Title 21, North Carolina Administrative Code, Chapter 18B, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition, highlighted and tabbed rental copy.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eOnline Course:\u003c\/strong\u003e North Carolina Electrical Contractor trade online exam prep course.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLive Classes:\u003c\/strong\u003e Guided live class preparation is included.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 1 year of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Rental Period:\u003c\/strong\u003e One year from the date the books are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication Service:\u003c\/strong\u003e Included with this package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Preparation:\u003c\/strong\u003e Please allow 15 business days for the books to be highlighted and tabbed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $1,315.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Book Deposit:\u003c\/strong\u003e $400.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Due:\u003c\/strong\u003e $1,715.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e The $400 deposit is refundable when the books are returned in similar condition within one year from the date they are received.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Unlimited Electrical Contractor examination contains 100 multiple-choice questions. Candidates have a maximum of six hours to complete the examination, and a minimum score of 70 percent is required to pass.\u003c\/p\u003e\n\u003cp\u003eThe examination is administered after the North Carolina State Board of Examiners of Electrical Contractors approves the applicant. Approved candidates receive examination authorization and scheduling instructions for the testing provider.\u003c\/p\u003e\n\u003cp\u003eThe Unlimited examination evaluates the technical, supervisory, calculation, plan-reading, licensing, and business knowledge needed to direct electrical contracting projects without a project-value limitation.\u003c\/p\u003e\n\u003cp\u003eService and feeder preparation may include dwelling and commercial load calculations, service conductor sizing, service equipment, service disconnects, grounded conductors, grounding electrode conductors, parallel conductors, feeder demand factors, transformer secondaries, voltage drop, and protection of conductors and equipment.\u003c\/p\u003e\n\u003cp\u003eBranch-circuit preparation should include conductor ampacity, continuous and noncontinuous loads, lighting loads, receptacle loads, appliance circuits, multiwire branch circuits, overcurrent protection, conductor identification, voltage limitations, and requirements applying to particular occupancies or equipment.\u003c\/p\u003e\n\u003cp\u003eMotor preparation may involve full-load current, conductor sizing, feeder sizing, overload protection, short-circuit and ground-fault protection, controllers, disconnecting means, duty ratings, multimotor installations, and proper use of NEC motor tables.\u003c\/p\u003e\n\u003cp\u003eTransformer preparation may include primary and secondary conductor sizing, overcurrent protection, separately derived systems, grounding and bonding, secondary-system calculations, ventilation, clearances, vault requirements, and transformer installations within buildings.\u003c\/p\u003e\n\u003cp\u003eGrounding and bonding preparation should include grounding electrode systems, service bonding, separately derived systems, equipment grounding conductors, bonding jumpers, structural metal, metal piping, raceway bonding, objectionable current, and effective ground-fault current paths.\u003c\/p\u003e\n\u003cp\u003eRaceway and conductor questions may address conduit fill, conductor adjustment, ambient-temperature correction, terminal limitations, conductor insulation, support, bends, cable trays, underground installations, wet locations, physical protection, pull boxes, junction boxes, and conductor-pulling requirements.\u003c\/p\u003e\n\u003cp\u003eOvercurrent-protection preparation may include standard fuse and circuit-breaker ratings, tap conductors, transformer protection, motor circuits, conductor protection, selective coordination, interrupting ratings, series ratings, equipment protection, and permitted exceptions.\u003c\/p\u003e\n\u003cp\u003eSpecial-system preparation may involve emergency systems, legally required standby systems, optional standby systems, generators, fire pumps, healthcare facilities, hazardous locations, marinas, swimming pools, photovoltaic systems, energy storage systems, and electric vehicle charging equipment.\u003c\/p\u003e\n\u003cp\u003eFire alarm preparation may include fire alarm control units, initiating devices, notification appliances, supervising stations, emergency communications, signaling line circuits, notification appliance circuits, system power supplies, batteries, inspection, testing, maintenance, and documentation.\u003c\/p\u003e\n\u003cp\u003eElectrical plan questions may require candidates to interpret lighting plans, power plans, riser diagrams, one-line diagrams, panel schedules, feeder routes, conductor callouts, motor connections, symbols, equipment ratings, specifications, and installation notes.\u003c\/p\u003e\n\u003cp\u003eBusiness and law preparation may involve contracts, estimating, bidding, project scheduling, financial controls, employment practices, insurance, safety programs, permits, inspections, recordkeeping, license use, supervision, and listed qualified individual responsibilities.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Unlimited Electrical Contractor examination is an open-book test. Candidates may use the 2020 National Electrical Code and NFPA 72, National Fire Alarm and Signaling Code, 2019 Edition, as the technical exam-room references included in this Ultimate rental package.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed 2020 NEC supports questions involving electrical installations, services, feeders, branch circuits, motors, transformers, generators, grounding, bonding, conductor sizing, raceways, overcurrent protection, emergency systems, special occupancies, and special equipment.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed NFPA 72, 2019 Edition, supports questions involving fire alarm system fundamentals, initiating devices, notification appliances, supervising stations, emergency communications, pathways, power supplies, inspection, testing, maintenance, and documentation.\u003c\/p\u003e\n\u003cp\u003eThe Electrical Contractors Licensing Law, Board rules, and NASCLA business reference are included for closed-book preparation and are not allowed in the examination room. Candidates should study these references thoroughly before test day.\u003c\/p\u003e\n\u003cp\u003eApproved references should be complete and comply with current testing requirements involving binding, highlighting, notes, tabs, and added materials. Candidates should avoid temporary tabs, removable notes, loose pages, unauthorized inserts, and other materials prohibited by the testing rules.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing still requires advanced reference-navigation skills. Candidates should know how to move from a question to the proper article, chapter, section, table, definition, exception, annex, or cross-reference without spending unnecessary time searching.\u003c\/p\u003e\n\u003cp\u003eA motor-feeder problem may require several NEC sections and tables. A transformer problem may involve primary protection, secondary conductors, grounding, bonding, and separately derived system requirements. A fire alarm question may require information from both the NEC and NFPA 72.\u003c\/p\u003e\n\u003cp\u003eCandidates should identify which reference controls the subject before beginning a search. Installation, conductor, grounding, motor, service, and transformer questions generally require the NEC. Fire alarm notification, pathway performance, inspection, testing, and maintenance questions may require NFPA 72.\u003c\/p\u003e\n\u003cp\u003eTimed reference practice is essential for a 100-question examination. A productive process is to identify the topic, choose the correct reference, locate the governing provision, read the complete requirement, review exceptions, complete the calculation, and select the best answer.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eReview the Unlimited classification.\u003c\/strong\u003e Understand the project authority, experience qualifications, financial responsibilities, and supervisory obligations associated with the license.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDocument qualifying experience.\u003c\/strong\u003e Gather employment records, project information, and statements showing the required electrical experience.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eObtain supervisory statements.\u003c\/strong\u003e Secure statements from individuals familiar with the applicant’s ability to supervise and direct electrical wiring and installation work.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eUse the included Application Service.\u003c\/strong\u003e Organize the personal, employment, experience, and supporting information needed for the application process.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination application.\u003c\/strong\u003e Submit the required application and supporting documentation to the Board.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide supporting statements.\u003c\/strong\u003e Include experience verification, supervisory statements, character references, and other required records.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the examination fee.\u003c\/strong\u003e Include the applicable payment required by the Board.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive Board approval.\u003c\/strong\u003e The Board determines whether the applicant meets the Unlimited examination qualifications.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination authorization.\u003c\/strong\u003e Approved candidates receive eligibility and scheduling instructions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule the examination.\u003c\/strong\u003e Choose an available appointment within the authorized testing period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the online course.\u003c\/strong\u003e Follow the technical, calculation, plan-reading, licensing, and business study sequence.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eAttend the live classes.\u003c\/strong\u003e Use the guided sessions to reinforce major exam topics, Code navigation, calculations, and licensing concepts.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePractice with the rental books.\u003c\/strong\u003e Use the highlighted and tabbed references throughout the preparation period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination.\u003c\/strong\u003e Bring the required identification and approved technical references to the testing center.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the licensing process.\u003c\/strong\u003e After passing, satisfy the remaining financial, business, and listed qualified individual requirements.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReturn the rental books.\u003c\/strong\u003e Return the books in similar condition within one year from the date received to qualify for the $400 deposit refund.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMaintain the license.\u003c\/strong\u003e Follow current renewal, continuing education, financial responsibility, supervision, and compliance requirements.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina State Board of Examiners of Electrical Contractors regulates the Unlimited examination and licensing process. The Board establishes applicant qualifications, reviews experience, authorizes examinations, certifies qualified individuals, issues licenses, and enforces electrical contracting laws and rules.\u003c\/p\u003e\n\u003cp\u003eAn applicant for the Unlimited classification must document at least 9,000 hours of qualifying experience. At least 8,000 hours must be primary experience. The remaining experience may consist of primary experience, secondary experience, or a combination of both.\u003c\/p\u003e\n\u003cp\u003ePrimary experience generally includes direct work installing electrical wiring and equipment governed by the NEC or work activities directly related to those installations. Recognized experience may also include qualifying supervisory, estimating, inspection, engineering, instructional, maintenance, military, and other approved electrical work.\u003c\/p\u003e\n\u003cp\u003eUnlimited applicants must provide statements from individuals familiar with their electrical work and ability to supervise and direct electrical wiring and installation projects.\u003c\/p\u003e\n\u003cp\u003eThe Unlimited license permits electrical contracting projects regardless of project value. Unlike the Limited and Intermediate classifications, it does not impose a maximum dollar value on an individual electrical contracting project.\u003c\/p\u003e\n\u003cp\u003eThe absence of a project-value ceiling does not remove the obligation to comply with the National Electrical Code, state construction requirements, permits, inspections, workplace safety rules, contracts, and other laws governing electrical work.\u003c\/p\u003e\n\u003cp\u003eElectrical contracting must be conducted in the exact name shown on the active license. The licensed entity must maintain a listed qualified individual who is regularly on active duty and has the authority and responsibility to supervise and direct electrical contracting.\u003c\/p\u003e\n\u003cp\u003eApplicants for the Unlimited license must provide the financial responsibility or bonding documentation required for the classification. That documentation must relate to the license applicant and satisfy the Board’s licensing requirements.\u003c\/p\u003e\n\u003cp\u003ePassing the examination establishes the individual’s examination qualification but does not independently authorize electrical contracting. The proper license must be issued and active before regulated work is offered or performed.\u003c\/p\u003e\n\u003cp\u003eLicense holders must continue complying with Board requirements after licensing. Fraud, misrepresentation, misuse of a license, false advertising, gross negligence, and unlicensed contracting may lead to disciplinary action.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: National Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers services, feeders, branch circuits, motors, transformers, generators, grounding, bonding, raceways, conductor sizing, overcurrent protection, emergency systems, special occupancies, and electrical equipment.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: NFPA 72 - National Fire Alarm and Signaling Code, 2019 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference covers fire alarm fundamentals, initiating devices, notification appliances, supervising stations, emergency communications, pathways, power supplies, inspection, testing, maintenance, documentation, and system performance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Electrical Contractors Licensing Law, General Statutes Chapter 87, Article 4\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference addresses Board authority, electrical contracting, license classifications, qualified individuals, license operation, prohibited conduct, enforcement, and statutory responsibilities. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: The Board’s Rules for the Implementation of the Electrical Contractors Licensing Law, Title 21, North Carolina Administrative Code, Chapter 18B\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference covers examination qualifications, experience requirements, licensing procedures, listed qualified individuals, financial responsibility, renewals, continuing education, and disciplinary requirements. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference supports preparation involving business organization, contracts, estimating, financial management, project scheduling, employment practices, safety, insurance, recordkeeping, and risk management. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference is used for open-book questions involving electrical installations, calculations, conductors, services, feeders, motors, transformers, grounding, bonding, overcurrent protection, and special systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNFPA 72 - National Fire Alarm and Signaling Code, 2019 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference is used for open-book questions involving fire alarm systems, initiating devices, notification appliances, pathways, power supplies, inspection, testing, maintenance, and documentation.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eCreate a study schedule covering services, feeders, branch circuits, motors, transformers, grounding, bonding, conductor sizing, overcurrent protection, fire alarm systems, emergency systems, special occupancies, electrical plans, licensing law, Board rules, and business practices.\u003c\/p\u003e\n\u003cp\u003ePractice service, feeder, dwelling, commercial, motor, transformer, grounding, raceway, box-fill, and voltage-drop calculations. Show each step and identify the NEC table, percentage, demand factor, or rule used to reach the answer.\u003c\/p\u003e\n\u003cp\u003eUse the highlighted and tabbed 2020 NEC for timed navigation involving conductor ampacity, adjustment factors, correction factors, motor circuits, transformer protection, raceway fill, box sizing, grounding conductors, equipment ratings, and special-system requirements.\u003c\/p\u003e\n\u003cp\u003eUse the highlighted and tabbed NFPA 72, 2019 Edition, to review fire alarm system operation, pathways, initiating devices, notification appliances, supervising stations, emergency communications, testing, inspection, maintenance, and documentation.\u003c\/p\u003e\n\u003cp\u003ePractice reading lighting plans, power plans, panel schedules, one-line diagrams, risers, symbols, equipment notes, conductor callouts, and circuit information. Connect each plan detail to the applicable Code provision.\u003c\/p\u003e\n\u003cp\u003eStudy the licensing law and Board rules as closed-book subjects. Focus on Unlimited experience requirements, supervisory statements, listed qualified individuals, license operation, financial responsibility, renewal, continuing education, and prohibited conduct.\u003c\/p\u003e\n\u003cp\u003eReview the NASCLA business reference for contracts, estimating, bidding, scheduling, accounting, employment practices, insurance, safety administration, project documentation, and risk management.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Unlimited Electrical Contractor candidates organize technical, calculation, plan-reading, licensing, and business subjects into a practical preparation structure.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed rental books support faster access to major NEC articles, NFPA 72 chapters, calculation tables, licensing provisions, Board rules, and contractor business topics.\u003c\/p\u003e\n\u003cp\u003eThe online course provides organized review involving services, feeders, motors, transformers, generators, grounding, bonding, overcurrent protection, fire alarm systems, electrical plans, licensing requirements, and business management.\u003c\/p\u003e\n\u003cp\u003eLive classes provide guided opportunities to review important subjects, work through calculations, strengthen reference-navigation skills, and address commonly challenging technical concepts.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation helps candidates identify the subject of a question, choose the correct reference, locate the governing provision, complete the required calculation, and interpret the result efficiently.\u003c\/p\u003e\n\u003cp\u003eReference-navigation guidance helps students become familiar with NEC articles, NFPA 72 chapters, definitions, tables, exceptions, annexes, and cross-references. This familiarity supports more effective use of the approved books during the examination.\u003c\/p\u003e\n\u003cp\u003ePlan-reading preparation reinforces the interpretation of symbols, panel schedules, riser diagrams, equipment notes, feeder routes, and conductor callouts while connecting plan information to applicable Code provisions.\u003c\/p\u003e\n\u003cp\u003eApplication Service helps candidates organize the information needed for the application process, while final eligibility and licensing decisions remain with the Board.\u003c\/p\u003e\n\u003cp\u003eNo course, live class, book package, or application service can guarantee examination passage or license issuance. Results depend on the candidate’s experience, qualifications, study effort, familiarity with the references, calculation skills, plan-reading ability, supervisory knowledge, and performance during the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in the Ultimate package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes five highlighted and tabbed rental books, the North Carolina Electrical Contractor online exam prep course, live classes, 1 year of course access, a one-year book rental period, and Application Service.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $1,315, plus a $400 refundable book deposit, for a total of $1,715.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the $400 deposit refundable?\u003c\/h2\u003e\n\u003cp\u003eYes. The $400 deposit is refundable when the rental books are returned in similar condition within one year from the date they are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the book rental period?\u003c\/h2\u003e\n\u003cp\u003eThe rental period is one year from the date the books are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course available?\u003c\/h2\u003e\n\u003cp\u003eThe Ultimate package includes 1 year of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre live classes included?\u003c\/h2\u003e\n\u003cp\u003eYes. Live classes are included with the North Carolina Electrical Contractor trade online exam prep course.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs Application Service included?\u003c\/h2\u003e\n\u003cp\u003eYes. Application Service is included with this package to support organization of the information needed for the application process.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does book preparation take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for the trade reference books to be highlighted and tabbed before shipment.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich books are allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eThe 2020 National Electrical Code and NFPA 72, 2019 Edition, are the technical exam-room references included in this rental package.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the licensing law, Board rules, and NASCLA book allowed during the exam?\u003c\/h2\u003e\n\u003cp\u003eNo. These references are included for closed-book study and are not allowed in the examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow many questions are on the examination?\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Unlimited Electrical Contractor examination contains 100 multiple-choice questions.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much time is allowed?\u003c\/h2\u003e\n\u003cp\u003eCandidates have a maximum of six hours to complete the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat score is required to pass?\u003c\/h2\u003e\n\u003cp\u003eA minimum score of 70 percent is required to pass.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much experience is required?\u003c\/h2\u003e\n\u003cp\u003eApplicants must document at least 9,000 hours of qualifying experience, including at least 8,000 hours of primary experience.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs there a project-value limit?\u003c\/h2\u003e\n\u003cp\u003eNo. The Unlimited classification permits electrical contracting projects regardless of project value.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue the license?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing satisfies the examination requirement, but the applicant must complete the Board’s licensing process and meet the applicable financial, business, and listed qualified individual requirements.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919389188149,"sku":null,"price":1720.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-25-NC-UNLIMITED-ELECTRICAL-ULTIMATE.jpg?v=1787552505"},{"product_id":"north-carolina-water-lines-and-sewer-lines-contractor-book-rental-package","title":"North Carolina Water Lines and Sewer Lines Contractor - Books \u0026 Course Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Water Lines and Sewer Lines Contractor - Books \u0026amp; Course Rental Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Water Lines and Sewer Lines Contractor examination with a complete rental package that combines highlighted and tabbed trade references with an online exam prep course. This package supports organized preparation for contractors working with underground water distribution, sewer collection, ductile iron pipe, concrete pipe, excavation, grading, trench safety, erosion control, utility location, contractor law, and project management.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Water Lines and Sewer Lines classification covers construction involving water and sewer mains, water service lines, and house and building sewer lines. The classification also covers water storage tanks, lift stations, pumping stations, related appurtenances, pavement patching, backfill, and erosion control performed as part of water-line and sewer-line construction.\u003c\/p\u003e\n\u003cp\u003eThe package includes highlighted and tabbed rental references for occupational safety, ductile iron pipe installation, concrete pipe and box culvert installation, excavation safety, sedimentation control, business law, pipe contracting, and North Carolina general contracting laws and regulations.\u003c\/p\u003e\n\u003cp\u003eThe technical preparation focuses on the practical knowledge needed to complete underground utility work safely and correctly. Candidates should be prepared to review trenching, excavation protection, pipe handling, bedding, alignment, joining, testing, backfill, compaction, utility-location procedures, erosion control, and restoration of disturbed areas.\u003c\/p\u003e\n\u003cp\u003eThe included online course organizes examination topics into manageable study areas. Candidates can use the course alongside the highlighted and tabbed books to strengthen trade knowledge, practice reference navigation, review contractor responsibilities, and prepare for questions involving both field operations and North Carolina regulations.\u003c\/p\u003e\n\u003cp\u003eThis package includes a six-month book rental period and \u003cstrong\u003e6 months of course access\u003c\/strong\u003e. The book rental period begins when the books are received. The extended study period allows candidates to work through the technical material, review difficult topics, practice locating information, and build a consistent preparation schedule.\u003c\/p\u003e\n\u003cp\u003ePlease allow 15 business days for the rental books to be highlighted and tabbed before shipment. Permanent tabs and organized highlighting make it easier to locate major safety provisions, installation procedures, regulatory topics, calculations, tables, and project-management subjects during study.\u003c\/p\u003e\n\u003cp\u003eThe package price is $890, plus a $300 refundable book deposit, for a total of $1,190. The $300 deposit is refundable when the rental books are returned in similar condition within six months from the date they are received.\u003c\/p\u003e\n\u003cp\u003eThe package includes the 2019 edition of \u003cem\u003eConcrete Pipe and Box Culvert Installation\u003c\/em\u003e selected for this rental product. The current examination reference list identifies the 2007 edition for exam-room use. The included 2019 edition supports study and course preparation but should not be treated as the listed exam-room edition.\u003c\/p\u003e\n\u003cp\u003eHighlighted and tabbed references can improve organization, but effective preparation still requires careful reading and application. Candidates should understand complete procedures, safety requirements, installation tolerances, regulatory responsibilities, and the sequence of work involved in water-line and sewer-line construction.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e North Carolina Occupational Safety and Health Standards for the Construction Industry, with the latest available amendments, highlighted and tabbed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Installation Guide for Ductile Iron Pipe, highlighted and tabbed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Concrete Pipe and Box Culvert Installation, 2019, highlighted and tabbed for study use.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e North Carolina Excavation Safety Guidelines, 2022 or later, highlighted and tabbed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e North Carolina Administrative Code, Title 15A, Chapter 4 Sedimentation Control, including the latest amendments, highlighted and tabbed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e North Carolina General Statutes Chapter 113A, Article 4, Sedimentation Pollution Control Act of 1973, highlighted and tabbed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition, highlighted and tabbed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Pipe and Excavation Contracting, highlighted and tabbed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Laws and Regulations Applicable to General Contracting in the State of North Carolina, highlighted and tabbed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eOnline Course:\u003c\/strong\u003e North Carolina Water Lines and Sewer Lines Contractor trade online exam prep course.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 6 months of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Rental Period:\u003c\/strong\u003e Six months from the date the books are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Preparation:\u003c\/strong\u003e Please allow 15 business days for the rental books to be highlighted and tabbed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $890.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Book Deposit:\u003c\/strong\u003e $300.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Due:\u003c\/strong\u003e $1,190.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e The $300 deposit is refundable when the books are returned in similar condition within six months from the date they are received.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Water Lines and Sewer Lines Contractor examination contains 45 questions. Candidates have 120 minutes to complete the examination, and a score of 70 percent is required to pass.\u003c\/p\u003e\n\u003cp\u003eThe examination content includes safety, general trade knowledge, underground utility work involving concrete pipe, underground utility work involving ductile iron pipe, excavation and grading, liens, erosion and sedimentation control, one-call requirements, and laws and regulations.\u003c\/p\u003e\n\u003cp\u003eSafety preparation should include personal protective equipment, hazard communication, trench access, protective systems, competent-person responsibilities, equipment operation, material handling, traffic exposure, confined spaces, and safe work around underground utilities.\u003c\/p\u003e\n\u003cp\u003eExcavation preparation may involve soil conditions, trench stability, sloping, benching, shoring, shielding, spoil placement, ladders, ramps, water accumulation, atmospheric hazards, nearby structures, mobile equipment, and inspections of excavation work areas.\u003c\/p\u003e\n\u003cp\u003eDuctile iron pipe preparation should include receiving and storing pipe, trench preparation, bedding, lowering pipe into the trench, alignment, joint assembly, gasket installation, cutting, fittings, restrained joints, thrust restraint, backfill, pressure testing, disinfection, and inspection.\u003c\/p\u003e\n\u003cp\u003eConcrete pipe preparation may involve unloading, handling, storage, trench dimensions, foundation preparation, bedding, line and grade, joint installation, lift holes, haunch support, backfill placement, compaction, testing, and protection from construction loads.\u003c\/p\u003e\n\u003cp\u003eGeneral knowledge questions may address construction terminology, tools, equipment, materials, work sequencing, plan interpretation, measurements, quantities, field coordination, and accepted underground utility practices.\u003c\/p\u003e\n\u003cp\u003eExcavating and grading topics may include site preparation, trench dimensions, dewatering, soil removal, equipment selection, grade control, bedding elevations, backfill lifts, compaction, settlement prevention, pavement restoration, and protection of existing improvements.\u003c\/p\u003e\n\u003cp\u003eErosion and sedimentation control preparation may include land-disturbing activities, stabilization, sediment barriers, construction entrances, diversion measures, stockpile protection, maintenance responsibilities, inspections, and protection of nearby property and waterways.\u003c\/p\u003e\n\u003cp\u003eOne-call preparation should address advance notice, facility-location requests, tolerance zones, markings, excavation practices, damage prevention, emergency procedures, and responsibilities when underground utilities are exposed or damaged.\u003c\/p\u003e\n\u003cp\u003eLaw and regulation topics may involve contractor licensing, qualifier responsibilities, liens, contracts, project records, business practices, statutory duties, license use, and compliance with North Carolina general contracting requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Water Lines and Sewer Lines Contractor examination is an open-book test. Candidates may bring the references specifically allowed under the current examination rules.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Occupational Safety and Health Standards for the Construction Industry, with the latest available amendments, is included as an exam-room reference. It supports questions involving construction safety, trenching, excavation, protective systems, equipment, personal protective equipment, access, material handling, and workplace hazards.\u003c\/p\u003e\n\u003cp\u003eThe Installation Guide for Ductile Iron Pipe is included as an exam-room technical reference. It supports questions involving handling, trench preparation, bedding, joint assembly, fittings, thrust restraint, backfill, testing, and installation practices for ductile iron piping systems.\u003c\/p\u003e\n\u003cp\u003eThe examination reference list identifies the 2007 edition of \u003cem\u003eConcrete Pipe and Box Culvert Installation\u003c\/em\u003e for exam-room use. This package includes the customer-selected 2019 edition for study and course preparation. Candidates need the listed 2007 edition when preparing an exam-room reference set.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Excavation Safety Guidelines, sedimentation-control regulations, Sedimentation Pollution Control Act, NASCLA business guide, \u003cem\u003ePipe and Excavation Contracting\u003c\/em\u003e, and North Carolina general contracting laws and regulations are included for closed-book study. These references are not allowed in the examination center.\u003c\/p\u003e\n\u003cp\u003ePermitted references may be highlighted, underlined, and indexed before the examination. Permanent tabs may be used, but removable tabs and temporary flags are not permitted. Notes may not be written on the tabs.\u003c\/p\u003e\n\u003cp\u003eCandidates may not write in the references before or during the examination. Loose papers, attached notes, unauthorized inserts, and partial references are not accepted as exam-room materials.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing requires familiarity with the permitted references. Candidates should practice identifying the subject of a question, selecting the correct book, locating the relevant chapter or section, and applying the information without spending unnecessary time searching.\u003c\/p\u003e\n\u003cp\u003eTimed practice should combine technical knowledge with efficient navigation. A useful process is to identify the installation or safety topic, determine which reference applies, locate the governing procedure, read the surrounding material, and select the answer that best reflects the complete requirement.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the classification.\u003c\/strong\u003e Confirm that Water Lines and Sewer Lines matches the type of public utilities construction the business intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eChoose the license limitation.\u003c\/strong\u003e Determine the appropriate Limited, Intermediate, or Unlimited limitation for the business.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the qualifying party.\u003c\/strong\u003e Designate the individual who will qualify the license in the Water Lines and Sewer Lines classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the license application.\u003c\/strong\u003e Submit the required business, ownership, qualifier, and financial information to the North Carolina Licensing Board for General Contractors.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e The Board reviews the application before authorizing the qualifying party to schedule the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule the examination.\u003c\/strong\u003e Follow the eligibility instructions and arrange the testing appointment with PSI.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the online course.\u003c\/strong\u003e Work through safety, concrete pipe, ductile iron pipe, excavation, erosion control, one-call, lien, and regulatory topics.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStudy the closed-book references.\u003c\/strong\u003e Review the materials that cannot be used during the examination until the main responsibilities and procedures can be recalled.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePractice with the exam-room books.\u003c\/strong\u003e Build familiarity with the approved safety and ductile iron pipe references.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eObtain the listed concrete pipe edition.\u003c\/strong\u003e Use the concrete pipe reference edition identified for exam-room admission.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination.\u003c\/strong\u003e Bring the required identification and permitted references to the testing center.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSatisfy licensing requirements.\u003c\/strong\u003e Complete any remaining financial, qualifier, and business requirements for issuance of the license.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMaintain the license.\u003c\/strong\u003e Renew the license and keep the qualifying-party and business information current.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReturn the rental books.\u003c\/strong\u003e Return the books in similar condition within six months from receipt to qualify for the $300 deposit refund.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates the Water Lines and Sewer Lines classification. The classification falls within the public utilities category of general contracting.\u003c\/p\u003e\n\u003cp\u003eThe scope covers water and sewer mains, water service lines, house and building sewer lines, water storage tanks, lift stations, pumping stations, and appurtenances associated with those facilities. It also includes pavement patching, backfill, and erosion control performed as part of the construction.\u003c\/p\u003e\n\u003cp\u003eA North Carolina general contractor license is required when a project meets the state’s licensing threshold. The license must include the classification and limitation needed for the work being contracted.\u003c\/p\u003e\n\u003cp\u003eEach license must have a qualifying party for the classification. The qualifying party is the individual who completes the required examination and qualifies the business for the approved work classification.\u003c\/p\u003e\n\u003cp\u003eThe business must apply in the proper legal name and provide the ownership, organizational, financial, and qualifier information required by the Board. License limitations are tied to financial qualifications and control the size of projects the business may undertake.\u003c\/p\u003e\n\u003cp\u003ePassing the trade examination does not independently authorize contracting. The license must be issued and active before the business undertakes work that requires North Carolina general contractor licensure.\u003c\/p\u003e\n\u003cp\u003eLicensed contractors are responsible for performing work in accordance with applicable contracts, plans, specifications, safety requirements, environmental rules, utility-location requirements, permits, inspections, and professional standards.\u003c\/p\u003e\n\u003cp\u003eContractors should maintain accurate records involving contracts, changes, notices, project costs, subcontractors, safety activities, inspections, testing, and completion documentation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference covers construction safety, excavation, trenching, protective systems, access, personal protective equipment, equipment operation, and workplace hazards.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Installation Guide for Ductile Iron Pipe\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference addresses handling, storage, trench preparation, bedding, joint assembly, fittings, restrained joints, thrust restraint, backfill, testing, and ductile iron pipe installation.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Concrete Pipe and Box Culvert Installation, 2019\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed study reference addresses concrete pipe handling, foundations, bedding, line and grade, joints, haunch support, backfill, compaction, and installation quality. The current exam-room list identifies the 2007 edition.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina Excavation Safety Guidelines, 2022 or Later\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference supports preparation involving utility-location practices, safe excavation, tolerance zones, markings, damage prevention, and responsibilities around underground facilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina Administrative Code, Title 15A, Chapter 4 Sedimentation Control\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference covers rules applying to erosion and sedimentation control for land-disturbing activities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina General Statutes Chapter 113A, Article 4 Sedimentation Pollution Control Act of 1973\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference covers statutory responsibilities involving sedimentation pollution control.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference supports preparation involving contracts, estimating, financial management, project administration, safety, insurance, and business practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Pipe and Excavation Contracting\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference addresses pipe installation, excavation operations, estimating, equipment, production, materials, and field practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Laws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference covers statutes and rules governing general contracting, licensing, qualifiers, business operation, and contractor responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference supports open-book safety and excavation questions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eInstallation Guide for Ductile Iron Pipe\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference supports open-book questions involving ductile iron pipe handling, joining, installation, restraint, backfill, and testing.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBuild a study schedule around safety, ductile iron pipe, concrete pipe, excavation, grading, erosion control, one-call procedures, liens, and contractor regulations. Spend additional time on concrete pipe, ductile iron pipe, and excavation because these areas represent a large portion of the examination.\u003c\/p\u003e\n\u003cp\u003ePractice locating trenching provisions, protective-system requirements, access rules, spoil-placement requirements, water-accumulation controls, and competent-person duties in the safety reference.\u003c\/p\u003e\n\u003cp\u003eReview ductile iron pipe installation from delivery through final testing. Understand bedding, joint cleanliness, gasket placement, deflection, fittings, thrust restraint, backfill, pressure testing, leakage testing, and disinfection.\u003c\/p\u003e\n\u003cp\u003eStudy concrete pipe installation as a complete system. Pipe performance depends on the foundation, bedding, haunch support, joint installation, initial backfill, final backfill, compaction, and protection from excessive construction loading.\u003c\/p\u003e\n\u003cp\u003eReview the closed-book references repeatedly so that important excavation, sedimentation-control, lien, licensing, and business responsibilities can be answered without consulting those books during the test.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Water Lines and Sewer Lines Contractor candidates organize technical, safety, regulatory, and business subjects into a practical study structure.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed rental books support faster navigation through safety provisions, pipe-installation procedures, excavation topics, sedimentation-control rules, contractor laws, and project-management subjects.\u003c\/p\u003e\n\u003cp\u003eThe online course provides trade-focused review involving ductile iron pipe, concrete pipe, trenching, grading, utility location, erosion control, contractor law, and field operations.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation helps candidates identify the subject of a question, select the appropriate reference, locate the relevant information, and apply the requirement to a construction situation.\u003c\/p\u003e\n\u003cp\u003eClosed-book review strengthens familiarity with excavation guidelines, sedimentation-control requirements, business practices, liens, and North Carolina contractor regulations that cannot be referenced during the examination.\u003c\/p\u003e\n\u003cp\u003eThe six-month access period allows candidates to revisit challenging subjects, repeat technical review, practice navigation, and prepare according to their work schedule.\u003c\/p\u003e\n\u003cp\u003eNo course or rental-book package can guarantee examination passage or license issuance. Results depend on the candidate’s knowledge, experience, preparation, application approval, reference-navigation ability, and performance during the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in this rental package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes nine highlighted and tabbed rental references, the North Carolina Water Lines and Sewer Lines Contractor online exam prep course, a six-month rental period, and 6 months of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $890, plus a $300 refundable book deposit, for a total of $1,190.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the $300 deposit refundable?\u003c\/h2\u003e\n\u003cp\u003eYes. The deposit is refundable when the books are returned in similar condition within six months from the date they are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the book rental period?\u003c\/h2\u003e\n\u003cp\u003eThe rental period is six months from the date the books are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course available?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 6 months of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does book preparation take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for the books to be highlighted and tabbed before shipment.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the examination open book?\u003c\/h2\u003e\n\u003cp\u003eYes. Candidates may use the references specifically permitted by the current examination rules.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the included 2019 concrete pipe book the listed exam-room edition?\u003c\/h2\u003e\n\u003cp\u003eNo. The package includes the 2019 edition for study, while the current examination reference list identifies the 2007 edition for exam-room use.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow many questions are on the examination?\u003c\/h2\u003e\n\u003cp\u003eThe examination contains 45 questions.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much time is allowed?\u003c\/h2\u003e\n\u003cp\u003eCandidates have 120 minutes to complete the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat score is required to pass?\u003c\/h2\u003e\n\u003cp\u003eA score of 70 percent is required to pass.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat subjects are covered?\u003c\/h2\u003e\n\u003cp\u003eThe examination covers safety, general knowledge, concrete pipe, ductile iron pipe, excavation and grading, liens, erosion and sedimentation control, one-call requirements, and laws and regulations.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the exam automatically issue the license?\u003c\/h2\u003e\n\u003cp\u003eNo. The business must complete the Board’s application, financial, qualifier, and licensing requirements before the license is issued.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Books \u0026 Courses Rental - Self Study","offer_id":45919389220917,"sku":null,"price":1195.0,"currency_code":"USD","in_stock":true},{"title":"Books \u0026 Courses Self Study + Live \u0026 Recorded Classes [+$200]","offer_id":45919389253685,"sku":null,"price":1395.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-73-NC-WATER-LINES-RENTAL.jpg?v=1787552506"},{"product_id":"north-carolina-roofing-contractor-book-rental-package","title":"North Carolina Roofing Contractor Exam - Books \u0026 Course Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Roofing Contractor Exam - Books \u0026amp; Course Rental Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Roofing Contractor examination with a complete rental package that combines highlighted and tabbed reference books with a trade-focused online exam prep course. This package supports structured study across steep-slope roofing, membrane systems, metal panels, spray polyurethane foam roofing, roof substrates, repairs, flashing, safety, building-code requirements, business law, licensing, liens, and project management.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Roofing specialty classification covers the installation and repair of roofs and decks on residential, commercial, industrial, and institutional structures when the installed materials create a watertight and weather-resistant surface. The classification includes a wide range of roofing materials and related components, making broad preparation important for candidates pursuing this credential.\u003c\/p\u003e\n\u003cp\u003eThis rental package includes seven exam-room-approved references. The library contains the North Carolina Occupational Safety and Health Standards for the Construction Industry with the latest available amendments, the 2018 North Carolina Building Code, the Contractor’s Guide to Business, Law and Project Management—North Carolina General Contractors Edition, 10th Edition, the 2018 North Carolina Administrative Code and Policies, and three NRCA Roofing Manuals covering steep-slope, metal panel, spray polyurethane foam, and membrane roofing systems.\u003c\/p\u003e\n\u003cp\u003eThe package also includes two closed-book study references that are not permitted in the examination room: Roofing Construction and Estimating by Daniel Atcheson and Laws and Regulations Applicable to General Contracting in the State of North Carolina. These publications support preparation involving roofing calculations, estimating, installation practices, contractor licensing, liens, and professional responsibilities.\u003c\/p\u003e\n\u003cp\u003eAll included trade reference books are highlighted and tabbed to help organize study and improve navigation. Tabs identify major topics and frequently used sections, while highlighting draws attention to important requirements, terminology, tables, details, and procedures. Candidates should still review complete sections and become familiar with each publication rather than relying only on the marked material.\u003c\/p\u003e\n\u003cp\u003eThe package includes the North Carolina Roofing Contractor trade online exam prep course and 6 months of course access. The course helps candidates organize the examination content, review major roofing systems, strengthen open-book navigation, and practice applying technical information to contractor exam questions.\u003c\/p\u003e\n\u003cp\u003eThe book rental period is 6 months from the time the materials are received. The package price is $1,590, plus a $700 refundable rental-book deposit, for a total initial payment of $2,290. The $700 deposit is refunded when all books are returned in similar condition within the six-month rental period. Please allow 15 business days for the books to be highlighted, tabbed, and processed.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e North Carolina Occupational Safety and Health Standards for the Construction Industry, with latest available amendments\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e North Carolina Building Code: Building Code, 2018 Edition\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e North Carolina Administrative Code and Policies, 2018 Edition\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e NRCA Roofing Manual: Steep Slope Roof Systems, 2025\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e NRCA Roofing Manual: Metal Panel and SPF Roof Systems, 2024\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e NRCA Roofing Manual: Membrane Roofing Systems, 2023\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Roofing Construction and Estimating, Daniel Atcheson, 1995\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Laws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eHighlighted and Tabbed Books:\u003c\/strong\u003e Trade references are prepared to support organized study and efficient navigation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eOnline Trade Course:\u003c\/strong\u003e North Carolina Roofing Contractor online exam preparation covering technical, safety, business, code, and licensing subjects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 6 months of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Rental Period:\u003c\/strong\u003e 6 months from the time the books are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $1,590\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Rental-Book Deposit:\u003c\/strong\u003e $700\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Initial Payment:\u003c\/strong\u003e $2,290\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e The $700 deposit is refunded when the books are returned in similar condition within 6 months from the time they are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProcessing:\u003c\/strong\u003e Please allow 15 business days for the books to be highlighted, tabbed, and processed.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Roofing Contractor examination contains 60 questions. Candidates must earn a score of 70 percent to pass, and the examination allows 120 minutes for completion.\u003c\/p\u003e\n\u003cp\u003eThe examination outline includes safety, roofing substrates, steep-slope roofing, roof repairs, elastomeric roofing, built-up bituminous roofing, business and law, sheet metal and flashing, licensing, liens, and general building-code requirements.\u003c\/p\u003e\n\u003cp\u003eSteep-slope roofing is the largest examination category. Candidates should study asphalt shingles, wood shakes and shingles, slate, clay and concrete tile, underlayment, roof deck requirements, fastening, flashing, valleys, ridges, hips, penetrations, ventilation, ice protection, material storage, and weather-related installation considerations.\u003c\/p\u003e\n\u003cp\u003eRoof-substrate preparation may involve roof decks, sheathing, insulation, cover boards, vapor retarders, existing roof conditions, moisture, drainage, slope, attachment, compatibility, and preparation before installation of the finished roofing system.\u003c\/p\u003e\n\u003cp\u003eMembrane-roofing preparation should include single-ply systems, built-up roofing, modified bitumen, attachment methods, insulation, surfacing, seams, flashing, penetrations, expansion joints, drainage, repairs, and maintenance. Candidates should understand the distinctions among mechanically attached, adhered, ballasted, and other roof-system configurations.\u003c\/p\u003e\n\u003cp\u003eMetal-panel preparation may involve standing-seam and through-fastened systems, substrates, clips, fasteners, panel layout, laps, sealants, thermal movement, flashing, penetrations, transitions, trim, underlayment, condensation control, and safe material handling.\u003c\/p\u003e\n\u003cp\u003eSpray polyurethane foam roofing preparation may include substrate conditions, foam application, thickness, coatings, weather limitations, surface preparation, drainage, flashing, repairs, maintenance, and protection of adjacent surfaces.\u003c\/p\u003e\n\u003cp\u003eRoof-repair questions may address leak investigation, moisture damage, flashing failures, membrane defects, punctures, open seams, deteriorated materials, substrate conditions, drainage problems, and selection of compatible repair methods.\u003c\/p\u003e\n\u003cp\u003eSheet-metal and flashing preparation may include valleys, counterflashing, base flashing, copings, edge metal, gravel stops, gutters, downspouts, scuppers, roof penetrations, wall transitions, expansion joints, and methods used to direct water away from vulnerable areas.\u003c\/p\u003e\n\u003cp\u003eSafety preparation should address fall protection, ladders, scaffolds, personal protective equipment, material handling, hoisting, electrical hazards, hot work, fire prevention, silica exposure, roof openings, warning lines, controlled-access practices, and employer responsibilities.\u003c\/p\u003e\n\u003cp\u003eBusiness and law preparation may involve contracts, estimating, financial management, project scheduling, employment responsibilities, insurance, safety programs, risk management, and contractor business operations. Candidates should also review North Carolina licensing and lien requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Roofing Contractor examination is an open-book test. Candidates may use only the references identified as permitted for the examination and must bring their own approved materials to the testing center.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Occupational Safety and Health Standards for the Construction Industry supports questions involving fall protection, ladders, scaffolds, personal protective equipment, electrical hazards, material handling, fire protection, and roofing-related workplace safety.\u003c\/p\u003e\n\u003cp\u003eThe 2018 North Carolina Building Code supports questions involving roof assemblies, materials, fire classifications, structural requirements, drainage, insulation, weather protection, reroofing, and general building-code provisions.\u003c\/p\u003e\n\u003cp\u003eThe Contractor’s Guide to Business, Law and Project Management—North Carolina General Contractors Edition, 10th Edition supports examination topics involving contracts, estimating, financial controls, project management, employment practices, insurance, safety administration, and risk management.\u003c\/p\u003e\n\u003cp\u003eThe 2018 North Carolina Administrative Code and Policies supports questions involving permits, inspections, construction documents, approvals, enforcement, code administration, and the authority and responsibilities of contractors and code officials.\u003c\/p\u003e\n\u003cp\u003eThe NRCA Roofing Manual: Steep Slope Roof Systems supports technical preparation for asphalt shingles, wood roofing, tile, slate, roof decks, underlayments, flashing, ventilation, and steep-slope installation details.\u003c\/p\u003e\n\u003cp\u003eThe NRCA Roofing Manual: Metal Panel and SPF Roof Systems supports questions involving metal roofing, panel attachment, seams, clips, fasteners, thermal movement, spray polyurethane foam, protective coatings, flashing, repairs, and installation practices.\u003c\/p\u003e\n\u003cp\u003eThe NRCA Roofing Manual: Membrane Roofing Systems supports preparation involving built-up, modified bitumen, and single-ply membrane systems, including substrates, insulation, attachment, flashing, seams, surfacing, drainage, maintenance, and repairs.\u003c\/p\u003e\n\u003cp\u003eRoofing Construction and Estimating and Laws and Regulations Applicable to General Contracting in the State of North Carolina are included for study but are not allowed in the examination room. Candidates should review these books throughout the rental period so they can apply the information without relying on the publications during the test.\u003c\/p\u003e\n\u003cp\u003eApproved references may be highlighted, underlined, and indexed before the examination. Permanent tabs are allowed, but removable tabs are not permitted. Notes may not be written on tabs, and references may not contain written notes or added loose materials.\u003c\/p\u003e\n\u003cp\u003eCode references downloaded and printed for exam use must be complete, properly bound, and permitted under the current testing rules. Partial references are not accepted.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eConfirm the Roofing specialty classification.\u003c\/strong\u003e Review the scope and determine whether it matches the roofing and waterproofing work the applicant intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect a license limitation.\u003c\/strong\u003e Choose the limited, intermediate, or unlimited limitation that fits the intended value of individual projects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the applicant entity.\u003c\/strong\u003e Determine whether the license applicant will be an individual, LLC, corporation, partnership, or another eligible entity.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesignate a qualifier.\u003c\/strong\u003e Identify the individual who will satisfy the examination requirement for the Roofing specialty classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the application.\u003c\/strong\u003e Submit the required applicant, entity, ownership, qualifier, financial, and supporting information.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide evidence of financial responsibility.\u003c\/strong\u003e Meet the financial requirement associated with the selected license limitation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the background-check requirement.\u003c\/strong\u003e Consent to or provide the criminal background information required by the Board.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e The Board must approve the candidate before the examination can be scheduled.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule the PSI examination.\u003c\/strong\u003e Use the eligibility information to arrange the examination within the authorized testing period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrepare the approved references.\u003c\/strong\u003e Confirm that all exam-room books comply with current requirements for editions, binding, tabs, highlighting, and markings.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination.\u003c\/strong\u003e Follow all identification, security, scheduling, calculator, and reference-material procedures.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete license issuance requirements.\u003c\/strong\u003e Passing the examination satisfies the testing component, but the applicant must complete all remaining Board requirements before the license is issued.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates the Roofing specialty classification. Applicants must be at least 18 years old, possess good moral character as determined by the Board, provide evidence of financial responsibility, submit the applicable application fee, and consent to a criminal background check when required.\u003c\/p\u003e\n\u003cp\u003eA North Carolina general contractor license is required when a person or business bids on, contracts for, or undertakes a construction project valued at $40,000 or more, subject to applicable statutory definitions and exceptions.\u003c\/p\u003e\n\u003cp\u003eThe Roofing specialty classification covers the installation and repair of roofs and decks on residential, commercial, industrial, and institutional structures when the roofing materials create a watertight and weather-resistant surface.\u003c\/p\u003e\n\u003cp\u003eThe scope includes cedar, cement, clay tile, composition shingles, metal coverings, wood shakes, single-ply roofing, built-up roofing, protective and reflective roof and deck coatings, sheet-metal valleys, flashings, gravel stops, gutters, downspouts, and bituminous waterproofing.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina general contractor licenses are issued with limited, intermediate, or unlimited limitations. A limited license allows qualifying individual projects up to $750,000. An intermediate license allows qualifying individual projects up to $1,500,000. An unlimited license has no restriction on the value of an individual project.\u003c\/p\u003e\n\u003cp\u003eEach limitation carries financial qualification requirements. Applicants should select the limitation that fits their intended work and provide the required financial documentation or approved alternative security.\u003c\/p\u003e\n\u003cp\u003eThe qualifier’s examination credential and the contractor license are separate. Passing the Roofing examination does not independently authorize an individual or business to bid or contract. The license must be issued to the legal entity conducting the contracting activity.\u003c\/p\u003e\n\u003cp\u003eLicensed roofing contractors must operate within the classification and limitation shown on the active license. They are also responsible for permits, inspections, contracts, jobsite safety, employee supervision, code compliance, and maintaining accurate entity and qualifier information.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference covers fall protection, ladders, scaffolds, roof openings, personal protective equipment, electrical hazards, material handling, fire prevention, and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina Building Code: Building Code, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference covers roofing assemblies, weather protection, roof coverings, fire classifications, insulation, drainage, flashing, reroofing, structural requirements, and general building-code provisions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference addresses contracts, estimating, financial management, project administration, employment practices, insurance, safety programs, and risk management.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina Administrative Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference covers permits, construction documents, inspections, approvals, enforcement, code administration, and contractor responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: NRCA Roofing Manual: Steep Slope Roof Systems, 2025\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference covers steep-slope materials, roof decks, underlayments, asphalt shingles, wood roofing, tile, slate, flashing, ventilation, details, and installation practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: NRCA Roofing Manual: Metal Panel and SPF Roof Systems, 2024\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference addresses metal-panel roof systems, clips, fasteners, seams, flashing, thermal movement, spray polyurethane foam roofing, coatings, repairs, and maintenance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: NRCA Roofing Manual: Membrane Roofing Systems, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference covers built-up, modified bitumen, and single-ply membrane systems, including substrates, insulation, attachment, seams, flashing, drainage, maintenance, and repairs.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Roofing Construction and Estimating, Daniel Atcheson, 1995\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed study reference supports preparation involving roof measurements, material quantities, estimating, installation methods, flashing, drainage, roof shapes, and roofing construction practices. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Laws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed study reference covers classifications, limitations, qualifiers, licensing requirements, liens, enforcement, and contractor responsibilities. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for open-book questions involving roofing safety and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Building Code: Building Code, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for roofing assemblies, reroofing, weather protection, materials, drainage, and general building-code questions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for business, law, estimating, project management, insurance, and risk-control questions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Administrative Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for permits, inspections, approvals, administration, and code-enforcement questions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNRCA Roofing Manual: Steep Slope Roof Systems, 2025\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for technical questions involving steep-slope roofing materials, details, and installation.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNRCA Roofing Manual: Metal Panel and SPF Roof Systems, 2024\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for metal-panel and spray polyurethane foam roofing questions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNRCA Roofing Manual: Membrane Roofing Systems, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for built-up, modified bitumen, and single-ply membrane roofing questions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBuild a study schedule around steep-slope roofing, substrates, membrane systems, metal panels, spray polyurethane foam, repairs, flashing, safety, code requirements, business law, licensing, and liens.\u003c\/p\u003e\n\u003cp\u003eUse the seven exam-room references during timed lookup exercises. Read the question, identify the roofing system or business subject, choose the correct publication, locate the applicable section, and review the full requirement before selecting an answer.\u003c\/p\u003e\n\u003cp\u003eGive additional study time to steep-slope roofing because it represents the largest portion of the examination outline. Review deck preparation, underlayment, fastening, flashing, valleys, penetrations, ventilation, and material-specific installation practices.\u003c\/p\u003e\n\u003cp\u003eStudy the restricted books separately. Use Roofing Construction and Estimating to reinforce calculations, material quantities, roof geometry, and installation concepts. Use the laws and regulations book to review licensing, liens, and contractor responsibilities.\u003c\/p\u003e\n\u003cp\u003ePractice calculations involving roof area, slope, waste, material coverage, labor, and estimating. Always identify the units and assumptions required by the question before calculating an answer.\u003c\/p\u003e\n\u003cp\u003eUse the full six-month rental and course-access period to rotate among course lessons, technical reading, practice questions, calculations, and open-book navigation exercises.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Roofing Contractor candidates combine highlighted and tabbed rental books with an organized online trade course.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review separates roofing preparation into steep-slope, membrane, metal-panel, spray polyurethane foam, substrate, repair, flashing, safety, building-code, business, licensing, and lien subjects.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation helps candidates identify the roofing system involved, select the correct manual or codebook, locate the relevant provision, and apply the information to a practical examination question.\u003c\/p\u003e\n\u003cp\u003eReference-navigation exercises build familiarity with the seven books allowed in the examination room. The highlighted and tabbed format supports organized review and faster access to major subjects during timed practice.\u003c\/p\u003e\n\u003cp\u003eThe course also supports closed-book preparation for estimating and North Carolina contractor regulations. Candidates can use the six-month access period to reinforce these areas without depending on restricted books during the examination.\u003c\/p\u003e\n\u003cp\u003eNo rental package or course can guarantee examination passage or license approval. Results depend on the candidate’s qualifications, experience, preparation, reference familiarity, and performance during the test.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in this package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes nine highlighted and tabbed rental references, the North Carolina Roofing Contractor online exam prep course, 6 months of course access, and a six-month book rental period.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $1,590, plus a $700 refundable rental-book deposit, for a total initial payment of $2,290.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhen is the $700 deposit refunded?\u003c\/h2\u003e\n\u003cp\u003eThe deposit is refunded when all rental books are returned in similar condition within 6 months from the time they are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 6 months of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the book rental period?\u003c\/h2\u003e\n\u003cp\u003eThe rental period is 6 months from the time the books are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does processing take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for the books to be highlighted, tabbed, and processed.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the books highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eYes. The included trade references are highlighted and tabbed to support organized study and navigation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the North Carolina Roofing Contractor examination open book?\u003c\/h2\u003e\n\u003cp\u003eYes. Candidates may use the seven approved exam-room references when the materials comply with current testing rules.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich books are not allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eRoofing Construction and Estimating and Laws and Regulations Applicable to General Contracting in the State of North Carolina are included for study but are not allowed in the examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow many questions are on the examination?\u003c\/h2\u003e\n\u003cp\u003eThe examination contains 60 questions.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much time is allowed?\u003c\/h2\u003e\n\u003cp\u003eCandidates have 120 minutes to complete the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat score is required to pass?\u003c\/h2\u003e\n\u003cp\u003eA score of 70 percent is required to pass.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue a license?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing satisfies the testing requirement, but the applicant must complete all financial, entity, qualifier, application, and licensing requirements before a license is issued.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Books \u0026 Courses Rental - Self Study","offer_id":45919389286453,"sku":null,"price":2295.0,"currency_code":"USD","in_stock":true},{"title":"Books \u0026 Courses Self Study + Live \u0026 Recorded Classes [+$300]","offer_id":45919389319221,"sku":null,"price":2595.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-67-NC-ROOFING-RENTAL.jpg?v=1787552508"},{"product_id":"north-carolina-residential-contractor-book-rental-package","title":"North Carolina Residential Contractor Exam - Books \u0026 Course Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Residential Contractor Exam - Books \u0026amp; Course Rental Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Residential Contractor examination with a comprehensive rental package that combines highlighted and tabbed trade references with an online exam prep course. This package is designed to support organized study across residential construction, carpentry, roofing, masonry, concrete, excavation, wood trusses, jobsite safety, erosion control, contractor regulations, business law, and project management.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Residential Contractor classification covers construction and demolition work involving residential units that must comply with the residential building code adopted by the state. It also includes related site work, driveways, sidewalks, water and wastewater systems, and qualifying specialty work performed as part of those residential projects.\u003c\/p\u003e\n\u003cp\u003eResidential contractors need a broad understanding of the construction process. Exam preparation may involve foundations, framing, roof systems, exterior finishes, interior construction, masonry, concrete, excavation, plans and specifications, estimating, safety, code administration, sedimentation control, licensing laws, contracts, and business operations.\u003c\/p\u003e\n\u003cp\u003eThis package includes the North Carolina Occupational Safety and Health Standards for the Construction Industry with the latest available amendments, the Contractor’s Guide to Business, Law and Project Management—North Carolina General Contractors Edition, 10th Edition, the 2018 North Carolina Residential Code, and the 2018 North Carolina Administrative Code and Policies. These books are included as examination-room references.\u003c\/p\u003e\n\u003cp\u003eThe rental library also includes technical and regulatory study books that are not allowed in the examination room. These references cover carpentry, building construction, roofing, masonry, excavation, concrete, metal-plate-connected wood trusses, sedimentation control, and North Carolina general contractor laws and regulations.\u003c\/p\u003e\n\u003cp\u003eAll trade reference books are highlighted and tabbed to support organized preparation. Tabs help candidates locate major subjects, while highlighting identifies important passages, tables, procedures, and terminology. Candidates should still read complete sections and practice using the references under timed conditions.\u003c\/p\u003e\n\u003cp\u003eThe package includes 6 months of course access. The North Carolina Residential Contractor online exam prep course organizes the examination material into manageable study areas and helps candidates develop technical knowledge, open-book navigation skills, and a consistent preparation schedule.\u003c\/p\u003e\n\u003cp\u003eThe package price is $1,640, plus a $650 refundable rental-book deposit, for a total initial payment of $2,290. The $650 deposit is refunded when the books are returned in similar condition within 6 months from the time they are received. Please allow 15 business days for processing.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e North Carolina Occupational Safety and Health Standards for the Construction Industry, with latest available amendments\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e North Carolina Building Code: Residential Code, 2018 Edition\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e North Carolina Administrative Code and Policies, 2018 Edition\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Carpentry and Building Construction, 2016\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Roofing Construction and Estimating, Daniel Atcheson, 1995\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Modern Masonry - Brick, Block, Stone, Clois E. Kicklighter, 10th Edition\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Pipe and Excavation Contracting\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e The Contractor’s Guide to Quality Concrete Construction, 4th Edition\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e BCSI: Guide to Good Practice for Handling, Installing, Restraining, and Bracing of Metal Plate Connected Wood Trusses, 2025\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e North Carolina Administrative Code, Title 15A, Chapter 4 Sedimentation Control, including the latest amendments\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e North Carolina General Statutes Chapter 113A, Article 4 Sedimentation Pollution Control Act of 1973\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Laws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eHighlighted and Tabbed References:\u003c\/strong\u003e Trade reference books are prepared for organized study and navigation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 6 months of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eOnline Exam Prep Course:\u003c\/strong\u003e North Carolina Residential Contractor trade preparation covering technical, code, safety, regulatory, and business subjects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRental Period:\u003c\/strong\u003e 6 months from the time the books are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $1,640\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Book Deposit:\u003c\/strong\u003e $650\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Initial Payment:\u003c\/strong\u003e $2,290\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e The $650 deposit is refunded when the books are returned in similar condition within the six-month rental period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProcessing:\u003c\/strong\u003e Please allow 15 business days for processing.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Residential Contractor examination evaluates knowledge associated with constructing, altering, improving, and demolishing residential units governed by the state residential building code. Preparation should address technical construction practices as well as contractor laws, business responsibilities, safety, plans, specifications, and project administration.\u003c\/p\u003e\n\u003cp\u003eResidential code preparation may involve foundations, floor systems, wall framing, roof framing, exterior walls, weather protection, insulation, interior finishes, stairs, guards, decks, masonry, chimneys, mechanical coordination, plumbing coordination, electrical coordination, energy-related provisions, and structural requirements.\u003c\/p\u003e\n\u003cp\u003eCarpentry preparation should include construction materials, layout, floor framing, wall framing, roof framing, openings, sheathing, fastening, stairs, exterior trim, interior finishes, and the interpretation of plans and specifications. Candidates should understand how individual framing components transfer loads through the structure.\u003c\/p\u003e\n\u003cp\u003eRoofing preparation may address roof shapes, slopes, framing, sheathing, underlayment, flashing, drainage, ventilation, roof coverings, material quantities, estimating, installation practices, and protection against water intrusion.\u003c\/p\u003e\n\u003cp\u003eMasonry preparation may include brick, concrete masonry units, mortar, grout, reinforcement, anchors, ties, flashing, weeps, control joints, expansion joints, veneer construction, chimneys, fireplaces, foundations, and material-handling practices.\u003c\/p\u003e\n\u003cp\u003eConcrete study may include materials, proportioning, forms, reinforcement, placement, consolidation, finishing, curing, joints, slabs, footings, walls, quality control, weather conditions, and common construction defects.\u003c\/p\u003e\n\u003cp\u003eExcavation and site-work preparation may involve soils, trenching, grading, drainage, pipe installation, compaction, shoring, dewatering, excavation safety, underground utilities, and coordination with foundations and wastewater systems.\u003c\/p\u003e\n\u003cp\u003eWood-truss preparation should include handling, storage, lifting, placement, temporary restraint, permanent bracing, installation sequencing, bearing, connections, and protection against damage or unauthorized field alterations.\u003c\/p\u003e\n\u003cp\u003eSafety preparation may include fall protection, ladders, scaffolds, excavations, personal protective equipment, electrical hazards, tools, material handling, housekeeping, silica exposure, cranes, and employer responsibilities.\u003c\/p\u003e\n\u003cp\u003eThe examination may also address erosion and sedimentation control. Candidates should understand the purpose of controlling sediment, protecting adjoining property and waterways, maintaining approved control measures, inspecting disturbed areas, and complying with applicable state requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Residential Contractor examination is an open-book test for the references identified as permitted in the examination room. This rental package includes four exam-room references and nine additional closed-book study references.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Occupational Safety and Health Standards for the Construction Industry supports open-book questions involving construction safety, fall protection, ladders, scaffolds, excavation, tools, personal protective equipment, electrical hazards, material handling, and employer responsibilities.\u003c\/p\u003e\n\u003cp\u003eThe Contractor’s Guide to Business, Law and Project Management—North Carolina General Contractors Edition, 10th Edition supports questions involving contracts, estimating, project management, financial controls, employment practices, safety programs, insurance, risk management, and contractor business operations.\u003c\/p\u003e\n\u003cp\u003eThe 2018 North Carolina Residential Code supports technical questions involving residential construction, structural systems, foundations, framing, roofing, exterior walls, interior construction, stairs, decks, masonry, and related code requirements.\u003c\/p\u003e\n\u003cp\u003eThe 2018 North Carolina Administrative Code and Policies supports questions involving permits, inspections, construction documents, approvals, code administration, enforcement, and the responsibilities of contractors and code officials.\u003c\/p\u003e\n\u003cp\u003eThe remaining references in this package are not allowed in the examination room. They should be used throughout the six-month rental period to build knowledge in carpentry, roofing, masonry, excavation, concrete, truss installation, sedimentation control, and contractor regulations.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing requires efficient reference navigation. Candidates should learn the structure of the permitted books, including their tables of contents, indexes, definitions, chapter headings, tables, figures, and appendices.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed format supports quicker navigation, but the candidate must still recognize the subject and choose the correct book. A residential framing question should direct the candidate to the Residential Code, while a permit question may require the Administrative Code and Policies.\u003c\/p\u003e\n\u003cp\u003eRead the complete provision before selecting an answer. Code and business requirements may contain exceptions, definitions, limitations, or related sections that affect how the rule applies.\u003c\/p\u003e\n\u003cp\u003eAll references brought into the examination room must comply with the current testing rules governing editions, binding, tabs, highlighting, markings, inserts, and loose materials.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eConfirm the Residential Contractor classification.\u003c\/strong\u003e Review the authorized scope and determine whether it matches the residential construction work the applicant intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the appropriate license limitation.\u003c\/strong\u003e Choose the limited, intermediate, or unlimited limitation based on the intended value of individual projects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the applicant entity.\u003c\/strong\u003e Determine whether the license applicant will be an individual, LLC, corporation, partnership, or another eligible entity.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesignate a qualifier.\u003c\/strong\u003e Identify the individual who will satisfy the examination requirement for the Residential Contractor classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the application.\u003c\/strong\u003e Submit the required applicant, entity, ownership, qualifier, financial, and supporting information.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide evidence of financial responsibility.\u003c\/strong\u003e Meet the financial requirement associated with the selected license limitation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the background-check requirement.\u003c\/strong\u003e Consent to or provide the criminal background information required by the Board.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e Complete the application review process and obtain authorization before scheduling the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule the examination.\u003c\/strong\u003e Follow the scheduling instructions provided after eligibility is approved.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrepare the approved books.\u003c\/strong\u003e Confirm that the exam-room references comply with the current rules for tabs, highlighting, binding, and markings.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination.\u003c\/strong\u003e Follow all identification, security, scheduling, calculator, and reference-material instructions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the licensing process.\u003c\/strong\u003e Passing the examination satisfies the testing requirement, but the applicant must complete all remaining requirements before the license is issued.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates Residential Contractor licenses. Applicants must be at least 18 years old, possess good moral character as determined by the Board, provide evidence of financial responsibility, submit the required application fee, and complete a criminal background check when required.\u003c\/p\u003e\n\u003cp\u003eA North Carolina general contractor license is required when a person or business bids on, contracts for, or undertakes a construction project valued at $40,000 or more, subject to applicable legal definitions and exceptions.\u003c\/p\u003e\n\u003cp\u003eThe Residential Contractor classification covers construction and demolition activity involving residential units that must comply with the residential building code adopted by the North Carolina Building Code Council.\u003c\/p\u003e\n\u003cp\u003eThe classification also covers site work, driveways, sidewalks, and water and wastewater systems ancillary to those residential structures, along with qualifying specialty work performed as part of the residential project.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina licenses are issued with limited, intermediate, or unlimited limitations. A limited license permits qualifying individual projects valued up to $750,000. An intermediate license permits qualifying individual projects valued up to $1,500,000. An unlimited license has no restriction on the value of an individual project.\u003c\/p\u003e\n\u003cp\u003eEach limitation has financial qualification requirements. Applicants should select a limitation that matches their intended work and submit the financial documentation or other approved evidence required for that limitation.\u003c\/p\u003e\n\u003cp\u003eThe qualifier’s examination credential and the contractor license are separate. Passing the Residential Contractor examination does not independently authorize a person or company to enter into regulated construction contracts. The license must be issued to the approved applicant entity.\u003c\/p\u003e\n\u003cp\u003eLicensed contractors must operate within the classification and limitation shown on the active license. They are also responsible for maintaining accurate entity and qualifier records, complying with permits and inspections, following safety requirements, and meeting contractual and professional obligations.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference covers construction safety, including fall protection, ladders, scaffolds, excavations, tools, electrical hazards, material handling, personal protective equipment, and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference covers business organization, contracts, estimating, financial management, project administration, employment practices, safety, insurance, and risk management.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina Building Code: Residential Code, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference contains technical requirements for qualifying residential construction, including foundations, framing, roofing, walls, stairs, decks, masonry, and related systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina Administrative Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference addresses permits, inspections, construction documents, approvals, enforcement, code administration, and contractor responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Carpentry and Building Construction, 2016\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis closed-book study reference supports preparation involving materials, layout, floors, walls, roofs, stairs, sheathing, fastening, exterior finishes, and interior construction. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Roofing Construction and Estimating, Daniel Atcheson, 1995\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis closed-book study reference covers roof systems, materials, flashing, drainage, installation methods, quantities, and estimating. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Modern Masonry - Brick, Block, Stone, Clois E. Kicklighter, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis closed-book study reference covers brick, block, stone, mortar, grout, reinforcement, flashing, joints, veneer, fireplaces, and masonry construction practices. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Pipe and Excavation Contracting\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis closed-book study reference addresses excavation, trenching, soils, grading, drainage, pipe installation, compaction, shoring, dewatering, and underground construction. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: The Contractor’s Guide to Quality Concrete Construction, 4th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis closed-book study reference covers concrete materials, forms, reinforcement, placement, consolidation, finishing, curing, joints, quality control, and common construction problems. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: BCSI: Guide to Good Practice for Handling, Installing, Restraining, and Bracing of Metal Plate Connected Wood Trusses, 2025\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis closed-book study reference covers truss storage, handling, lifting, placement, temporary restraint, permanent bracing, connections, and safe installation. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina Administrative Code, Title 15A, Chapter 4 Sedimentation Control, Including Latest Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis closed-book study reference addresses administrative requirements for sedimentation control and protection of land and water resources. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina General Statutes Chapter 113A, Article 4 Sedimentation Pollution Control Act of 1973\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis closed-book study reference contains statutory requirements related to erosion and sedimentation control. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Laws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis closed-book study reference covers classifications, limitations, qualifiers, applications, licensing requirements, conduct, liens, and contractor responsibilities. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for open-book questions involving construction safety and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for open-book questions involving business operations, contracts, estimating, project management, and risk control.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Building Code: Residential Code, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for open-book technical questions involving residential construction and code compliance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Administrative Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eUsed for open-book questions involving permits, inspections, approvals, administration, and enforcement.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eDivide preparation into residential code, carpentry, roofing, masonry, concrete, excavation, trusses, safety, sedimentation control, business law, and contractor regulations.\u003c\/p\u003e\n\u003cp\u003eUse the four exam-room references during timed open-book exercises. Read the question, identify the subject, select the correct book, locate the governing section, and review the full provision before choosing an answer.\u003c\/p\u003e\n\u003cp\u003eStudy the restricted references separately. Because they will not be available during the test, review their major concepts through course lessons, technical reading, practice questions, and repeated study.\u003c\/p\u003e\n\u003cp\u003ePractice reading plans and specifications, identifying construction sequences, reviewing material quantities, and connecting code provisions to practical residential building conditions.\u003c\/p\u003e\n\u003cp\u003eUse the six-month rental and course-access period to establish a consistent schedule. Rotate among online lessons, book study, reference searches, and focused review of weaker subjects.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Residential Contractor candidates combine highlighted and tabbed rental references with a structured online trade course.\u003c\/p\u003e\n\u003cp\u003eOrganized study guidance separates residential construction into manageable areas, including foundations, framing, roofing, masonry, concrete, excavation, trusses, safety, erosion control, business law, and contractor regulations.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review connects code requirements with practical building methods. Candidates can strengthen their understanding of how structural systems, materials, site work, safety, and project administration fit together during residential construction.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation helps candidates identify the subject of an exam question, choose the appropriate reference, locate the applicable provision, and interpret the information efficiently.\u003c\/p\u003e\n\u003cp\u003eReference-navigation practice focuses on the four books allowed in the examination room. The highlighted and tabbed format supports organized study and helps candidates become familiar with major sections before test day.\u003c\/p\u003e\n\u003cp\u003eThe online course also organizes preparation around the technical and regulatory books that are not allowed in the examination room. Candidates can use the six-month access period to review those subjects repeatedly and reduce reliance on restricted references.\u003c\/p\u003e\n\u003cp\u003eNo rental package or exam prep course can guarantee examination passage or license approval. Results depend on the candidate’s qualifications, experience, study effort, reference familiarity, and performance during the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in this package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes thirteen highlighted and tabbed rental references, the North Carolina Residential Contractor online exam prep course, and 6 months of access to the books and course materials.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $1,640, plus a $650 refundable rental-book deposit, for a total initial payment of $2,290.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhen is the $650 deposit refunded?\u003c\/h2\u003e\n\u003cp\u003eThe deposit is refunded when the rental books are returned in similar condition within 6 months from the time they are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the rental period?\u003c\/h2\u003e\n\u003cp\u003eThe book rental period is 6 months from the time the books are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 6 months of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does processing take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for processing.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the books highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eYes. The trade reference books are highlighted and tabbed to support organized study and reference navigation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich books are allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eThe safety standards, Contractor’s Guide to Business, Law and Project Management, 2018 Residential Code, and 2018 Administrative Code and Policies are included as exam-room references.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all thirteen books allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eNo. Nine books are included for closed-book study and are not allowed in the examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat does the Residential Contractor classification cover?\u003c\/h2\u003e\n\u003cp\u003eIt covers qualifying residential construction and demolition, related site work, driveways, sidewalks, ancillary water and wastewater systems, and authorized specialty work performed as part of residential projects.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue a license?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing the examination satisfies the testing requirement, but the applicant must complete all financial, application, entity, qualifier, and licensing requirements before a license is issued.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the package guarantee a passing score?\u003c\/h2\u003e\n\u003cp\u003eNo. Examination performance depends on the candidate’s experience, preparation, understanding of the material, reference-navigation skills, and performance during the test.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Books \u0026 Course Rental - Self Study","offer_id":45919389351989,"sku":null,"price":2295.0,"currency_code":"USD","in_stock":true},{"title":"Books \u0026 Course Rental - Self + Live \u0026 Recorded Classes [+$300]","offer_id":45919389384757,"sku":null,"price":2595.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-61-NC-RESIDENTIAL-RENTAL.jpg?v=1787552509"},{"product_id":"north-carolina-metal-erection-contractor-book-rental-package","title":"North Carolina Metal Erection Contractor Exam - Book Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Metal Erection Contractor Exam - Book Rental Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Metal Erection Contractor exam with a comprehensive rental package that combines highlighted and tabbed trade references with 6 months of course access. This package supports organized study across structural steel erection, high-strength bolted connections, steel joists and girders, steel decking, reinforcing bars, welding, metal roofing and cladding, fencing, construction safety, contractor regulations, and business management.\u003c\/p\u003e\n\u003cp\u003eMetal erection is a specialized construction field that requires technical knowledge, careful planning, safe handling procedures, and an understanding of how structural components are connected and stabilized. Contractors may work with structural shapes, plates, steel joists, girders, decking, reinforcing steel, fabricated assemblies, fencing, roofing panels, cladding, stairs, rails, and other metal components. Exam preparation should reflect the variety of materials, connections, procedures, and jobsite hazards involved in this work.\u003c\/p\u003e\n\u003cp\u003eThis rental package includes the North Carolina Occupational Safety and Health Standards for the Construction Industry, with the latest available amendments, and the Specification for Structural Joints Using ASTM A325 or A490 Bolts, 2004. These references are identified for exam-room use and support preparation involving construction safety, steel erection, structural stability, fall protection, rigging, high-strength bolts, joint types, pretensioning, inspection, and connected materials.\u003c\/p\u003e\n\u003cp\u003eThe package also includes several references that are not allowed in the exam room but remain important for preparation. These books address metal roofing and cladding, reinforcing-bar placement, steel joists and joist girders, steel-deck construction, welding, fencing, contractor laws, business practices, and project management. Studying these subjects before exam day helps candidates build the knowledge needed to answer questions without consulting the restricted books during the test.\u003c\/p\u003e\n\u003cp\u003eAll included books are tabbed and highlighted to support faster study and more organized reference navigation. Tabs help identify major subjects, while highlighting draws attention to important material within the references. Candidates should still read complete sections, understand the surrounding context, and practice locating information under timed conditions.\u003c\/p\u003e\n\u003cp\u003eThe package includes 6 months of course access. The trade course provides an organized study structure that complements the rental books and helps candidates review major examination subjects, practice reference navigation, strengthen trade knowledge, and build a consistent preparation schedule.\u003c\/p\u003e\n\u003cp\u003ePlease allow 15 business days for processing. The package price is $1,390, plus a $400 refundable rental-book deposit, for a total initial payment of $1,790. The $400 deposit is refunded when the books are returned in similar condition within 6 months from the time they are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e North Carolina Occupational Safety and Health Standards for the Construction Industry, with latest available amendments\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Specification for Structural Joints Using ASTM A325 or A490 Bolts, 2004\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Profiled Sheet Roofing and Cladding - A Guide to Good Practice, 3rd Edition, 1999\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Placing Reinforcing Bars\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Technical Digest No. 9 – Handling and Erection of Steel Joists and Joist Girders\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Laws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e SDI Manual of Construction with Steel Deck\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Modern Welding, 2013\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Fences \u0026amp; Retaining Walls, used copy\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTabbed and Highlighted Books:\u003c\/strong\u003e All included rental references are tabbed and highlighted for organized study.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 6 months of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $1,390\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Book Deposit:\u003c\/strong\u003e $400\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Initial Payment:\u003c\/strong\u003e $1,790\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e The $400 deposit is refunded when the books are returned in similar condition within 6 months from the time they are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProcessing:\u003c\/strong\u003e Please allow 15 business days for processing.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Metal Erection Contractor exam evaluates knowledge associated with the fabrication, handling, assembly, erection, connection, alteration, and repair of metal construction components. Preparation should cover both structural work and the safety procedures required when working with heavy materials, elevated work areas, cranes, rigging equipment, welding processes, bolted connections, and temporary structural conditions.\u003c\/p\u003e\n\u003cp\u003eSteel joists and joist girders are an important part of metal erection preparation. Candidates should study proper storage, handling, lifting, placement, bearing, alignment, bridging, temporary stability, field connections, and erection sequencing. A joist or girder may remain unstable until required bridging and connections are installed, making safe sequencing an essential part of the work.\u003c\/p\u003e\n\u003cp\u003eSteel-deck preparation should include deck identification, storage, lifting, placement, alignment, attachment, side laps, openings, temporary loading, and coordination with supporting structural steel. Candidates should understand how roof deck and floor deck are handled and why proper attachment and safe placement procedures are necessary during construction.\u003c\/p\u003e\n\u003cp\u003eHigh-strength structural bolting requires knowledge of joint types, bolt assemblies, connected materials, faying surfaces, washers, installation procedures, pretensioning, inspection, and the differences among connection requirements. Candidates should become familiar with the terminology and organization of the structural-joints specification so they can locate relevant information efficiently.\u003c\/p\u003e\n\u003cp\u003eWelding preparation may include welding processes, equipment, electrodes, joint designs, positions, symbols, cutting methods, base metals, inspection concepts, and safe work practices. Candidates should understand how welding is used to connect structural and miscellaneous metal components and how preparation, procedure, equipment, and workmanship affect the completed connection.\u003c\/p\u003e\n\u003cp\u003eAdditional exam preparation may include reinforcing-bar placement, profiled metal roofing and cladding, fencing, retaining-wall concepts, North Carolina contractor regulations, liens, business practices, contracts, project administration, estimating, safety, and risk management. These subjects reflect the varied responsibilities of a metal erection contractor.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Metal Erection Contractor exam is open book for the references identified as permitted in the exam room. This package includes two exam-room references: the North Carolina Occupational Safety and Health Standards for the Construction Industry, with the latest available amendments, and the Specification for Structural Joints Using ASTM A325 or A490 Bolts, 2004.\u003c\/p\u003e\n\u003cp\u003eThe remaining books in this package are included as study references and are not allowed in the exam room. Candidates should use them during preparation to learn the technical, legal, and business subjects associated with metal erection work. Because these books will not be available during the test, their major concepts should be reviewed repeatedly before exam day.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing requires more than owning a reference. Candidates should know which book applies to a question, where the relevant material is located, and how the publication is organized. Practice should include reviewing tables of contents, indexes, definitions, headings, tables, notes, and cross-references.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed format helps organize the books, but the candidate must still understand the question and select the correct subject. A question involving steel-erection fall protection should direct the candidate to the safety standards, while a question involving pretensioned structural bolts should direct the candidate to the structural-joints specification.\u003c\/p\u003e\n\u003cp\u003eRead complete provisions before choosing an answer. Technical requirements may contain limitations, exceptions, definitions, inspection criteria, or related procedures that affect the correct response. Avoid relying on one highlighted sentence without reviewing the surrounding section.\u003c\/p\u003e\n\u003cp\u003eCandidates should prepare all exam-room materials according to the applicable testing rules. Tabs, highlighting, binding, markings, inserts, and book condition must comply with the requirements in effect for the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eConfirm the Metal Erection classification.\u003c\/strong\u003e Review the classification scope and determine whether it matches the structural and architectural metal work the applicant intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eChoose the appropriate license limitation.\u003c\/strong\u003e Select the contractor license limitation that fits the intended size and scope of projects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the applicant.\u003c\/strong\u003e Determine whether the license will be held by an individual or an eligible business entity.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesignate the qualifier.\u003c\/strong\u003e Identify the individual who will satisfy the examination requirement for the Metal Erection classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the license application.\u003c\/strong\u003e Submit the required applicant, entity, qualifier, and supporting information through the applicable state licensing process.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide required financial information.\u003c\/strong\u003e Submit the documentation required for the selected license limitation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e Complete the application review process and obtain authorization before scheduling the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule the exam.\u003c\/strong\u003e Follow the instructions provided with the examination authorization.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrepare the permitted references.\u003c\/strong\u003e Confirm that the exam-room books comply with current rules governing tabs, highlighting, binding, and markings.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination.\u003c\/strong\u003e Follow all identification, security, scheduling, and reference-material instructions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the remaining licensing requirements.\u003c\/strong\u003e Passing the exam satisfies the testing component, but the full application must be approved before a contractor license is issued.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eNorth Carolina contractor licensing distinguishes between the examination credential held by a qualifier and the contractor license issued to an approved individual or business entity. Passing the Metal Erection examination does not by itself authorize a person or company to bid, contract, or perform work that requires an active contractor license.\u003c\/p\u003e\n\u003cp\u003eThe applicant must select the appropriate classification and license limitation, provide the required application information, identify an eligible qualifier, and satisfy the applicable financial and administrative requirements. The legal entity entering into construction contracts should match the entity shown on the approved contractor license.\u003c\/p\u003e\n\u003cp\u003eA Metal Erection Contractor should operate within the work authorized by the classification and within the project limitation shown on the active license. Contractors are also responsible for complying with applicable permits, inspections, safety standards, contract requirements, employment obligations, and other laws governing construction activity.\u003c\/p\u003e\n\u003cp\u003eChanges involving the licensed entity, business name, ownership, qualifier, or other material information should be addressed through the applicable licensing process. Maintaining accurate records and an active license is an ongoing contractor responsibility.\u003c\/p\u003e\n\u003cp\u003eContractors should also understand the difference between licensing requirements and project-specific code or safety requirements. Holding a contractor license does not replace the obligation to comply with approved plans, specifications, jobsite safety standards, inspection requirements, and contractual responsibilities.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference addresses construction safety, steel erection, fall protection, cranes, rigging, material handling, welding and cutting, ladders, scaffolds, personal protective equipment, electrical hazards, and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Specification for Structural Joints Using ASTM A325 or A490 Bolts, 2004\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference covers high-strength structural bolting, joint classifications, bolt assemblies, connected parts, faying surfaces, washers, installation, pretensioning, inspection, and connection requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Profiled Sheet Roofing and Cladding - A Guide to Good Practice, 3rd Edition, 1999\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed study reference covers profiled metal roofing and cladding, including handling, storage, layout, installation, fasteners, laps, weather protection, detailing, and construction practices. This book is not allowed in the exam room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Placing Reinforcing Bars\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed study reference addresses reinforcing-bar identification, fabrication, handling, supports, tying, spacing, placement, splices, tolerances, and field practices. This book is not allowed in the exam room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Technical Digest No. 9 – Handling and Erection of Steel Joists and Joist Girders\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed study reference covers joist and girder storage, handling, lifting, placement, bearing, bridging, temporary stability, connections, field modifications, and erection procedures. This book is not allowed in the exam room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Laws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed study reference addresses contractor classifications, license limitations, qualifiers, applications, professional responsibilities, liens, enforcement, and regulatory requirements. This book is not allowed in the exam room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: SDI Manual of Construction with Steel Deck\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed study reference covers steel-deck handling, storage, placement, alignment, attachment, side laps, openings, temporary loading, and construction practices. This book is not allowed in the exam room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed study reference covers business organization, contracts, estimating, project management, financial practices, employment responsibilities, safety, risk management, and contractor administration. This book is not allowed in the exam room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Modern Welding, 2013\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed study reference supports preparation involving welding processes, equipment, electrodes, joints, positions, symbols, cutting methods, metals, inspection concepts, and welding safety. This book is not allowed in the exam room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Fences \u0026amp; Retaining Walls, Used\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed used study reference covers fence materials, posts, rails, gates, layouts, foundations, installation methods, and related construction practices. This book is not allowed in the exam room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference is included for open-book questions involving steel erection and general construction safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSpecification for Structural Joints Using ASTM A325 or A490 Bolts, 2004\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference is included for open-book questions involving high-strength bolted structural joints.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBegin preparation by dividing the material into major subjects: steel-erection safety, general construction safety, steel joists and girders, steel decks, reinforcing bars, welding, structural bolting, metal roofing and cladding, fencing, contractor regulations, liens, and business management.\u003c\/p\u003e\n\u003cp\u003eUse the two exam-room references during timed open-book practice. This helps candidates become familiar with the books they will rely on during the test and reduces dependence on materials that are not permitted in the exam room.\u003c\/p\u003e\n\u003cp\u003eStudy the restricted books separately and review their important concepts repeatedly. Create a schedule that rotates among technical reading, course lessons, practice questions, and exam-room reference navigation.\u003c\/p\u003e\n\u003cp\u003eUse the tabs to locate major subjects, then read the highlighted material in context. Practice looking up unfamiliar terms through the index and identifying related sections that may affect the answer.\u003c\/p\u003e\n\u003cp\u003eThe included trade course provides 6 months of course access. Use that period to build consistent study habits, review each subject area, complete reference searches, and strengthen understanding of structural connections and safe erection practices.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Metal Erection Contractor candidates combine highlighted and tabbed rental books with an organized online trade course.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review connects steel members, joists, girders, decking, reinforcing bars, welded connections, bolted joints, roofing systems, fencing, and safety procedures as parts of complete metal construction projects.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation helps candidates identify the subject of a question, select the correct reference, locate the relevant provision, and apply the information to a practical situation.\u003c\/p\u003e\n\u003cp\u003eReference-navigation practice focuses on the safety standards and structural-joints specification allowed in the exam room. The highlighted and tabbed format supports faster access to major sections during study and practice.\u003c\/p\u003e\n\u003cp\u003eThe course also organizes closed-book preparation around the roofing, reinforcing-bar, joist, steel-deck, welding, fencing, legal, and business references that candidates must study before exam day.\u003c\/p\u003e\n\u003cp\u003eNo package can guarantee examination passage or license approval. Results depend on the candidate’s preparation, trade knowledge, reference familiarity, participation, and performance during the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in the book rental package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes ten highlighted and tabbed rental references, 6 months of trade-course access, and preparation materials covering technical, safety, licensing, and business subjects.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $1,390, plus a $400 refundable rental-book deposit, for a total initial payment of $1,790.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhen is the $400 deposit refunded?\u003c\/h2\u003e\n\u003cp\u003eThe deposit is refunded when the books are returned in similar condition within 6 months from the time they are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 6 months of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does processing take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for processing.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all books highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eYes. All included rental references are highlighted and tabbed to support organized preparation and reference navigation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich books are allowed in the exam room?\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Occupational Safety and Health Standards for the Construction Industry and the Specification for Structural Joints Using ASTM A325 or A490 Bolts, 2004, are included as exam-room references.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the other books allowed in the exam room?\u003c\/h2\u003e\n\u003cp\u003eNo. The roofing, reinforcing-bar, joist, steel-deck, welding, fencing, contractor-law, and business references are included for study but are not allowed in the exam room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the package include a used book?\u003c\/h2\u003e\n\u003cp\u003eYes. The included Fences \u0026amp; Retaining Walls reference is a used copy.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDo highlighting and tabs replace studying?\u003c\/h2\u003e\n\u003cp\u003eNo. Highlighting and tabs support navigation, but candidates must understand the subjects, read complete provisions, and practice using the references before exam day.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the exam automatically issue a contractor license?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing the exam satisfies the testing component, but the complete licensing application and all additional requirements must be approved before a license is issued.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this rental package guarantee a passing score?\u003c\/h2\u003e\n\u003cp\u003eNo. Exam performance depends on the candidate’s preparation, trade experience, understanding of the material, reference-navigation skills, and performance during the test.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Books \u0026 Courses Rental - Self Study","offer_id":45919389417525,"sku":null,"price":1795.0,"currency_code":"USD","in_stock":true},{"title":"Books \u0026 Courses Self Study + Live \u0026 Recorded Classes [+$200]","offer_id":45919389450293,"sku":null,"price":1995.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-55-NC-METAL-RENTAL.jpg?v=1787552511"},{"product_id":"north-carolina-masonry-construction-contractor-book-rental-package","title":"North Carolina Masonry Construction Contractor - Book Rental Package","description":"\u003cp data-end=\"684\" data-start=\"74\"\u003eThe \u003cstrong data-end=\"150\" data-start=\"78\"\u003eNorth Carolina Masonry Construction Contractor – Book Rental Package\u003c\/strong\u003e from \u003cstrong data-end=\"171\" data-start=\"156\"\u003eContractor Exam Prep\u003c\/strong\u003e is designed to support candidates preparing for the \u003cstrong data-end=\"291\" data-start=\"224\"\u003eNorth Carolina Licensing Board for General Contractors (NCLBGC)\u003c\/strong\u003e Masonry Construction Contractor license examination. This rental package includes the essential reference materials used for the North Carolina masonry contractor trade exam, covering critical topics such as masonry design and construction standards, structural masonry requirements, building code compliance, jobsite safety regulations, and North Carolina contractor administrative policies.\u003c\/p\u003e\n\u003cp data-end=\"1127\" data-start=\"686\"\u003eThese references align with the standards commonly tested on the \u003cstrong data-end=\"823\" data-start=\"751\"\u003eNorth Carolina Masonry Construction Contractor open-book examination\u003c\/strong\u003e, helping candidates quickly locate code requirements and technical standards during the exam. The materials provide the technical knowledge required for contractors specializing in \u003cstrong data-end=\"1027\" data-start=\"1005\"\u003emasonry structures\u003c\/strong\u003e, including brick, block, and other masonry systems used in commercial and residential construction.\u003c\/p\u003e\n\u003cp data-end=\"1359\" data-start=\"1129\"\u003eThis rental package offers a \u003cstrong data-end=\"1205\" data-start=\"1158\"\u003epractical and cost-effective study solution\u003c\/strong\u003e while providing the core reference materials necessary to prepare for the exam through \u003cstrong data-end=\"1358\" data-start=\"1293\"\u003eContractor Exam Prep’s structured contractor licensing training system\u003c\/strong\u003e.\u003c\/p\u003e\n\u003ch2\u003eBook Rental Package Pricing:\u003c\/h2\u003e\n\u003ch1\u003e\u003cspan style=\"color: #fc0b0b;\"\u003e$770\u003c\/span\u003e\u003c\/h1\u003e\n\u003ch4\u003e*plus $250 refundable deposit if books are returned in similar condition within 6 months from the time they are received. \u003c\/h4\u003e\n\u003ch4\u003eTotal: $1,020\u003c\/h4\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003ch2\u003e\u003cspan\u003eBook Rental Includes:\u003c\/span\u003e\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003eHighlighted and tabbed books for trade exams\u003cbr\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong data-end=\"150\" data-start=\"78\"\u003eNorth Carolina Masonry Construction Contractor\u003c\/strong\u003e trade online exam prep course \u003c\/li\u003e\n\u003cli\u003e6 month book rental period and access to courses\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cul\u003e\u003c\/ul\u003e\n\u003cul\u003e\u003c\/ul\u003e\n\u003cdiv\u003e\u003cspan style=\"color: #fa0909;\"\u003e\u003cem\u003e ***This is a special order item. Please allow 15 business days for your books to be tabbed and highlighted***\u003c\/em\u003e\u003c\/span\u003e\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cspan\u003e\u003c\/span\u003e\u003cbr\u003e\n\u003c\/div\u003e\n\u003cul\u003e\u003c\/ul\u003e\n\u003cdiv\u003e\n\u003ch2\u003e\u003cimg height=\"375\" width=\"565\" src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/book_rental_insert_1024x1024.png?v=1553610372\" alt=\"\"\u003e\u003c\/h2\u003e\n\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cdiv class=\"flex flex-col text-sm pb-25\"\u003e\u003c\/div\u003e\n\u003c\/div\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919389483061,"sku":null,"price":1025.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-49-NC-MASONRY-RENTAL.jpg?v=1787552513"},{"product_id":"north-carolina-building-contractor-book-rental-package","title":"North Carolina Building Contractor - Books \u0026 Course Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Building Contractor - Books \u0026amp; Course Rental Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Building Contractor examination with a comprehensive rental package that combines professionally highlighted and tabbed reference books with an online trade exam-prep course. This package includes the references identified for use in the examination room, additional highlighted and tabbed study books, and a structured six-month preparation period.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Building Contractor classification covers an extensive range of construction and demolition work. Candidates may need to understand commercial, industrial, institutional, and residential construction, along with associated sitework, grading, paving, parking structures, storm drainage, retaining walls, recreational facilities, athletic fields, running tracks, bleachers, and seating.\u003c\/p\u003e\n\u003cp\u003ePreparing for this examination requires candidates to work across building codes, structural concrete, masonry, accessibility, construction safety, business law, estimating, project management, code administration, and sports-field construction. The additional study references expand preparation into carpentry, roofing, excavation, concrete mixtures, post-tensioning, steel joists, steel deck, erosion control, utility safety, and North Carolina contractor regulations.\u003c\/p\u003e\n\u003cp\u003eThe exam-room books and additional study references are professionally highlighted and tabbed. Selected definitions, code provisions, tables, diagrams, formulas, administrative requirements, and business concepts are highlighted for focused review. Permanently attached tabs provide visible navigation points for major chapters, code sections, standards, and frequently reviewed subjects.\u003c\/p\u003e\n\u003cp\u003eThe included online exam-prep course helps candidates organize the large reference library into manageable study areas. Course preparation can be paired with technical reading, code navigation, calculations, mixed-reference exercises, and review of missed questions.\u003c\/p\u003e\n\u003cp\u003eThe physical books are provided as rentals for six months from the date they are received. The package also includes 6 months of course access. Candidates should begin studying promptly and protect the books throughout the rental period.\u003c\/p\u003e\n\u003cp\u003eThe package price is $2,140, plus a $1,250 refundable book deposit, for a total of $3,390 due at purchase. The deposit is refundable when the complete rental set is returned in similar condition within six months from the date the books are received.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eHighlighted and Tabbed Exam-Room Book Rentals:\u003c\/strong\u003e The eight North Carolina Building Contractor references listed in the Exam Room Approved Books section.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eHighlighted and Tabbed Study Book Rentals:\u003c\/strong\u003e Twelve additional technical and regulatory references for broader preparation outside the examination room.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Building Contractor Online Exam Prep Course:\u003c\/strong\u003e Organized trade preparation covering building codes, structural systems, accessibility, safety, business law, project management, and reference navigation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 6 months of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Rental Period:\u003c\/strong\u003e Six months from the date the books are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProfessional Highlighting:\u003c\/strong\u003e Selected definitions, code provisions, tables, formulas, diagrams, and technical concepts are marked for focused review.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePermanently Attached Tabs:\u003c\/strong\u003e Major chapters, code sections, standards, and commonly reviewed subjects are identified for more efficient navigation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eOpen-Book Preparation:\u003c\/strong\u003e Practice-oriented guidance for selecting the correct reference and locating supporting information efficiently.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $2,140\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eRefundable Book Deposit:\u003c\/strong\u003e $1,250\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eTotal Due at Purchase:\u003c\/strong\u003e $3,390\u003c\/p\u003e\n\u003cp style=\"margin-bottom: 0;\"\u003e\u003cstrong\u003eDeposit Terms:\u003c\/strong\u003e The $1,250 deposit is refundable when the complete rental-book set is returned in similar condition within six months from the date the books are received.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Building Contractor examination evaluates knowledge across technical construction, building-code compliance, structural systems, accessibility, safety, contractor business operations, code administration, and project management.\u003c\/p\u003e\n\u003cp\u003eBuilding-code preparation may include occupancy classifications, construction types, allowable building height and area, fire-resistance ratings, fire walls, fire barriers, fire-protection systems, interior finishes, means of egress, exterior walls, roof assemblies, structural requirements, special inspections, and safeguards during construction.\u003c\/p\u003e\n\u003cp\u003eMany code questions require candidates to combine multiple provisions. A question involving allowable building size may require review of the occupancy, construction type, sprinkler condition, frontage provisions, and mixed-use requirements. Candidates should practice reading table notes, exceptions, definitions, and related sections before selecting an answer.\u003c\/p\u003e\n\u003cp\u003eStructural concrete preparation may involve materials, reinforcement, cover, development length, splices, slabs, beams, columns, walls, foundations, durability, strength, inspections, and construction requirements. Candidates should learn the organization of ACI 318 and understand the relationship between its mandatory provisions and explanatory commentary.\u003c\/p\u003e\n\u003cp\u003eMasonry preparation may include masonry units, mortar, grout, reinforcement, anchors, ties, bearing, walls, columns, quality assurance, inspection, construction tolerances, and structural requirements. The masonry reference combines code requirements, specifications, and companion commentary.\u003c\/p\u003e\n\u003cp\u003eAccessibility preparation may address accessible routes, entrances, doors, maneuvering clearances, ramps, stairs, elevators, platform lifts, toilet rooms, bathing facilities, parking, seating, reach ranges, operable parts, signage, and communication features.\u003c\/p\u003e\n\u003cp\u003eConstruction-safety preparation may include personal protective equipment, fall protection, scaffolds, ladders, excavation, electrical hazards, cranes, tools, material handling, fire prevention, housekeeping, and employer responsibilities.\u003c\/p\u003e\n\u003cp\u003eBusiness and project-management preparation may cover licensing, accounting, financial statements, contracts, estimating, bidding, scheduling, insurance, employment practices, safety programs, liens, project documentation, and contractor responsibilities.\u003c\/p\u003e\n\u003cp\u003eCode-administration preparation may involve permits, plan review, inspections, certificates of occupancy, alternate materials, violations, stop-work orders, enforcement procedures, and the responsibilities of contractors, design professionals, and building officials.\u003c\/p\u003e\n\u003cp\u003eSports-field preparation may involve site selection, grading, drainage, irrigation, soil preparation, natural turf, synthetic surfaces, field layout, construction, renovation, equipment, and maintenance.\u003c\/p\u003e\n\u003cp\u003eThe additional study references support broader field knowledge involving framing, roofing, excavation, underground utilities, steel joists, steel deck, concrete mixtures, masonry installation, post-tensioning, sedimentation control, and North Carolina contractor regulations.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003ePlease allow an additional 15 business days for highlighted and tabbed trade book package orders.\u003c\/strong\u003e\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Building Contractor examination is open book. Candidates may use the references authorized for the examination when the materials comply with the current testing-center requirements.\u003c\/p\u003e\n\u003cp\u003eThe eight exam-room references in this rental package are professionally highlighted and tabbed. Candidates should become familiar with every book and learn which reference applies to each type of question.\u003c\/p\u003e\n\u003cp\u003eUse the North Carolina Building Code for general building requirements, occupancy classifications, construction types, building height and area, fire protection, means of egress, structural provisions, exterior walls, roofing, and safeguards during construction.\u003c\/p\u003e\n\u003cp\u003eUse ACI 318 for structural concrete questions and ACI 530\/530.1 for masonry questions. Use ICC A117.1 for accessibility requirements and the North Carolina Administration Code and Policies for permits, inspections, enforcement, and administrative procedures.\u003c\/p\u003e\n\u003cp\u003eUse the North Carolina Occupational Safety and Health Standards for construction-safety questions. Use the contractor business guide for licensing, accounting, contracts, estimating, project management, insurance, and business responsibilities. Use the sports-fields reference for athletic-facility planning, construction, and maintenance.\u003c\/p\u003e\n\u003cp\u003eHighlighting and tabs support navigation, but candidates should read the complete applicable section. The correct answer may depend on a definition, exception, table note, diagram, commentary provision, or cross-reference near the highlighted material.\u003c\/p\u003e\n\u003cp\u003eThe twelve additional study references are not identified as books allowed into the examination room. They should be used to develop technical understanding during preparation and left outside the testing room unless current official instructions authorize them.\u003c\/p\u003e\n\u003cp\u003eCandidates should complete final exam simulations using only the eight approved references. This creates a realistic open-book practice environment and prevents dependence on materials that will not be available during the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eReview the Building Contractor classification.\u003c\/strong\u003e Confirm that the classification matches the construction and demolition work the business intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the appropriate license limitation.\u003c\/strong\u003e Choose the monetary limitation that fits the value of projects the business plans to undertake.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the qualifier.\u003c\/strong\u003e Select the person who will satisfy the examination requirement for the applicant business.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the contractor application.\u003c\/strong\u003e Provide the requested ownership, financial, organizational, business, and qualifier information.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e Complete the Board’s application review process before scheduling the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBegin the online course.\u003c\/strong\u003e Use the course to organize building code, structural, accessibility, safety, business, and administrative subjects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStudy with the rental books.\u003c\/strong\u003e Review the highlighting and tabs, read surrounding provisions, and connect course lessons with the references.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete timed open-book exercises.\u003c\/strong\u003e Practice switching among the approved exam-room books while answering technical and business questions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule and take the examination.\u003c\/strong\u003e Follow the current candidate and testing-center instructions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the licensing process.\u003c\/strong\u003e Satisfy the financial, qualifier, organizational, classification, and limitation requirements.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReturn the rental books.\u003c\/strong\u003e Return the complete set in similar condition within six months from receipt to qualify for the refundable deposit.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates the Building Contractor classification. The classification covers commercial, industrial, institutional, and residential building construction and demolition.\u003c\/p\u003e\n\u003cp\u003eThe scope also includes parking decks, associated sitework, grading, paving of parking lots and driveways, sidewalks, gutters, storm drainage, retaining walls, accessory structures, recreational facilities, athletic fields, running tracks, bleachers, and seating.\u003c\/p\u003e\n\u003cp\u003eA North Carolina general contractor license is required for covered construction projects valued at $40,000 or more. The contractor must hold a classification that covers the work and a license limitation appropriate for the project value.\u003c\/p\u003e\n\u003cp\u003eBefore becoming eligible for examination, an applicant must submit the required application. Applicants must be at least 18 years old, possess good moral character as determined by the Board, demonstrate financial responsibility, submit the applicable fee, and consent to a criminal background check when required.\u003c\/p\u003e\n\u003cp\u003eThe applicant must identify a qualifier who has passed an examination approved by the Board. The qualifier satisfies the examination requirement for the applicant business.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina licenses are issued with limited, intermediate, or unlimited monetary limitations. The selected limitation controls the value of projects the contractor may undertake and has its own financial qualification requirements.\u003c\/p\u003e\n\u003cp\u003ePassing the examination does not automatically issue a contractor license. The applicant must complete the full licensing process and satisfy all applicable financial, business, ownership, organizational, and qualifier requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Sports Fields: Design, Construction and Maintenance, 2nd Edition, 2010\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA technical reference covering athletic-field planning, site selection, grading, drainage, irrigation, soil preparation, natural turf, synthetic surfaces, construction, renovation, and maintenance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA construction-safety reference covering personal protective equipment, fall protection, scaffolds, ladders, excavation, electrical hazards, cranes, tools, material handling, fire prevention, and employer responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Contractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contractor reference covering licensing, business organization, accounting, financial management, contracts, estimating, bidding, scheduling, insurance, employment, safety, liens, and project administration.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina Building Code: Building Code, 2018\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe primary building-code reference covering occupancy classifications, construction types, building height and area, fire protection, means of egress, structural requirements, exterior walls, roofing, and safeguards during construction.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: ACI 530\/530.1-13, Building Code Requirements and Specification for Masonry Structures and Companion Commentaries\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA structural masonry reference covering materials, reinforcement, design requirements, construction, inspections, quality assurance, specifications, and companion commentary.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: ACI 318-14, Building Code Requirements for Structural Concrete and Commentary\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA structural concrete reference covering reinforcement, slabs, beams, columns, walls, foundations, durability, strength, development, splices, inspections, and construction requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina Administration Code and Policies, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAn administrative reference covering permits, plan review, inspections, certificates of occupancy, enforcement, alternate materials, violations, and application of the state building code.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: ICC A117.1-2017, Standard for Accessible and Usable Buildings and Facilities\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAn accessibility standard covering accessible routes, entrances, doors, ramps, stairs, elevators, toilet rooms, parking, seating, reach ranges, clearances, signage, and communication features.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAdditional Highlighted and Tabbed Study Books Not Allowed into the Exam\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Technical Digest No. 9 – Handling and Erection of Steel Joists and Joist Girders\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA technical guide covering delivery, storage, handling, bridging, erection, stability, sequencing, connections, and safety for steel joists and joist girders.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Carpentry and Building Construction, 2016\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA construction reference covering foundations, framing, floors, walls, roofs, stairs, doors, windows, finishes, tools, plans, and general building methods.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Design and Control of Concrete Mixtures, 17th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA concrete reference covering materials, proportioning, strength, durability, placement, consolidation, curing, testing, quality control, and performance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Pipe and Excavation Contracting\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA field reference covering excavation, trenching, pipe installation, dewatering, bedding, backfill, compaction, equipment, estimating, safety, and project execution.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Roofing Construction and Estimating, Daniel Atcheson, 1995\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA roofing reference covering roof systems, materials, installation, flashing, ventilation, repairs, measurements, labor, estimating, and project planning.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Training and Certification of Field Personnel for Unbonded Post-Tensioning - Level 1 Field Fundamentals\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA field reference covering post-tensioning components, tendon installation, stressing, safety, inspection, repairs, handling, and quality control.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Modern Masonry: Brick, Block, Stone, Clois E. Kicklighter, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA masonry reference covering tools, materials, mortar, brick, concrete block, stone, layout, bonding, reinforcement, walls, and field techniques.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina Excavation Safety Guidelines, 2022 or Later\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA practical guide covering utility-location procedures, safe digging, markings, tolerance zones, damage prevention, emergency response, and excavator responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina Administrative Code, Title 15A, Chapter 4, Sedimentation Control, Including Latest Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAdministrative rules addressing land-disturbing activities, erosion-control plans, stabilization, inspections, enforcement, and sedimentation-control responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: North Carolina General Statutes Chapter 113A, Article 4, Sedimentation Pollution Control Act of 1973\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eState law establishing erosion and sedimentation-control requirements, enforcement authority, planning responsibilities, and pollution-prevention obligations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Laws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contractor law reference covering licensing statutes, Board rules, classifications, limitations, qualifier responsibilities, applications, renewals, disciplinary provisions, and compliance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: SDI Manual of Construction with Steel Deck\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Steel Deck Institute reference covering steel-deck products, handling, storage, erection, attachment, openings, accessories, tolerances, safety, and construction practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBegin preparation by separating the exam-room references from the study-only books. Use the complete package to build technical understanding, but complete final timed drills with only the eight approved examination references.\u003c\/p\u003e\n\u003cp\u003eStudy the North Carolina Building Code by practicing occupancy, construction type, height and area, fire-resistance requirements, means of egress, structural provisions, exterior walls, roofing, and safeguards during construction.\u003c\/p\u003e\n\u003cp\u003eUse ACI 318 and ACI 530\/530.1 for structural study. Practice identifying which standard controls each question before beginning a lookup.\u003c\/p\u003e\n\u003cp\u003eUse ICC A117.1 for accessibility preparation. Work directly with diagrams and dimensions involving accessible routes, doors, ramps, parking, toilet rooms, seating, reach ranges, and maneuvering clearances.\u003c\/p\u003e\n\u003cp\u003eUse the safety standards for fall protection, ladders, scaffolds, excavation, electrical hazards, cranes, tools, protective equipment, and material handling.\u003c\/p\u003e\n\u003cp\u003eUse the additional study references for practical review of framing, roofing, concrete mixtures, masonry methods, excavation, utility safety, post-tensioning, steel joists, steel deck, and sedimentation control.\u003c\/p\u003e\n\u003cp\u003eProtect the rental references from additional writing, torn pages, moisture, missing materials, loose inserts, and unauthorized alterations. Every book must be returned in similar condition within the six-month rental period to qualify for the refundable deposit.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Building Contractor candidates organize a large technical and business library into a practical six-month preparation plan.\u003c\/p\u003e\n\u003cp\u003eThe online course connects building-code requirements with structural concrete, masonry, accessibility, safety, code administration, sports fields, project management, and contractor business responsibilities.\u003c\/p\u003e\n\u003cp\u003eProfessionally highlighted and tabbed books help important provisions, tables, formulas, diagrams, and technical concepts stand out during review. Permanent tabs support faster access to major chapters and commonly reviewed subjects.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation encourages candidates to review course lessons, answer questions, locate supporting provisions, examine missed concepts, and repeat difficult searches.\u003c\/p\u003e\n\u003cp\u003eThe additional study books provide broader construction context, while the approved references support realistic open-book exam practice. No rental package or course can guarantee a passing score, contractor license, permit, or business outcome.\u003c\/p\u003e\n\u003cp\u003eResults depend on the candidate’s preparation, construction experience, business knowledge, financial qualifications, reference-navigation ability, application completion, and performance during the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFAQ Section\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in this rental package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes eight highlighted and tabbed exam-room references, twelve highlighted and tabbed study books, the North Carolina Building Contractor online exam-prep course, and 6 months of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is the total amount due at purchase?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $2,140, and the refundable book deposit is $1,250. The total due at purchase is $3,390.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the $1,250 deposit refundable?\u003c\/h2\u003e\n\u003cp\u003eYes. The deposit is refundable when the complete rental-book set is returned in similar condition within six months from the date the books are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the book rental period?\u003c\/h2\u003e\n\u003cp\u003eThe physical book rental period is six months from the date the books are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 6 months of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all books highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eYes. The approved exam-room books and additional study references are professionally highlighted and prepared with permanently attached tabs.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all included books allowed into the examination room?\u003c\/h2\u003e\n\u003cp\u003eNo. Only the eight books listed in the Exam Room Approved Books section are identified for use during the examination. The additional references are included for study.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the North Carolina Building Contractor examination open book?\u003c\/h2\u003e\n\u003cp\u003eYes. Candidates may use authorized references that comply with the current testing-center requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan I write in the rental books?\u003c\/h2\u003e\n\u003cp\u003eThe rental books should be protected from additional writing, loose materials, damage, missing pages, moisture, or unauthorized alterations. They must be returned in similar condition to qualify for the deposit refund.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this package guarantee a passing score or contractor license?\u003c\/h2\u003e\n\u003cp\u003eNo. Examination and licensing results depend on the candidate’s preparation, construction experience, financial qualifications, application completion, reference-navigation skills, and test-day performance.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAre you ready for the SEO metadata?\u003c\/strong\u003e\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Books \u0026 Courses Rental - Self Study","offer_id":45919389515829,"sku":null,"price":3395.0,"currency_code":"USD","in_stock":true},{"title":"Books \u0026 Courses Self Study + Live \u0026 Recorded Classes [+$300]","offer_id":45919389548597,"sku":null,"price":3695.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-43-NC-BUILDING-RENTAL.jpg?v=1787552515"},{"product_id":"north-carolina-unlimited-electrical-contractor-book-rental-package","title":"North Carolina Unlimited Electrical Contractor - Books \u0026 Course Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Unlimited Electrical Contractor - Books \u0026amp; Course Rental Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Unlimited Electrical Contractor examination with a complete rental package that combines highlighted and tabbed technical reference books with an online electrical contractor exam prep course. This package is designed for experienced electrical professionals preparing for North Carolina’s broadest regular electrical contractor classification.\u003c\/p\u003e\n\u003cp\u003eThe Unlimited classification permits a properly licensed contractor to perform electrical contracting projects without a project-value limitation. Candidates pursuing this classification must be prepared to demonstrate advanced knowledge of electrical systems, National Electrical Code requirements, fire alarm systems, calculations, electrical plans, contractor licensing law, Board rules, estimating, project management, safety, and business administration.\u003c\/p\u003e\n\u003cp\u003eThis rental package includes the National Electrical Code, NEC, 2020 Edition, and NFPA 72, National Fire Alarm and Signaling Code, 2019 Edition. These highlighted and tabbed technical references support open-book examination preparation involving services, feeders, branch circuits, motors, transformers, generators, grounding, bonding, conductor sizing, overcurrent protection, emergency systems, fire alarm systems, signaling circuits, testing, inspection, and system documentation.\u003c\/p\u003e\n\u003cp\u003eThe package also includes highlighted and tabbed rental copies of the Electrical Contractors Licensing Law, the Board’s Rules for the Implementation of the Electrical Contractors Licensing Law, and the NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition. These references support closed-book preparation involving contractor licensing, qualified-individual responsibilities, financial management, estimating, contracts, project scheduling, safety, employment practices, insurance, and business operations.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Electrical Contractor trade online exam prep course provides organized preparation across technical, calculation, plan-reading, licensing, and business subjects. The course is structured to help candidates review the material in manageable sections while practicing how to locate and apply information from the included references.\u003c\/p\u003e\n\u003cp\u003eThis package includes a 6-month book rental period and \u003cstrong\u003e6 months of course access\u003c\/strong\u003e. The rental period begins when the books are received. Candidates should use the same books throughout their preparation so the tab locations, highlighted sections, article structure, chapter organization, tables, definitions, and cross-references become familiar before the examination.\u003c\/p\u003e\n\u003cp\u003ePlease allow 15 business days for the trade reference books to be tabbed and highlighted before shipment. This preparation period is required so the rental books can be organized for efficient study and reference navigation.\u003c\/p\u003e\n\u003cp\u003eThe total purchase amount is $1,290, consisting of the $890 package price plus a $400 refundable book deposit. The $400 deposit is refundable when the rental books are returned within six months from the date they are received and are in similar condition.\u003c\/p\u003e\n\u003cp\u003eHighlighted and tabbed books are study and navigation tools. Candidates should still read complete Code sections, review exceptions, understand calculations, follow cross-references, and practice applying requirements to real electrical installations. The course and books are intended to support preparation, not replace qualifying field experience or guarantee a passing score.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e National Electrical Code, NEC, 2020 Edition, highlighted and tabbed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e NFPA 72 - National Fire Alarm and Signaling Code, 2019 Edition, highlighted and tabbed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Electrical Contractors Licensing Law, General Statutes Chapter 87, Article 4, highlighted and tabbed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e The Board’s Rules for the Implementation of the Electrical Contractors Licensing Law, Title 21, North Carolina Administrative Code, Chapter 18B, highlighted and tabbed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition, highlighted and tabbed.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eOnline Course:\u003c\/strong\u003e North Carolina Electrical Contractor trade online exam prep course.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 6 months of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Rental Period:\u003c\/strong\u003e Six months from the date the books are received.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Preparation:\u003c\/strong\u003e Please allow 15 business days for the books to be tabbed and highlighted.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $890.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Book Deposit:\u003c\/strong\u003e $400.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Due:\u003c\/strong\u003e $1,290.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e The $400 deposit is refundable when the books are returned in similar condition within six months from the date they are received.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Unlimited Electrical Contractor examination contains 100 multiple-choice questions. Candidates have a maximum of six hours to complete the examination, and a minimum score of 70 percent is required to pass.\u003c\/p\u003e\n\u003cp\u003eThe examination is administered after the North Carolina State Board of Examiners of Electrical Contractors approves the applicant. Approved candidates receive examination authorization and scheduling instructions for the testing provider.\u003c\/p\u003e\n\u003cp\u003eThe Unlimited examination evaluates technical, supervisory, calculation, plan-reading, licensing, and business knowledge needed to direct electrical contracting projects without a project-value limit.\u003c\/p\u003e\n\u003cp\u003eService and feeder preparation may include load calculations, service conductor sizing, service equipment, service disconnects, feeder demand factors, neutral loads, parallel conductors, grounding electrode conductors, transformer secondaries, voltage drop, and protection of conductors and equipment.\u003c\/p\u003e\n\u003cp\u003eBranch-circuit preparation should include conductor ampacity, continuous and noncontinuous loads, receptacle loads, lighting loads, appliance circuits, multiwire branch circuits, conductor identification, overcurrent protection, and special requirements for particular occupancies or equipment.\u003c\/p\u003e\n\u003cp\u003eMotor preparation may involve full-load current, conductor sizing, feeder sizing, overload protection, short-circuit and ground-fault protection, controllers, disconnecting means, duty ratings, multimotor installations, and proper use of NEC motor tables.\u003c\/p\u003e\n\u003cp\u003eTransformer preparation may include primary and secondary conductor sizing, overcurrent protection, separately derived systems, grounding and bonding, secondary calculations, ventilation, clearances, vault requirements, and installations within buildings.\u003c\/p\u003e\n\u003cp\u003eGrounding and bonding questions may involve grounding electrode systems, service bonding, separately derived systems, equipment grounding conductors, bonding jumpers, raceway bonding, structural metal, metal piping, objectionable current, and effective ground-fault current paths.\u003c\/p\u003e\n\u003cp\u003eRaceway and conductor questions may address conduit fill, conductor adjustment, ambient-temperature correction, terminal limitations, conductor insulation, support, bends, wet locations, physical protection, cable trays, underground installations, pull boxes, junction boxes, and conductor-pulling requirements.\u003c\/p\u003e\n\u003cp\u003eOvercurrent-protection preparation may include standard fuse and circuit-breaker ratings, conductor protection, transformer protection, tap conductors, motor circuits, selective coordination, interrupting ratings, series ratings, equipment protection, and permitted exceptions.\u003c\/p\u003e\n\u003cp\u003eSpecial-system preparation may involve emergency systems, legally required standby systems, optional standby systems, generators, fire pumps, healthcare facilities, hazardous locations, swimming pools, marinas, photovoltaic systems, energy storage systems, and electric vehicle charging equipment.\u003c\/p\u003e\n\u003cp\u003eFire alarm preparation may include control units, initiating devices, notification appliances, supervising stations, emergency communications, signaling line circuits, notification appliance circuits, power supplies, batteries, inspection, testing, maintenance, and documentation.\u003c\/p\u003e\n\u003cp\u003eElectrical plans may require candidates to interpret symbols, riser diagrams, panel schedules, feeder routes, conductor callouts, motor connections, lighting layouts, equipment ratings, and installation notes. Candidates should practice connecting plan information with the applicable NEC requirement.\u003c\/p\u003e\n\u003cp\u003eBusiness and law preparation may involve contracts, estimating, bidding, project scheduling, financial controls, employment practices, insurance, safety programs, recordkeeping, permits, inspections, license use, supervision, and listed qualified individual responsibilities.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Unlimited Electrical Contractor examination is an open-book test. Candidates may use the 2020 National Electrical Code and NFPA 72, National Fire Alarm and Signaling Code, 2019 Edition, as the technical exam-room references included in this rental package.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed 2020 NEC supports open-book questions involving services, feeders, branch circuits, motors, transformers, generators, grounding, bonding, raceways, conductor sizing, overcurrent protection, emergency systems, special occupancies, and special equipment.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed NFPA 72, 2019 Edition, supports open-book questions involving fire alarm fundamentals, initiating devices, notification appliances, supervising stations, emergency communications, pathways, system power, inspection, testing, maintenance, and documentation.\u003c\/p\u003e\n\u003cp\u003eThe Electrical Contractors Licensing Law, Board rules, and NASCLA business reference are included with the rental package for closed-book study. They are not allowed in the examination room. Candidates should study these references before test day until they can answer licensing and business questions without consulting the books.\u003c\/p\u003e\n\u003cp\u003eThe technical books should comply with current examination requirements involving binding, highlighting, notes, tabs, and added materials. Candidates should not place loose pages, removable notes, temporary tabs, or unauthorized inserts in the references.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing still requires strong reference-navigation skills. Candidates should know how to move from a question to the correct article, chapter, table, definition, exception, annex, or cross-reference without searching randomly.\u003c\/p\u003e\n\u003cp\u003eA motor-feeder problem may require several NEC sections and tables. A transformer problem may involve primary protection, secondary conductors, grounding, bonding, and separately derived system requirements. A fire alarm question may require information from both the NEC and NFPA 72.\u003c\/p\u003e\n\u003cp\u003eCandidates should practice identifying which reference controls the subject before beginning a search. Electrical installation and conductor questions generally require the NEC, while system-performance, notification, inspection, testing, and fire alarm maintenance questions may require NFPA 72.\u003c\/p\u003e\n\u003cp\u003eTimed reference practice is essential for a 100-question examination. Candidates should develop a repeatable process: identify the subject, select the correct reference, locate the governing provision, read the complete requirement, review exceptions, perform the calculation, and choose the best answer.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eReview the Unlimited classification.\u003c\/strong\u003e Understand the authority, experience qualifications, financial responsibilities, and supervisory obligations associated with the license.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDocument qualifying experience.\u003c\/strong\u003e Gather employment records, project information, and experience statements showing the required electrical work.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eObtain supervisory statements.\u003c\/strong\u003e Secure statements from individuals familiar with the applicant’s ability to supervise and direct electrical wiring and installation work.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination application.\u003c\/strong\u003e Submit the personal, employment, experience, and background information requested by the Board.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit supporting documentation.\u003c\/strong\u003e Include experience verification, supervisory statements, character references, and other required materials.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the examination fee.\u003c\/strong\u003e Include the applicable payment with the completed application.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive Board approval.\u003c\/strong\u003e The Board reviews the application and determines whether the candidate meets the Unlimited examination qualifications.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination authorization.\u003c\/strong\u003e Approved candidates receive information needed to schedule the test.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule the examination.\u003c\/strong\u003e Select an available appointment within the authorized testing period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the online course.\u003c\/strong\u003e Follow the technical, calculation, plan-reading, licensing, and business study sequence.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eUse the rental books during preparation.\u003c\/strong\u003e Practice with the highlighted and tabbed references included in the package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrepare the approved exam-room books.\u003c\/strong\u003e Confirm that the NEC and NFPA 72 references comply with the current testing rules.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination.\u003c\/strong\u003e Bring the required identification and approved references to the testing center.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the licensing process.\u003c\/strong\u003e After passing, satisfy the remaining financial, business, and listed qualified individual requirements.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReturn the rental books.\u003c\/strong\u003e Return the books within six months from the date they were received and in similar condition to qualify for the $400 deposit refund.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMaintain the license.\u003c\/strong\u003e Follow current renewal, continuing education, financial responsibility, supervision, and compliance requirements.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina State Board of Examiners of Electrical Contractors regulates the Unlimited examination and license. The Board establishes applicant qualifications, reviews experience, authorizes examinations, certifies qualified individuals, issues licenses, and enforces electrical contracting laws and rules.\u003c\/p\u003e\n\u003cp\u003eAn applicant for the Unlimited classification must document at least 9,000 hours of qualifying experience. At least 8,000 hours must be primary experience. The remaining experience may consist of primary experience, secondary experience, or a combination of both.\u003c\/p\u003e\n\u003cp\u003ePrimary experience generally includes direct work installing electrical wiring and equipment governed by the NEC or work activities directly related to those installations. Recognized experience may also include qualifying supervisory, estimating, inspection, engineering, instructional, maintenance, military, and other approved electrical work.\u003c\/p\u003e\n\u003cp\u003eUnlimited applicants must provide statements from individuals familiar with their electrical work and ability to supervise and direct electrical wiring and installation projects.\u003c\/p\u003e\n\u003cp\u003eThe Unlimited license permits electrical contracting projects regardless of project value. Unlike the Limited and Intermediate classifications, it does not impose a maximum dollar value on an individual electrical contracting project.\u003c\/p\u003e\n\u003cp\u003eThe absence of a project-value ceiling does not remove the obligation to comply with the National Electrical Code, state construction requirements, permits, inspections, workplace safety rules, contracts, and other laws governing electrical work.\u003c\/p\u003e\n\u003cp\u003eElectrical contracting must be conducted in the exact name shown on the active license. The licensed entity must maintain a listed qualified individual who is regularly on active duty and has the authority and responsibility to supervise and direct electrical contracting.\u003c\/p\u003e\n\u003cp\u003eApplicants for the Unlimited license must provide the financial responsibility or bonding documentation required for the classification. The documentation must relate to the license applicant and satisfy the Board’s licensing requirements.\u003c\/p\u003e\n\u003cp\u003ePassing the examination establishes the individual’s examination qualification but does not independently authorize electrical contracting. The appropriate license must be issued and active before regulated work is offered or performed.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: National Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed technical exam-room reference covers services, feeders, branch circuits, motors, transformers, generators, grounding, bonding, raceways, conductor sizing, overcurrent protection, emergency systems, special occupancies, and electrical equipment.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: NFPA 72 - National Fire Alarm and Signaling Code, 2019 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed technical exam-room reference covers fire alarm fundamentals, initiating devices, notification appliances, supervising stations, emergency communications, pathways, power supplies, inspection, testing, maintenance, documentation, and system performance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Electrical Contractors Licensing Law, General Statutes Chapter 87, Article 4\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference addresses Board authority, electrical contracting, license classifications, qualified individuals, license operation, prohibited conduct, enforcement, and statutory responsibilities. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: The Board’s Rules for the Implementation of the Electrical Contractors Licensing Law, Title 21, North Carolina Administrative Code, Chapter 18B\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference covers examination qualifications, experience requirements, licensing procedures, listed qualified individuals, financial responsibility, renewals, continuing education, and disciplinary requirements. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed closed-book study reference supports preparation involving business organization, contracts, estimating, financial management, project scheduling, employment practices, safety, insurance, recordkeeping, and risk management. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference is used for open-book questions involving electrical installations, calculations, services, feeders, motors, transformers, grounding, bonding, overcurrent protection, and special systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNFPA 72 - National Fire Alarm and Signaling Code, 2019 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed rental reference is used for open-book questions involving fire alarm systems, initiating devices, notification appliances, pathways, power supplies, inspection, testing, maintenance, and documentation.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eCreate a study schedule covering services, feeders, branch circuits, motors, transformers, grounding, bonding, conductor sizing, overcurrent protection, fire alarm systems, emergency systems, special occupancies, electrical plans, licensing law, Board rules, and business practices.\u003c\/p\u003e\n\u003cp\u003ePractice service, feeder, dwelling, commercial, motor, transformer, grounding, raceway, box-fill, and voltage-drop calculations. Show each step and identify the NEC table, percentage, demand factor, or rule used to reach the answer.\u003c\/p\u003e\n\u003cp\u003eUse the highlighted and tabbed 2020 NEC for timed navigation involving conductor ampacity, adjustment factors, correction factors, motor circuits, transformer protection, raceway fill, box sizing, grounding conductors, equipment ratings, and special-system requirements.\u003c\/p\u003e\n\u003cp\u003eUse the highlighted and tabbed NFPA 72, 2019 Edition, to review fire alarm system operation, pathways, initiating devices, notification appliances, supervising stations, emergency communications, testing, inspection, maintenance, and documentation.\u003c\/p\u003e\n\u003cp\u003ePractice reading lighting plans, power plans, panel schedules, one-line diagrams, risers, symbols, equipment notes, conductor callouts, and circuit information. Connect each plan detail to the applicable Code provision.\u003c\/p\u003e\n\u003cp\u003eStudy the licensing law and Board rules as closed-book subjects. Focus on Unlimited experience requirements, supervisory statements, listed qualified individuals, license operation, financial responsibility, renewals, and prohibited conduct.\u003c\/p\u003e\n\u003cp\u003eReview the NASCLA business reference for contracts, estimating, bidding, scheduling, accounting, employment practices, insurance, safety administration, project documentation, and risk management.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Unlimited Electrical Contractor candidates organize technical, calculation, plan-reading, licensing, and business subjects into a practical preparation structure.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed rental books support faster access to major NEC articles, NFPA 72 chapters, calculation tables, licensing provisions, Board rules, and contractor business topics.\u003c\/p\u003e\n\u003cp\u003eThe online course provides organized review of services, feeders, motors, transformers, generators, grounding, bonding, overcurrent protection, fire alarm systems, electrical plans, licensing requirements, and business management.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation helps candidates identify the subject of a question, choose the correct reference, locate the governing provision, complete the required calculation, and interpret the result efficiently.\u003c\/p\u003e\n\u003cp\u003eReference-navigation guidance helps students become familiar with NEC articles, NFPA 72 chapters, definitions, tables, exceptions, annexes, and cross-references. This familiarity supports more effective use of the approved books during the examination.\u003c\/p\u003e\n\u003cp\u003ePlan-reading preparation reinforces the interpretation of symbols, panel schedules, riser diagrams, equipment notes, feeder routes, and conductor callouts while connecting plan information to applicable Code provisions.\u003c\/p\u003e\n\u003cp\u003eClosed-book review helps candidates prepare for Electrical Contractors Licensing Law, Board rules, Unlimited experience qualifications, supervisory responsibilities, financial requirements, and business-management topics that cannot be referenced during the examination.\u003c\/p\u003e\n\u003cp\u003eNo course or book package can guarantee examination passage or license issuance. Results depend on the candidate’s experience, qualifications, study effort, familiarity with the references, calculation skills, plan-reading ability, supervisory knowledge, and performance during the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in this package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes five highlighted and tabbed rental reference books, the North Carolina Electrical Contractor trade online exam prep course, a six-month rental period, and 6 months of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $890, plus a $400 refundable book deposit, for a total of $1,290.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the $400 deposit refundable?\u003c\/h2\u003e\n\u003cp\u003eYes. The $400 deposit is refundable when the rental books are returned in similar condition within six months from the date they are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the book rental period?\u003c\/h2\u003e\n\u003cp\u003eThe rental period is six months from the date the books are received.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the online course available?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 6 months of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does book preparation take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for the trade books to be highlighted and tabbed before shipment.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich books are allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eThe 2020 National Electrical Code and NFPA 72, 2019 Edition, are the technical exam-room references included in this package.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the licensing law, Board rules, and NASCLA book allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eNo. These references are included for closed-book study and are not allowed in the testing room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the North Carolina Unlimited examination open book?\u003c\/h2\u003e\n\u003cp\u003eYes. Candidates may use the approved NEC and NFPA 72 references during the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow many questions are on the examination?\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Unlimited Electrical Contractor examination contains 100 multiple-choice questions.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much time is allowed?\u003c\/h2\u003e\n\u003cp\u003eCandidates have a maximum of six hours to complete the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat score is required to pass?\u003c\/h2\u003e\n\u003cp\u003eA minimum score of 70 percent is required to pass.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much experience is required?\u003c\/h2\u003e\n\u003cp\u003eApplicants must document at least 9,000 hours of qualifying experience, including at least 8,000 hours of primary experience.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs there a project-value limit for the Unlimited license?\u003c\/h2\u003e\n\u003cp\u003eNo. The Unlimited classification permits electrical contracting projects regardless of project value.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue the license?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing satisfies the examination requirement, but the applicant must complete the Board’s licensing process and meet the applicable financial, business, and listed qualified individual requirements.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919389646901,"sku":null,"price":1295.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-23-NC-UNLIMITED-ELECTRICAL-RENTAL.jpg?v=1787552520"},{"product_id":"north-carolina-limited-intermediate-electrical-contractor-ultimate-exam-prep-rental-package","title":"North Carolina Intermediate (I) Electrical Contractor Ultimate Exam Prep Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Intermediate (I) Electrical Contractor Ultimate Exam Prep Rental Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Intermediate Electrical Contractor examination with an all-in-one rental package that combines electrical reference books, an online trade course, live classes, and Application Service. This Ultimate Exam Prep Rental Package is designed for candidates who want a structured way to study electrical code, fire-alarm systems, calculations, North Carolina licensing requirements, business law, and project management.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Intermediate electrical examination requires candidates to apply technical knowledge across a wide range of subjects. Preparation may include services, feeders, branch circuits, conductor ampacity, wiring methods, overcurrent protection, grounding and bonding, motors, transformers, load calculations, fire-alarm systems, permitting, inspections, contractor licensing law, business practices, and project administration.\u003c\/p\u003e\n\u003cp\u003eThe rental package includes the National Electrical Code, NEC, 2020 Edition; NFPA 72, National Fire Alarm and Signaling Code, 2019 Edition; the Electrical Contractors Licensing Law; the Board’s Rules for implementing the licensing law; and the NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition.\u003c\/p\u003e\n\u003cp\u003eCandidates also receive 1 year of course access and access to live classes during the one-year preparation period. The course and live-class components help candidates organize study time, review major examination subjects, practice electrical calculations, strengthen reference-navigation skills, and develop a consistent method for approaching exam-style questions.\u003c\/p\u003e\n\u003cp\u003eApplication Service is included with this package. This added support helps candidates organize and prepare the information required for the North Carolina electrical contractor examination application process. Final application approval, examination eligibility, testing authorization, and license issuance remain under the authority of the North Carolina State Board of Examiners of Electrical Contractors.\u003c\/p\u003e\n\u003cp\u003eThe package price is $1,415, plus a $300 refundable rental-book deposit, for a total initial payment of $1,715. After the rental books are returned in acceptable condition, the $300 deposit is refunded within 1 year. Please allow 15 business days for processing.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e National Electrical Code, NEC, 2020 Edition rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e NFPA 72, National Fire Alarm and Signaling Code, 2019 Edition rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e Electrical Contractors Licensing Law, General Statutes Chapter 87, Article 4 rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e The Board’s Rules for the Implementation of the Electrical Contractors Licensing Law, Title 21, North Carolina Administrative Code, Chapter 18B rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book:\u003c\/strong\u003e NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition rental\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 1 year of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLive Classes:\u003c\/strong\u003e Included during the one-year course-access period.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication Service:\u003c\/strong\u003e Included with this package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $1,415\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Rental-Book Deposit:\u003c\/strong\u003e $300\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTotal Initial Payment:\u003c\/strong\u003e $1,715\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Refund:\u003c\/strong\u003e After the books are returned in acceptable condition, the $300 deposit is refunded within 1 year.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProcessing:\u003c\/strong\u003e Please allow 15 business days.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Intermediate Electrical Contractor examination is part of the licensing process administered by the North Carolina State Board of Examiners of Electrical Contractors. PSI provides the computer-based testing process for approved candidates.\u003c\/p\u003e\n\u003cp\u003eThe Intermediate classification is positioned between the Limited and Unlimited electrical contractor classifications. Candidates should review the classification scope and current project limitations before applying. The selected classification should match the electrical contracting work the candidate intends to supervise, direct, bid, and perform after licensing.\u003c\/p\u003e\n\u003cp\u003eThe examination covers technical electrical knowledge and North Carolina-specific regulatory subjects. Technical preparation may include electrical theory, wiring and protection, services, feeders, branch circuits, grounding and bonding, conductor sizing, raceways, boxes, motors, transformers, generators, special occupancies, special equipment, fire alarms, and practical calculations.\u003c\/p\u003e\n\u003cp\u003eCalculation questions require candidates to identify the correct code rule before completing the arithmetic. Common study areas include service and feeder loads, demand factors, continuous loads, conductor ampacity, temperature correction, adjustment factors, motor-circuit conductors, overcurrent protection, transformer calculations, raceway fill, box fill, voltage drop, and grounding-conductor sizing.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina regulatory topics may include license classifications, examination applications, qualified individuals, business listings, supervision, permits, inspections, renewals, continuing education, prohibited practices, and disciplinary authority. Business and project-management study may include contracts, estimating, financial management, scheduling, employment responsibilities, safety, risk management, and project administration.\u003c\/p\u003e\n\u003cp\u003eCandidates must apply to the Board and receive examination approval before scheduling with PSI. Examination approval applies to the classification identified by the Board and is subject to the authorization period stated in the candidate’s approval notice.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Intermediate Electrical Contractor examination is open book for references authorized by the Board. Candidates may consult approved reference materials during the examination when the books match the editions identified by the Board and comply with testing-center preparation requirements.\u003c\/p\u003e\n\u003cp\u003eThe National Electrical Code, NEC, 2020 Edition, is the primary technical examination reference included in this package. Candidates should become familiar with the NEC’s chapters, articles, parts, sections, tables, definitions, exceptions, informational notes, annexes, and index.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing still requires concentrated study. Candidates may not have enough time to search the entire NEC for every answer. A stronger approach is to identify the subject, choose likely article numbers or index terms, locate the applicable provision, and read the complete section before selecting an answer.\u003c\/p\u003e\n\u003cp\u003eMany electrical questions require candidates to combine multiple code provisions. A motor question may involve Article 430, conductor ampacity, overload protection, short-circuit and ground-fault protection, disconnecting means, controllers, and grounding. A service question may involve load calculations, conductor sizing, service equipment, bonding, grounding electrodes, and installation requirements.\u003c\/p\u003e\n\u003cp\u003eThe Electrical Contractors Licensing Law, the Board’s Rules, and the NASCLA Contractors’ Guide are included as closed-book study references. These books are not permitted for consultation during the examination. Candidates should study the material thoroughly and prepare to answer licensing, law, business, and project-management questions from their understanding of the subjects.\u003c\/p\u003e\n\u003cp\u003eThe package includes NFPA 72, National Fire Alarm and Signaling Code, 2019 Edition, for fire-alarm study. The North Carolina Board’s current examination reference list identifies NFPA 72, 2013 Edition, for use in the testing center. The included 2019 edition should be used as a study reference rather than carried into the examination room.\u003c\/p\u003e\n\u003cp\u003eAll materials brought to the testing center must comply with current Board and PSI rules concerning editions, binding, tabs, notes, highlighting, loose pages, inserts, and overall book condition.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eConfirm the Intermediate classification.\u003c\/strong\u003e Review the scope and project limitation associated with the North Carolina Intermediate Electrical Contractor license.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReview the examination handbook.\u003c\/strong\u003e Study the current application instructions, examination subjects, permitted references, scheduling procedures, and testing-center requirements.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDocument qualifying experience.\u003c\/strong\u003e Prepare accurate records of the electrical experience required for the Intermediate classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGather supporting statements.\u003c\/strong\u003e Obtain the character and experience statements required by the Board’s application process.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eUse the included Application Service.\u003c\/strong\u003e Organize the application information and supporting materials needed for submission to the Board.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the examination application.\u003c\/strong\u003e File the completed application and required supporting documentation with the North Carolina State Board of Examiners of Electrical Contractors.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive approval to test.\u003c\/strong\u003e The Board reviews the application and determines whether the applicant qualifies for the Intermediate examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule through PSI.\u003c\/strong\u003e Approved applicants receive eligibility information and scheduling instructions for the computer-based examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination.\u003c\/strong\u003e Follow the identification, security, reference-material, and testing procedures provided for the scheduled appointment.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete license issuance requirements.\u003c\/strong\u003e After passing, submit the new-license application, business-listing information, applicable fees, and remaining documents required for activation.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eApplicants for a North Carolina electrical contractor examination must be at least 18 years old, submit a completed application, provide the required character statements, and document qualifying electrical experience for the requested classification.\u003c\/p\u003e\n\u003cp\u003eThe Board evaluates experience gained through recognized electrical occupations and responsibilities. Creditable experience may include qualifying work performed as an electrician, electrical mechanic, foreman, superintendent, estimator, inspector, instructor, maintenance electrician, or another approved electrical position.\u003c\/p\u003e\n\u003cp\u003eExperience documentation should include accurate employment dates, job duties, hours, supervisors, and descriptions of the electrical work performed. The submitted records should demonstrate the candidate’s ability to supervise and direct electrical wiring or electrical installation work within the Intermediate classification.\u003c\/p\u003e\n\u003cp\u003eThe Board determines whether the experience and supporting information satisfy the examination requirements. Incomplete forms, missing signatures, inconsistent employment dates, or insufficient descriptions may prevent an application from being approved.\u003c\/p\u003e\n\u003cp\u003ePassing the examination does not independently authorize electrical contracting. A successful candidate must complete the license application and activation process and become properly associated with the licensed business or firm.\u003c\/p\u003e\n\u003cp\u003eElectrical contracting must be conducted under the business name approved by the Board. Licensees and qualified individuals must comply with rules governing supervision, permits, inspections, business listings, renewals, continuing education, advertisements, professional conduct, and the limits of the license classification.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: National Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental reference covers wiring and protection, wiring methods, equipment, services, feeders, branch circuits, grounding and bonding, motors, transformers, calculations, special occupancies, special equipment, and special systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: NFPA 72, National Fire Alarm and Signaling Code, 2019 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental study reference covers fire-alarm fundamentals, initiating devices, notification appliances, pathways, circuits, supervising stations, emergency communications, power supplies, inspection, testing, and maintenance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: Electrical Contractors Licensing Law, General Statutes Chapter 87, Article 4\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental study reference contains North Carolina statutes governing electrical contractor licensing, Board authority, classifications, examinations, violations, enforcement, and related legal responsibilities. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: The Board’s Rules for the Implementation of the Electrical Contractors Licensing Law, Title 21, North Carolina Administrative Code, Chapter 18B\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental study reference addresses applications, experience credit, license classifications, qualified individuals, business listings, renewals, continuing education, reciprocity, enforcement, and administrative procedures. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Book: NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis rental study reference covers business organization, licensing, contracts, estimating, bidding, financial management, project administration, employment responsibilities, safety, risk management, and North Carolina electrical contracting practices. It is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe NEC 2020 is the included open-book reference approved for the North Carolina Intermediate Electrical Contractor examination when prepared in accordance with current Board and PSI rules.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBegin by learning the organization of the NEC. Review Article 90, Article 100 definitions, Article 110 general requirements, and the structure of Chapters 1 through 9. Understanding the code’s layout helps candidates identify where general provisions end and installation-specific requirements begin.\u003c\/p\u003e\n\u003cp\u003ePractice using the NEC index with several possible search terms. Examination questions may use wording that differs from an article title. A question about conductor protection may involve ampacity, adjustment factors, temperature correction, overcurrent protection, physical damage, or another indexed subject.\u003c\/p\u003e\n\u003cp\u003eUse a consistent process for calculations. Identify the known values, locate the controlling code section, select the proper formula or table, maintain consistent units, complete the arithmetic, and compare the result with applicable limitations and exceptions.\u003c\/p\u003e\n\u003cp\u003eStudy grounding and bonding as a complete safety system. Review service bonding, grounding electrodes, grounding electrode conductors, equipment grounding conductors, bonding jumpers, separately derived systems, and effective ground-fault current paths.\u003c\/p\u003e\n\u003cp\u003eComplete separate study sessions for motors, transformers, services, feeders, branch circuits, fire-alarm systems, and special occupancies. These subjects often require candidates to combine multiple articles or tables before reaching the final answer.\u003c\/p\u003e\n\u003cp\u003eUse the included course and live classes to maintain a consistent preparation schedule throughout the one-year access period. Combine course review with timed NEC searches, calculation practice, closed-book licensing review, and repeated work with the rental references.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Intermediate Electrical Contractor candidates combine rental books, an online trade course, live classes, and Application Service into one organized preparation package.\u003c\/p\u003e\n\u003cp\u003eOrganized study guidance helps divide the examination into manageable areas, including electrical theory, NEC navigation, calculations, grounding and bonding, services, feeders, motors, transformers, fire alarms, licensing law, Board rules, and business management.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review connects code requirements to practical electrical installations. Candidates can study how conductors, raceways, overcurrent protection, grounding, equipment, controls, and system loads work together instead of memorizing disconnected code sections.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation supports a repeatable problem-solving method. Candidates learn to identify what a question is asking, choose the appropriate reference, locate the controlling provision, complete the required calculation, and confirm the answer.\u003c\/p\u003e\n\u003cp\u003eReference-navigation practice helps candidates become familiar with NEC articles, indexes, tables, definitions, exceptions, and cross-references. The live classes provide an additional way to review difficult subjects and reinforce the structured material available through the online course.\u003c\/p\u003e\n\u003cp\u003eApplication Service adds support for organizing the examination-application process. The rental arrangement provides access to the listed study materials, and the refundable deposit is returned after the books are received in acceptable condition according to the package terms.\u003c\/p\u003e\n\u003cp\u003eContractor Exam Prep supports realistic, confidence-building preparation without guaranteeing a passing score, application approval, license issuance, or examination outcome. Results depend on the candidate’s experience, study, calculation ability, code knowledge, reference familiarity, and performance during the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in the Ultimate Exam Prep Rental Package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes five rental references, 1 year of course access, live classes during the one-year access period, and Application Service.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $1,415, plus a $300 refundable rental-book deposit, for a total initial payment of $1,715.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhen is the $300 deposit refunded?\u003c\/h2\u003e\n\u003cp\u003eAfter the rental books are returned in acceptable condition, the $300 deposit is refunded within 1 year.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 1 year of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre live classes included?\u003c\/h2\u003e\n\u003cp\u003eYes. Live classes are included during the one-year course-access period.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs Application Service included?\u003c\/h2\u003e\n\u003cp\u003eYes. Application Service is included with the Ultimate package.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does processing take?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for processing.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all rental books allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eNo. The Electrical Contractors Licensing Law, the Board’s Rules, and the NASCLA contractor guide are closed-book study references and are not allowed in the examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs NFPA 72, 2019 Edition approved for the exam room?\u003c\/h2\u003e\n\u003cp\u003eNo. The package includes NFPA 72, 2019 Edition, for study. The current North Carolina examination reference list identifies NFPA 72, 2013 Edition, for examination-room use.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue the license?\u003c\/h2\u003e\n\u003cp\u003eNo. Successful candidates must complete the Board’s new-license application, business-listing, fee, and activation requirements after passing.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the package guarantee a passing score?\u003c\/h2\u003e\n\u003cp\u003eNo. Examination performance depends on the candidate’s experience, preparation, calculation skills, code knowledge, reference-navigation ability, and performance during the test.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919393120309,"sku":null,"price":1720.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-19-NC-INTERMEDIATE-ELECTRICAL-ULTIMATE.jpg?v=1787552612"},{"product_id":"north-carolina-intermediate-electrical-contractor-exam-book-rental","title":"North Carolina Intermediate (I) Electrical Contractor Exam Book Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Intermediate (I) Electrical Contractor Exam Book Rental Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Intermediate Electrical Contractor examination with a complete book rental and online trade-course package built around electrical code, fire-alarm systems, licensing law, Board rules, business management, and project administration. This package combines the listed references with 6 months of course access to help candidates organize technical study, strengthen code-navigation skills, practice electrical calculations, and review North Carolina contractor requirements.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Intermediate electrical examination requires candidates to apply practical electrical knowledge across a wide range of subjects. Preparation may include services, feeders, branch circuits, conductor sizing, raceway systems, grounding and bonding, overcurrent protection, motors, transformers, load calculations, special systems, fire alarms, permits, inspections, licensing responsibilities, and contractor business practices.\u003c\/p\u003e\n\u003cp\u003eThe rental format gives candidates temporary access to the listed exam-preparation references without requiring them to purchase every book permanently. The package includes the National Electrical Code, NEC, 2020 Edition; NFPA 72, National Fire Alarm and Signaling Code, 2019 Edition; the North Carolina Electrical Contractors Licensing Law; the Board’s Rules for implementing that law; and the NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition.\u003c\/p\u003e\n\u003cp\u003eThe included trade course provides 6 months of course access. Candidates can use the course to build a structured study schedule, review technical topics, practice reference navigation, and work through calculation-based preparation. The course is designed to complement the rental books and help candidates develop a consistent approach to reading questions, identifying the controlling subject, locating the appropriate reference, and confirming a supported answer.\u003c\/p\u003e\n\u003cp\u003eThe National Electrical Code is the primary technical reference in the package. NFPA 72 supports fire-alarm and signaling-system study. The licensing law, Board rules, and NASCLA guide support preparation for North Carolina legal, regulatory, business, and project-management subjects. The licensing and business references are included for study but are not allowed in the examination room.\u003c\/p\u003e\n\u003cp\u003ePlease allow 15 business days for processing this rental package. The package price is $920, plus a $300 refundable book deposit. After the rental books are returned in acceptable condition, the $300 deposit is refunded within 6 months.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e National Electrical Code, NEC, 2020 Edition\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e NFPA 72, National Fire Alarm and Signaling Code, 2019 Edition\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Electrical Contractors Licensing Law, General Statutes Chapter 87, Article 4\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e The Board’s Rules for the Implementation of the Electrical Contractors Licensing Law, Title 21, North Carolina Administrative Code, Chapter 18B\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTrade Course:\u003c\/strong\u003e 6 months of course access\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $920\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eRefundable Book Deposit:\u003c\/strong\u003e $300\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeposit Return:\u003c\/strong\u003e After the books are returned in acceptable condition, the $300 deposit is refunded within 6 months.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProcessing:\u003c\/strong\u003e Please allow 15 business days.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Intermediate Electrical Contractor examination is administered for the North Carolina State Board of Examiners of Electrical Contractors. The Board regulates electrical contractor examinations, license classifications, qualified individuals, business listings, renewals, continuing education, and compliance with North Carolina electrical contracting laws and rules.\u003c\/p\u003e\n\u003cp\u003eThe Intermediate classification is positioned between the Limited and Unlimited electrical contractor classifications. It authorizes electrical contracting within the project limitation established for the Intermediate license. Candidates should understand the scope of the classification before applying for the examination or accepting work under an issued license.\u003c\/p\u003e\n\u003cp\u003eThe examination evaluates whether a candidate has the knowledge required to supervise and direct electrical wiring and installation work within the Intermediate classification. Technical subjects may include the National Electrical Code, electrical theory, calculations, wiring methods, fire-alarm systems, equipment, plans, permits, inspections, and practical installation requirements.\u003c\/p\u003e\n\u003cp\u003eNEC preparation may include branch circuits, feeders, services, conductor ampacity, temperature correction, adjustment factors, overcurrent protection, grounding and bonding, raceway fill, box fill, motors, transformers, generators, special occupancies, special equipment, emergency systems, and related electrical installations.\u003c\/p\u003e\n\u003cp\u003eCalculation questions may require candidates to identify the correct NEC section before performing the calculation. Candidates should practice service and feeder loads, conductor sizing, demand factors, motor circuits, transformer calculations, raceway fill, voltage drop, grounding conductors, continuous loads, and overcurrent-protection requirements.\u003c\/p\u003e\n\u003cp\u003eFire-alarm preparation may include initiating devices, notification appliances, system circuits, pathways, power supplies, supervising stations, testing, inspection, maintenance, and emergency communications. NFPA 72, 2019 Edition, is included in the rental package as the fire-alarm and signaling-system study reference.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina licensing and business subjects may include license classifications, qualified individuals, business listings, applications, renewals, permits, inspections, professional conduct, contracts, estimating, financial management, project administration, safety, risk management, and employment responsibilities.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Intermediate Electrical Contractor examination is open book for technical references approved by the Board. Candidates may consult authorized code books during the examination when those books comply with the current examination rules.\u003c\/p\u003e\n\u003cp\u003eThe National Electrical Code, NEC, 2020 Edition, is the primary open-book technical reference included in this rental package. Candidates should learn how the NEC is organized into chapters, articles, parts, sections, tables, definitions, exceptions, informational notes, annexes, and an index.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing still requires strong preparation. Candidates may not have enough time to search the entire NEC for every answer. A more effective method is to identify the central subject, choose likely article numbers or index terms, locate the controlling section, and read the complete requirement before selecting an answer.\u003c\/p\u003e\n\u003cp\u003eMany electrical questions require information from more than one article. A motor question may involve Article 430, conductor requirements, overcurrent protection, disconnecting means, controllers, and grounding. A service question may involve load calculations, conductor sizing, bonding, grounding, equipment ratings, and service-installation requirements.\u003c\/p\u003e\n\u003cp\u003eThe Electrical Contractors Licensing Law, the Board’s Rules, and the NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition are not allowed in the examination room. These books are included as closed-book study references. Candidates should review their content before test day and prepare to answer related questions without consulting the books during the examination.\u003c\/p\u003e\n\u003cp\u003eReference materials carried into the examination must comply with the Board’s rules for approved editions, binding, tabs, highlighting, markings, inserts, loose pages, and book condition. Candidates should prepare the NEC only in ways permitted by the examination requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eConfirm the Intermediate classification.\u003c\/strong\u003e Review the scope and project limitation associated with the North Carolina Intermediate Electrical Contractor license.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReview the examination requirements.\u003c\/strong\u003e Study the current application instructions, examination subjects, approved references, and testing rules.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDocument qualifying experience.\u003c\/strong\u003e Prepare accurate records showing the electrical experience required for the Intermediate classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide required character statements.\u003c\/strong\u003e Submit the references or character statements required as part of the examination application.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmit the examination application.\u003c\/strong\u003e Complete the Board’s application with the required experience information, supporting documentation, and applicable fees.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination approval.\u003c\/strong\u003e The Board reviews the application and determines whether the candidate is eligible to test.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSchedule the examination.\u003c\/strong\u003e Follow the instructions provided after approval to arrange the computer-based examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrepare the approved reference.\u003c\/strong\u003e Confirm that the NEC edition and any authorized materials comply with examination-center rules.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the examination.\u003c\/strong\u003e Take the Intermediate Electrical Contractor examination and earn the passing score required by the Board.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the license activation process.\u003c\/strong\u003e Submit the new-license application, business-listing information, fees, and remaining documentation required after passing.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eApplicants for a North Carolina electrical contractor examination must be at least 18 years old, submit a properly completed application, provide the required statements concerning good character, and satisfy the qualifying electrical experience requirements for the requested classification.\u003c\/p\u003e\n\u003cp\u003eThe Board recognizes electrical experience obtained through approved occupations and responsibilities. Creditable experience may include qualifying work performed as an electrician, electrical mechanic, foreman, superintendent, estimator, electrical inspector, instructor, maintenance electrician, or another electrical position recognized by the Board.\u003c\/p\u003e\n\u003cp\u003eExperience records should include accurate employment dates, job duties, hours, supervisors, and descriptions of the electrical work performed. The submitted information should demonstrate experience relevant to supervising and directing electrical installations within the Intermediate classification.\u003c\/p\u003e\n\u003cp\u003eThe Board determines whether the applicant’s documented experience satisfies the examination requirement. Incomplete forms, unsupported work claims, missing signatures, or unclear descriptions may delay examination approval.\u003c\/p\u003e\n\u003cp\u003ePassing the examination does not independently authorize electrical contracting. A successful candidate must complete the license application and activation process and become properly listed with the applicable business or firm before performing regulated work.\u003c\/p\u003e\n\u003cp\u003eLicensed electrical contracting must be conducted under the business name approved by the Board. Licensees and qualified individuals must comply with rules governing supervision, permits, inspections, business listings, renewals, continuing education, advertising, professional conduct, and the limits of the issued classification.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: National Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe primary technical reference for electrical installations, including wiring and protection, wiring methods, equipment, services, feeders, branch circuits, grounding and bonding, motors, transformers, calculations, special occupancies, special equipment, and special systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: NFPA 72, National Fire Alarm and Signaling Code, 2019 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA technical study reference covering fire-alarm fundamentals, initiating devices, notification appliances, circuits, pathways, supervising stations, emergency communications, power supplies, inspection, testing, and maintenance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Electrical Contractors Licensing Law, General Statutes Chapter 87, Article 4\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA closed-book study reference containing North Carolina statutes governing electrical contractor licenses, examinations, classifications, Board authority, violations, enforcement, and related legal responsibilities. This book is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: The Board’s Rules for the Implementation of the Electrical Contractors Licensing Law, Title 21, North Carolina Administrative Code, Chapter 18B\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA closed-book study reference addressing applications, experience credit, classifications, qualified individuals, business listings, renewals, continuing education, reciprocity, enforcement, and administrative procedures. This book is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contractor-focused study reference covering business organization, licensing, contracts, estimating, bidding, project management, financial management, employment obligations, safety, risk management, and North Carolina electrical contracting practices. This book is not allowed in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe NEC is the primary open-book technical reference included in this package for the North Carolina Intermediate Electrical Contractor examination.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBegin by learning the organization of the NEC. Review Article 90, Article 100 definitions, Article 110 general requirements, and the structure of Chapters 1 through 9. Understanding the organization helps candidates identify where general provisions end and equipment-specific requirements begin.\u003c\/p\u003e\n\u003cp\u003ePractice using the NEC index with different search terms. Examination wording may not match an article title. A question about protecting a conductor may involve ampacity, overcurrent protection, adjustment factors, temperature correction, physical damage, or another indexed term.\u003c\/p\u003e\n\u003cp\u003eUse a consistent process for calculations. Identify the information provided, locate the controlling code section, select the correct formula or table, keep units organized, and verify the result against applicable limitations and exceptions.\u003c\/p\u003e\n\u003cp\u003eStudy grounding and bonding as a complete safety system. Review service bonding, grounding electrodes, grounding electrode conductors, equipment grounding conductors, bonding jumpers, separately derived systems, and effective ground-fault current paths.\u003c\/p\u003e\n\u003cp\u003eReview motors, transformers, services, feeders, and branch circuits through repeated practice. These topics often require candidates to combine calculations with multiple code provisions.\u003c\/p\u003e\n\u003cp\u003eSet aside separate study sessions for the closed-book references. Review licensing classifications, qualified individuals, business listings, permits, inspections, contracts, estimating, financial management, project administration, safety, employment practices, and Board enforcement authority.\u003c\/p\u003e\n\u003cp\u003eThe included trade course provides 6 months of course access for organized preparation. Use the course with the rental references to build a weekly study plan, complete technical review, practice calculations, and strengthen code-navigation skills.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Intermediate Electrical Contractor candidates combine rental books and online course preparation into one organized study package. Candidates receive access to the listed technical, regulatory, and business references along with 6 months of course access.\u003c\/p\u003e\n\u003cp\u003eOrganized study guidance helps divide the examination into manageable areas, including NEC navigation, electrical theory, calculations, grounding and bonding, services, feeders, motors, transformers, fire-alarm systems, licensing law, Board rules, and business management.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review connects code requirements to practical electrical installations. Candidates can study how conductors, raceways, overcurrent protection, grounding, controls, equipment, and system loads work together.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation supports a repeatable problem-solving method. Candidates can learn to identify what a question is asking, locate the appropriate reference, select the correct calculation process, and confirm the answer using the applicable code provision.\u003c\/p\u003e\n\u003cp\u003eReference-navigation practice helps candidates become more familiar with NEC articles, indexes, tables, definitions, exceptions, and cross-references. The course also supports preparation for closed-book subjects by organizing major North Carolina licensing and business concepts.\u003c\/p\u003e\n\u003cp\u003eThe rental structure provides access to the listed books during the study period, while the refundable deposit encourages the timely return of the materials in acceptable condition. After the books are returned in acceptable condition, the $300 deposit is refunded within 6 months.\u003c\/p\u003e\n\u003cp\u003eContractor Exam Prep supports realistic, confidence-building preparation without guaranteeing a passing score, license approval, or examination result. Candidate outcomes depend on experience, study, calculation skills, code knowledge, reference familiarity, and performance during the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in the rental package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes rental access to the NEC 2020, NFPA 72 2019, North Carolina Electrical Contractors Licensing Law, the Board’s Rules, and the NASCLA Contractors’ Guide to Business, Law, and Project Management: North Carolina Electrical Edition. It also includes 6 months of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $920, plus a $300 refundable book deposit.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhen is the $300 deposit refunded?\u003c\/h2\u003e\n\u003cp\u003eAfter the rental books are returned in acceptable condition, the $300 deposit is refunded within 6 months.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the online trade-course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 6 months of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does the package take to process?\u003c\/h2\u003e\n\u003cp\u003ePlease allow 15 business days for processing.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the North Carolina Intermediate Electrical Contractor exam open book?\u003c\/h2\u003e\n\u003cp\u003eYes. Approved technical references may be used during the examination when they comply with the Board’s current examination rules.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all rental books allowed in the examination room?\u003c\/h2\u003e\n\u003cp\u003eNo. The Electrical Contractors Licensing Law, the Board’s Rules, and the NASCLA contractor guide are closed-book study references and are not allowed in the examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat subjects are covered in the course?\u003c\/h2\u003e\n\u003cp\u003eThe course supports preparation involving NEC navigation, electrical calculations, services, feeders, branch circuits, grounding and bonding, motors, transformers, fire alarms, licensing law, Board rules, business practices, and project management.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue a license?\u003c\/h2\u003e\n\u003cp\u003eNo. Successful candidates must complete the Board’s license application, business-listing, fee, and activation requirements after passing the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this rental package guarantee a passing score?\u003c\/h2\u003e\n\u003cp\u003eNo. Examination performance depends on the candidate’s experience, preparation, calculation ability, code-navigation skills, knowledge of North Carolina requirements, and performance during the test.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45919393153077,"sku":null,"price":1295.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026_NEW_PRODUCTS-3-NC-INTERMEDIATE-ELECTRICAL-RENTAL.jpg?v=1787552613"},{"product_id":"north-carolina-water-purification-and-sewage-disposal-contractor-book-package","title":"North Carolina Water Purification and Sewage Disposal Contractor Exam Book Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Water Purification and Sewage Disposal Contractor Exam Book Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Water Purification and Sewage Disposal Contractor examination with a comprehensive collection of exam-room references and supporting study books. This package brings together materials covering construction safety, public water-supply regulations, excavation practices, contractor business and law, sedimentation control, pipe and excavation work, concrete design, shotcrete, reinforcing steel, formwork, and North Carolina contractor licensing requirements.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Water Purification and Sewage Disposal Contractor Exam Book Package includes two references identified for use in the examination room and ten additional publications intended for study outside the testing center. The exam-room books focus on construction safety and North Carolina water-supply regulations. The supporting references provide broader technical, business, environmental, structural, and regulatory knowledge connected with water-treatment and sewage-disposal construction.\u003c\/p\u003e\n\u003cp\u003eWater purification and sewage disposal projects can involve excavation, underground utilities, reinforced concrete structures, formwork, shotcrete, treatment equipment, environmental controls, site safety, and contractor administration. Candidates preparing for this classification should understand how these subjects work together during the planning and construction of water and wastewater facilities.\u003c\/p\u003e\n\u003cp\u003eThis package supports a two-part preparation strategy. Use the full collection to study trade concepts, contractor responsibilities, construction methods, and state requirements. At the same time, practice navigating the two references permitted in the exam room so you can locate safety standards and water-supply provisions efficiently during an open-book examination.\u003c\/p\u003e\n\u003cp\u003eOwning the correct references is only one part of preparation. Candidates should read the materials, learn industry terminology, understand the location of major topics, and practice answering questions under timed conditions. Strong preparation combines technical knowledge with the ability to identify the proper book and find the applicable section without unnecessary searching.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eTwo exam-room references:\u003c\/strong\u003e Includes the North Carolina construction safety standards and the state water-supply regulations identified for use during the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTen supporting study books:\u003c\/strong\u003e Includes references covering excavation, business and law, sedimentation control, pipe construction, concrete, shotcrete, reinforcing bars, formwork, and contractor regulations.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTrade-focused preparation:\u003c\/strong\u003e Supports review of treatment-facility construction, sitework, structural concrete, underground piping, safety, environmental protection, and project administration.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eOpen-book reference practice:\u003c\/strong\u003e Allows candidates to become familiar with the books available during the examination while using the broader collection for subject development.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina-specific study support:\u003c\/strong\u003e Includes state regulations addressing water supplies, sedimentation control, contractor business practices, and licensing responsibilities.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003cp\u003eThe inclusion of a book in this package does not automatically mean it may be taken into the examination room. Only the two references listed in the Exam Room Approved Books section should be prepared for exam-day use. The remaining books are included for study and must remain outside the testing center.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Water Purification and Sewage Disposal Contractor examination is associated with contractor work involving facilities and systems used for water purification and sewage treatment or disposal. Candidates should prepare for a combination of technical construction topics, safety requirements, state regulations, environmental responsibilities, and contractor business knowledge.\u003c\/p\u003e\n\u003cp\u003eImportant preparation areas may include treatment-plant construction, underground piping, excavation, grading, structural concrete, reinforcing steel, formwork, shotcrete, site safety, erosion and sedimentation control, contractor law, project management, and licensing responsibilities. The exact emphasis of individual questions may vary, so candidates should build a balanced understanding across the full reference collection.\u003c\/p\u003e\n\u003cp\u003eThe two books allowed into the exam room support major regulatory and safety topics. The North Carolina Occupational Safety and Health Standards for the Construction Industry addresses worker protection and construction-site hazards. North Carolina Administrative Code Title 15A, Subchapter 18C addresses state requirements for public water supplies.\u003c\/p\u003e\n\u003cp\u003eThe additional study books support subjects that may require knowledge even though the related publications cannot be brought into the examination room. These areas include excavation notification, pipe construction, concrete proportioning, shotcrete placement, reinforcing bars, formwork, sedimentation control, contractor business practices, and North Carolina licensing law.\u003c\/p\u003e\n\u003cp\u003eCandidates should study the complete collection before the examination and avoid depending solely on the two permitted references. An open-book test still requires trade knowledge, subject recognition, and the ability to interpret technical information accurately.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Water Purification and Sewage Disposal Contractor examination is an open-book test. Candidates may bring the approved references into the testing center when the books comply with the current examination rules.\u003c\/p\u003e\n\u003cp\u003eThis package contains two exam-room references and ten books that are included for study only. Candidates should clearly separate the books before exam day and bring only the permitted materials to the testing center.\u003c\/p\u003e\n\u003cp\u003eThe construction safety standards should be used for questions involving worker protection, excavation hazards, access, equipment operation, personal protective equipment, concrete construction, scaffolds, fall protection, confined spaces, hazardous atmospheres, and other jobsite requirements.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina water-supply regulations should be used for questions involving public water systems, treatment facilities, source protection, design or operational requirements, distribution considerations, construction standards, monitoring responsibilities, and regulatory compliance.\u003c\/p\u003e\n\u003cp\u003eOpen-book preparation should include repeated navigation practice. Learn the tables of contents, indexes, section numbering, headings, definitions, appendices, and technical terminology used in both permitted references. A candidate who understands where information is located can use the examination time more effectively than someone searching the books for the first time.\u003c\/p\u003e\n\u003cp\u003eBefore the examination appointment, inspect the approved books carefully. Remove loose papers, detachable notes, temporary flags, unauthorized inserts, and other materials prohibited by the current testing rules. Testing-center personnel make the final decision regarding whether a reference is acceptable for exam-room use.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eReview the classification scope.\u003c\/strong\u003e Confirm that the Water Purification and Sewage Disposal classification corresponds with the work the applicant or contracting business intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the required application.\u003c\/strong\u003e Submit the requested information to the North Carolina Licensing Board for General Contractors.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the qualifier.\u003c\/strong\u003e The applicant must designate the individual who will satisfy the examination requirement for the classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the appropriate license limitation.\u003c\/strong\u003e Choose the limitation that matches the size and scope of the projects the business plans to undertake.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide supporting documentation.\u003c\/strong\u003e Submit the business, organizational, financial, qualifier, and other information required during the application process.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e Approved candidates receive instructions for registering and scheduling the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrepare with the complete reference package.\u003c\/strong\u003e Study the supporting books and practice navigating the two exam-room references.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTake the examination.\u003c\/strong\u003e Bring the required identification and only the books and materials permitted by the current testing rules.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete remaining licensing requirements.\u003c\/strong\u003e Follow the Board’s instructions concerning examination results, application completion, and license issuance.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003cp\u003ePassing the examination is one part of the contractor licensing process. It does not automatically issue a license. The applicant must complete all applicable application, qualifier, organizational, financial, and administrative requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates contractor classifications and license limitations in the state. Applicants pursuing the Water Purification and Sewage Disposal classification must follow the Board’s application and examination procedures and identify the individual who will serve as the qualifier.\u003c\/p\u003e\n\u003cp\u003eThe qualifier is the person who satisfies the examination requirement connected with the classification. The contractor license is issued to the approved individual or business entity after the Board confirms that all applicable requirements have been completed.\u003c\/p\u003e\n\u003cp\u003eWater purification and sewage disposal construction may involve treatment plants, tanks, basins, piping systems, pumping facilities, structural concrete, excavation, grading, process-related structures, and associated site improvements. Contractors should understand the boundaries of their classification and coordinate work requiring other licensed trades when necessary.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina contractor licenses are issued under limitations that affect the size of projects a licensee may undertake. Applicants must select the appropriate limitation and provide the financial or bonding information required for that level.\u003c\/p\u003e\n\u003cp\u003eContractors performing this work must also account for construction safety, sedimentation control, utility conflicts, excavation notification, environmental protection, project documentation, and compliance with applicable water-supply or sewage-disposal regulations.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Water Purification and Sewage Disposal Contractor Exam Book Package includes the following exam-room and supporting study references:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers construction safety requirements relevant to treatment facilities, excavation, piping, concrete work, reinforcing steel, formwork, equipment operation, confined spaces, fall protection, personal protective equipment, and worker safety.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Administrative Code Title 15A, Subchapter 18C: Water Supplies, Including the Latest Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eContains North Carolina regulations governing public water supplies. Topics may include system requirements, water sources, treatment, construction, distribution, operation, monitoring, compliance, and regulatory responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Excavation Safety Guidelines, 2022 or Later\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eSupports study of excavation notification, utility-location requests, proposed excavation markings, underground facility protection, damaged utilities, safe-digging practices, and contractor responsibilities before and during excavation.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers business organization, contracts, estimating, project management, financial management, insurance, risk, employment practices, liens, safety administration, and North Carolina contractor responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Administrative Code, Title 15A, Chapter 4 Sedimentation Control, Including the Latest Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAddresses administrative requirements connected with land-disturbing activities, erosion-control plans, stabilization, runoff management, inspections, enforcement, and sedimentation-control responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina General Statutes Chapter 113A, Article 4 Sedimentation Pollution Control Act of 1973\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides the statutory framework for sedimentation-pollution control in North Carolina, including regulatory authority, required plans, prohibited conduct, enforcement, and responsibilities related to land disturbance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides practical information about underground pipe construction, estimating, trenching, excavation, equipment, productivity, dewatering, bedding, pipe placement, backfill, compaction, and project planning.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesign and Control of Concrete Mixtures, 17th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers concrete materials, mixture proportioning, cementitious systems, aggregates, admixtures, water-cement relationships, durability, testing, quality control, and performance considerations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGuide to Shotcrete, 2022\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAddresses shotcrete materials, mixture design, equipment, preparation, placement, application methods, curing, inspection, testing, quality control, and construction practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePlacing Reinforcing Bars\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides guidance for reinforcing-steel placement, supports, spacing, lap splices, development, bending, tying, tolerances, bar identification, and coordination with concrete construction.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSP-4 Formwork for Concrete, 2014, 8th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers concrete formwork planning, design considerations, construction methods, loads, shoring, bracing, materials, safety, stripping, tolerances, and field practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLaws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eContains North Carolina statutes and regulations governing general contractors, including classifications, limitations, qualifiers, applications, prohibited conduct, disciplinary provisions, and licensing responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cp\u003eThe following two references in this package are identified for use inside the North Carolina Water Purification and Sewage Disposal Contractor examination room:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eNorth Carolina Administrative Code Title 15A, Subchapter 18C: Water Supplies, Including the Latest Amendments\u003c\/strong\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eThe following included books are study references and are not allowed in the examination room:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cstrong\u003eNorth Carolina Excavation Safety Guidelines, 2022 or Later\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eContractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eNorth Carolina Administrative Code, Title 15A, Chapter 4 Sedimentation Control, Including the Latest Amendments\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eNorth Carolina General Statutes Chapter 113A, Article 4 Sedimentation Pollution Control Act of 1973\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eDesign and Control of Concrete Mixtures, 17th Edition\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eGuide to Shotcrete, 2022\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003ePlacing Reinforcing Bars\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eSP-4 Formwork for Concrete, 2014, 8th Edition\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eLaws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eUse the additional references to build knowledge before the examination, but do not bring them into the testing center. Candidates should review the current examination instructions and make sure the two permitted books comply with all rules concerning binding, tabs, highlighting, notes, and inserted materials.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBegin your preparation with construction safety and the North Carolina water-supply regulations because these are the references available during the examination. Become familiar with the organization of each publication and practice finding information without relying on a general internet search or outside notes.\u003c\/p\u003e\n\u003cp\u003eFor construction safety, review excavation and trenching, concrete and masonry construction, reinforcing steel, formwork, scaffolds, ladders, fall protection, confined spaces, equipment operation, electrical hazards, material handling, personal protective equipment, and jobsite inspections.\u003c\/p\u003e\n\u003cp\u003eFor water-supply regulations, study definitions, public water-system requirements, treatment considerations, distribution requirements, design or construction provisions, source protection, monitoring, operational responsibilities, and enforcement-related topics presented in the regulation.\u003c\/p\u003e\n\u003cp\u003eUse the concrete references to understand mixture design, durability, placement, curing, reinforcing bars, formwork, and shotcrete. Water and wastewater facilities frequently rely on reinforced concrete tanks, basins, walls, slabs, channels, and structural components that must perform in wet or chemically demanding environments.\u003c\/p\u003e\n\u003cp\u003eUse the pipe and excavation references to review trench planning, dewatering, bedding, pipe handling, installation, backfill, compaction, equipment selection, utility conflicts, and site restoration. Proper excavation and pipe construction are essential to the performance of treatment and collection systems.\u003c\/p\u003e\n\u003cp\u003eStudy sedimentation-control requirements before the examination because those books are not allowed into the testing center. Learn the responsibilities connected with land disturbance, erosion-control plans, stabilization, inspections, runoff management, and enforcement.\u003c\/p\u003e\n\u003cp\u003eBusiness and law preparation should include contracts, project management, financial control, insurance, risk, liens, licensing, qualifiers, and contractor responsibilities. Technical experience alone may not address the administrative and legal questions associated with operating a contracting business.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Water Purification and Sewage Disposal Contractor candidates organize a broad technical and regulatory book list into a practical study system. This package combines the two references available during the exam with supporting books that address the wider range of construction and contractor topics connected with the classification.\u003c\/p\u003e\n\u003cp\u003eThe collection supports trade-focused review of treatment-facility construction, water-supply requirements, site safety, excavation, piping, concrete, shotcrete, reinforcing steel, formwork, sedimentation control, business practices, and contractor law.\u003c\/p\u003e\n\u003cp\u003eContractor Exam Prep encourages candidates to use the study-only books to build technical understanding and the approved books to develop reference-navigation skills. This combination helps connect practical construction knowledge with the regulations and safety standards available during the open-book test.\u003c\/p\u003e\n\u003cp\u003eOrganized review and repeated practice can help candidates identify weak areas and create a more consistent preparation routine. A candidate who understands concrete construction but needs more work with state water regulations can devote additional time to the permitted regulatory reference. Another candidate may need more study in excavation, formwork, or business law.\u003c\/p\u003e\n\u003cp\u003eNo book package guarantees a passing score, application approval, or contractor license. Results depend on the candidate’s experience, study effort, understanding of the material, reference familiarity, and examination performance.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the North Carolina Water Purification and Sewage Disposal examination open book?\u003c\/h2\u003e\n\u003cp\u003eYes. The examination is open book, but only the approved references that comply with current testing-center rules may be used.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow many books are included in this package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 12 references. Two are identified for exam-room use, and ten are included as supporting study books that are not allowed inside the testing center.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich books are allowed into the exam room?\u003c\/h2\u003e\n\u003cp\u003eThe permitted books are the North Carolina construction safety standards and North Carolina Administrative Code Title 15A, Subchapter 18C: Water Supplies, including the latest amendments.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the concrete and shotcrete books allowed into the exam?\u003c\/h2\u003e\n\u003cp\u003eNo. The concrete-mixture, shotcrete, reinforcing-bar, and formwork references are included for study but are not allowed in the examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhy are books not allowed in the exam included?\u003c\/h2\u003e\n\u003cp\u003eThe additional books support preparation for construction subjects that may require understanding even though the related publications cannot be used during the test. These include excavation, sedimentation control, concrete, reinforcing steel, formwork, business, and licensing law.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the package cover contractor business and law?\u003c\/h2\u003e\n\u003cp\u003eYes. The package includes the North Carolina Contractor’s Guide to Business, Law and Project Management and the state laws and regulations publication for study outside the examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the package include sedimentation-control references?\u003c\/h2\u003e\n\u003cp\u003eYes. It includes the North Carolina Administrative Code sedimentation-control provisions and the Sedimentation Pollution Control Act of 1973. These books are study references and are not allowed in the examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eShould I practice with the two exam-room books before the test?\u003c\/h2\u003e\n\u003cp\u003eYes. Candidates should learn the organization, numbering, headings, definitions, tables, and indexes of both approved references before the examination appointment.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan I bring every book in the package to the testing center?\u003c\/h2\u003e\n\u003cp\u003eNo. Only the two books listed in the Exam Room Approved Books section should be brought for exam-room use. The remaining books must stay outside the testing center.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the examination automatically issue a contractor license?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing the examination is one part of the licensing process. The North Carolina Licensing Board for General Contractors must approve the application and confirm completion of all applicable requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this package guarantee a passing score?\u003c\/h2\u003e\n\u003cp\u003eNo. The package provides organized examination and study references, but results depend on the candidate’s knowledge, preparation, experience, reference-navigation skills, and performance during the examination.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Contractor Book Package","offer_id":45919393185845,"sku":null,"price":1200.0,"currency_code":"USD","in_stock":true},{"title":"Contractor Book Package + Highlighted \u0026 Tabbed [+$800]","offer_id":45919393218613,"sku":null,"price":2000.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-20-NC-WATER-PURIFICATION-BOOKS.jpg?v=1787552614"},{"product_id":"north-carolina-water-lines-and-sewer-lines-contractor-highlighted-tabbed-book-package","title":"North Carolina Water Lines and Sewer Lines Contractor Highlighted \u0026 Tabbed Book Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNorth Carolina Water Lines and Sewer Lines Contractor Highlighted \u0026amp; Tabbed Book Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the North Carolina Water Lines and Sewer Lines Contractor examination with a comprehensive highlighted and tabbed reference package. This collection includes the three books identified for use in the examination room, along with six additional study references that support preparation for excavation, sedimentation control, contractor business practices, project management, licensing law, and underground utility construction.\u003c\/p\u003e\n\u003cp\u003eThe North Carolina Water Lines and Sewer Lines Contractor Highlighted \u0026amp; Tabbed Book Package is designed to help candidates organize a broad technical and regulatory reference list. The books cover construction safety, ductile iron pipe, concrete pipe, box culverts, excavation practices, erosion control, utility notification responsibilities, pipe contracting, contractor law, and North Carolina licensing requirements.\u003c\/p\u003e\n\u003cp\u003eThe three exam-room references are professionally highlighted and tabbed to support faster navigation during study and the open-book examination. Important chapters, technical procedures, safety requirements, installation concepts, tables, definitions, and commonly reviewed subjects are marked and divided with permanent tabs.\u003c\/p\u003e\n\u003cp\u003eThe additional books that are not allowed in the exam room are included to support broader preparation. These references help candidates study examination subjects that may not be fully addressed in the three approved exam-room books. They can also strengthen practical knowledge of excavation, grading, sedimentation control, project administration, liens, laws, and underground utility construction.\u003c\/p\u003e\n\u003cp\u003eHighlighted and tabbed references are most effective when used consistently before exam day. Candidates should practice identifying the subject of a question, selecting the correct book, locating the applicable section, and interpreting the information under timed conditions. Familiarity with the books is an essential part of preparing for an open-book contractor examination.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003ePlease allow an additional 15 business days for highlighted and tabbed trade book package orders.\u003c\/strong\u003e This preparation period is separate from shipping transit time and allows the books to be organized, highlighted, and tabbed before fulfillment.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eThree highlighted and tabbed exam-room references:\u003c\/strong\u003e Includes the construction safety standards, ductile iron pipe installation guide, and concrete pipe and box culvert installation reference.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSix additional study references:\u003c\/strong\u003e Includes books covering excavation safety, sedimentation control, contractor business practices, pipe contracting, and North Carolina licensing laws.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProfessional highlighting:\u003c\/strong\u003e Important technical concepts, requirements, procedures, tables, and definitions are marked for focused review.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePermanent subject tabs:\u003c\/strong\u003e Major sections and frequently used topics are divided to support more efficient navigation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTrade-focused preparation:\u003c\/strong\u003e Supports study of trench safety, excavation, ductile iron pipe, concrete pipe, grading, bedding, joining, backfill, erosion control, business law, and contractor responsibilities.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003cp\u003eThe highlighting and tabbing service is intended to improve organization and reference familiarity. It does not replace reading the materials or practicing with the books. Candidates should use the prepared references during every stage of their exam preparation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Water Lines and Sewer Lines Contractor examination evaluates knowledge associated with underground water and sewer construction. Major trade areas include construction safety, ductile iron pipe installation, concrete pipe installation, excavation, grading, utility-location responsibilities, erosion and sedimentation control, liens, laws, regulations, and general contractor responsibilities.\u003c\/p\u003e\n\u003cp\u003eThe technical portion of the examination requires candidates to understand how pipe materials are received, handled, stored, laid, joined, tested, supported, and backfilled. Candidates should also be familiar with trench conditions, worker protection, bedding, haunch support, compaction, line and grade, fittings, joints, inspection, and installation quality.\u003c\/p\u003e\n\u003cp\u003eThe examination may also address business and regulatory subjects. These can include licensing responsibilities, project management, contracts, liens, excavation notifications, environmental protection, sedimentation control, and compliance with North Carolina contractor requirements.\u003c\/p\u003e\n\u003cp\u003eA complete preparation plan should include both technical trade review and regulatory study. The three exam-room books support the safety and pipe-installation portions of the examination, while the additional references provide broader coverage of excavation, environmental, business, and legal subjects.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Water Lines and Sewer Lines Contractor examination is an open-book test. Candidates may use the approved references during the examination when the books comply with current testing-center rules.\u003c\/p\u003e\n\u003cp\u003eThis package separates the books into two categories: exam-room-approved references and supporting study books that are not allowed inside the testing center. Candidates should review the Exam Room Approved Books section carefully and bring only the permitted references to the examination appointment.\u003c\/p\u003e\n\u003cp\u003eThe approved books may be highlighted and tabbed before the examination when prepared in accordance with current testing requirements. Permanent tabs are used in this package to divide important subjects and major sections. Candidates should inspect every book before the test and remove loose papers, removable notes, temporary flags, unauthorized inserts, or other prohibited materials.\u003c\/p\u003e\n\u003cp\u003eAn open-book format does not eliminate the need to study. Candidates must recognize the topic being tested, determine which reference applies, locate the correct chapter or section, and interpret technical information within the available time.\u003c\/p\u003e\n\u003cp\u003eUse the highlighted sections and permanent tabs as navigation tools, but also become familiar with each book’s table of contents, index, section headings, illustrations, tables, appendices, and terminology. Questions may not use the exact wording shown on a tab, so broader familiarity remains important.\u003c\/p\u003e\n\u003cp\u003eDuring timed practice, identify whether a question relates to construction safety, ductile iron pipe, concrete pipe, excavation, sedimentation control, business, or licensing. Then select the appropriate reference and locate the answer efficiently. Repeating this process helps build a consistent exam-day strategy.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003eReview the Water Lines and Sewer Lines classification.\u003c\/strong\u003e Confirm that the classification matches the underground utility work the applicant intends to perform.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the required contractor application.\u003c\/strong\u003e Submit the information requested by the North Carolina Licensing Board for General Contractors.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the qualifier.\u003c\/strong\u003e The applicant must designate the individual who will satisfy the examination requirement for the classification.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSelect the appropriate license limitation.\u003c\/strong\u003e Choose the limitation that corresponds with the size and scope of the projects the business plans to undertake.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProvide supporting documentation.\u003c\/strong\u003e Submit the organizational, financial, qualifier, and other information required as part of the application process.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e Approved candidates receive instructions for registering and scheduling the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStudy the complete examination content.\u003c\/strong\u003e Use the highlighted and tabbed exam-room books together with the additional study references.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTake the examination.\u003c\/strong\u003e Bring the required identification and only the references permitted under current testing rules.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete the remaining licensing requirements.\u003c\/strong\u003e Follow the Board’s instructions concerning exam results, application completion, and license issuance.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003cp\u003ePassing the examination does not automatically issue a North Carolina contractor license. The applicant must complete all applicable application, qualifier, financial, organizational, and administrative requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe North Carolina Licensing Board for General Contractors regulates contractor classifications and license limitations in the state. The Water Lines and Sewer Lines classification applies to qualifying underground utility construction involving water mains, sewer mains, service lines, building sewer lines, and related systems.\u003c\/p\u003e\n\u003cp\u003eWork may involve excavation, grading, pipe installation, fittings, appurtenances, pumping facilities, storage systems, backfill, compaction, pavement restoration, and erosion-control activities connected with water and sewer construction.\u003c\/p\u003e\n\u003cp\u003eApplicants must identify a qualifier for the classification. The qualifier is the individual who satisfies the applicable examination requirement on behalf of the contractor license applicant.\u003c\/p\u003e\n\u003cp\u003eNorth Carolina contractor licenses are issued under limitations that affect the value of projects a licensee may undertake. Applicants should select the limitation that matches their intended work and satisfy the financial or bonding requirements connected with that limitation.\u003c\/p\u003e\n\u003cp\u003eWater and sewer contractors must also understand responsibilities involving utility-location requests, trench safety, environmental protection, sedimentation control, jobsite restoration, and coordination with other trades. Work outside the scope of the classification may require another contractor classification or a separately licensed professional.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cp\u003eThis highlighted and tabbed package includes the following exam-room and supporting study references:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers construction safety requirements relevant to underground utility work. Important subjects include trenching and excavation, protective systems, inspections, spoil placement, access and egress, water accumulation, hazardous atmospheres, heavy equipment, personal protective equipment, and worker protection.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eInstallation Guide for Ductile Iron Pipe\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides technical guidance for handling, storing, laying, joining, cutting, tapping, restraining, testing, and backfilling ductile iron pipe. It also covers fittings, gaskets, joint assembly, alignment, deflection, polyethylene encasement, and field installation practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eConcrete Pipe and Box Culvert Installation, 2019\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAddresses concrete pipe and box culvert installation, including foundations, bedding, unloading, handling, placement, line and grade, joints, haunch support, backfill, compaction, inspection, and installation quality.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Excavation Safety Guidelines, 2022 or Later\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eSupports study of excavation notification, utility locating, safe-digging procedures, proposed excavation markings, utility markings, damaged facilities, and contractor responsibilities before and during underground work.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina Administrative Code, Title 15A, Chapter 4 Sedimentation Control, Including the Latest Amendments\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eContains administrative requirements related to erosion and sedimentation control, land-disturbing activities, plans, stabilization, runoff, inspections, enforcement, and construction-site responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eNorth Carolina General Statutes Chapter 113A, Article 4 Sedimentation Pollution Control Act of 1973\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides the statutory framework for sedimentation-pollution control in North Carolina, including regulatory authority, land-disturbing activities, prohibited conduct, required plans, enforcement, and contractor obligations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eCovers business organization, contracts, project management, estimating, financial management, insurance, employment practices, safety administration, liens, risk management, and North Carolina contractor responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eProvides practical information on underground pipe construction, excavation, trenching, estimating, equipment, productivity, dewatering, bedding, installation, backfill, compaction, and project planning.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLaws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eContains statutes and regulations governing North Carolina general contractors, including classifications, limitations, qualifiers, applications, prohibited conduct, disciplinary provisions, and licensing responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cp\u003eThe following three highlighted and tabbed references are included for use in the North Carolina Water Lines and Sewer Lines Contractor examination room:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cstrong\u003eNorth Carolina Occupational Safety and Health Standards for the Construction Industry, with Latest Available Amendments\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eInstallation Guide for Ductile Iron Pipe\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eConcrete Pipe and Box Culvert Installation, 2019\u003c\/strong\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eThe following included books are study references and are not allowed in the examination room:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cstrong\u003eNorth Carolina Excavation Safety Guidelines, 2022 or Later\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eNorth Carolina Administrative Code, Title 15A, Chapter 4 Sedimentation Control, Including the Latest Amendments\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eNorth Carolina General Statutes Chapter 113A, Article 4 Sedimentation Pollution Control Act of 1973\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eContractor’s Guide to Business, Law and Project Management - North Carolina General Contractors Edition, 10th Edition\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eLaws and Regulations Applicable to General Contracting in the State of North Carolina\u003c\/strong\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eTesting-center personnel make the final determination regarding whether a reference complies with exam-day rules. Candidates should inspect the three approved books before the appointment and make sure they are free from loose papers, unauthorized notes, removable flags, and prohibited attachments.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eA practical preparation plan should begin with construction safety, ductile iron pipe installation, concrete pipe installation, and excavation. These subjects require familiarity with detailed procedures, terminology, field conditions, and accepted construction practices.\u003c\/p\u003e\n\u003cp\u003eFor safety, review trench protective systems, soil conditions, inspections, access and egress, spoil placement, water accumulation, hazardous atmospheres, suspended loads, equipment operation, underground installations, and personal protective equipment. Underground utility construction presents serious hazards, and candidates should understand both general requirements and condition-specific rules.\u003c\/p\u003e\n\u003cp\u003eFor ductile iron pipe, study receiving, unloading, storage, trench preparation, pipe laying, cleaning, lubrication, gasket placement, joint assembly, fittings, cutting, tapping, restraint, deflection, testing, polyethylene encasement, and backfill. Learn the names and functions of the components used throughout the system.\u003c\/p\u003e\n\u003cp\u003eFor concrete pipe and box culverts, review foundations, bedding, alignment, grade, joint preparation, placement, lifting, handling, haunch support, backfill zones, compaction, inspection, and repair considerations. Understand how proper support and installation affect structural performance.\u003c\/p\u003e\n\u003cp\u003eUse the additional references to review excavation notification, erosion and sedimentation control, contractor business practices, liens, project management, licensing law, and general pipe-contracting methods. These books are not available inside the examination room, so the related information should be learned before the test.\u003c\/p\u003e\n\u003cp\u003ePractice timed reference searches with the three approved books. Select a topic, determine which publication applies, locate the section, and confirm the answer. Revisit subjects that take too long to find and improve your familiarity with the indexes, tables, illustrations, and chapter organization.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow Contractor Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003eContractor Exam Prep helps North Carolina Water Lines and Sewer Lines Contractor candidates organize a demanding reference list into a practical preparation system. This package combines the books permitted in the exam room with additional study materials that address the broader technical, regulatory, and business subjects connected with the examination.\u003c\/p\u003e\n\u003cp\u003eProfessional highlighting draws attention to important requirements, procedures, definitions, tables, and trade concepts. Permanent tabs provide access points for major chapters and frequently reviewed topics. These features help candidates focus on learning the books rather than beginning with an unorganized reference set.\u003c\/p\u003e\n\u003cp\u003eThe package supports trade-focused review of trench safety, ductile iron pipe, concrete pipe, excavation, grading, bedding, joining, backfill, compaction, utility locating, environmental protection, project management, and contractor law.\u003c\/p\u003e\n\u003cp\u003eContractor Exam Prep encourages candidates to combine technical study with repeated reference-navigation practice. Learning which book applies to each subject and practicing under time limits can help build a more consistent approach to the open-book examination.\u003c\/p\u003e\n\u003cp\u003eNo book package guarantees a passing score, application approval, licensing approval, or a specific examination result. Outcomes depend on the candidate’s experience, preparation, understanding of the material, reference familiarity, and exam-day performance.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the North Carolina Water Lines and Sewer Lines examination open book?\u003c\/h2\u003e\n\u003cp\u003eYes. The examination is open book, but only the approved references that comply with current testing-center requirements may be used.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow many books are included in this package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes nine books. Three are identified for exam-room use, and six are included as supporting study references that are not allowed in the testing center.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich books are allowed into the exam room?\u003c\/h2\u003e\n\u003cp\u003eThe approved books are the North Carolina construction safety standards, the Installation Guide for Ductile Iron Pipe, and Concrete Pipe and Box Culvert Installation, 2019.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the additional six books allowed in the exam room?\u003c\/h2\u003e\n\u003cp\u003eNo. The excavation, sedimentation-control, business, pipe-contracting, and licensing-law books are included for study only and must not be taken into the examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the books highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eYes. This package includes professional highlighting and permanent subject tabs to support organized study and faster navigation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhy are books not allowed in the exam included?\u003c\/h2\u003e\n\u003cp\u003eThe additional books support preparation for subjects such as excavation notification, sedimentation control, contractor business practices, laws, liens, licensing responsibilities, and general pipe construction.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich edition of Concrete Pipe and Box Culvert Installation is included?\u003c\/h2\u003e\n\u003cp\u003eThis package includes Concrete Pipe and Box Culvert Installation, 2019.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan the approved books contain highlighting and tabs?\u003c\/h2\u003e\n\u003cp\u003eThe books should comply with the current testing provider’s rules concerning highlighting, permanent tabs, notes, binding, and inserted materials. Testing-center personnel make the final decision regarding permitted references.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does this package take to prepare?\u003c\/h2\u003e\n\u003cp\u003ePlease allow an additional 15 business days for highlighted and tabbed trade book package orders. Shipping transit time is separate from the preparation period.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the exam automatically provide a contractor license?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing the examination is one part of the licensing process. The North Carolina Licensing Board for General Contractors must approve the complete application and confirm that all applicable requirements have been satisfied.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this package guarantee a passing score?\u003c\/h2\u003e\n\u003cp\u003eNo. The package supports organized preparation and reference practice, but results depend on the candidate’s knowledge, experience, study effort, and performance on exam day.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Highlighted \u0026 Tabbed Book Package","offer_id":45919393251381,"sku":null,"price":900.0,"currency_code":"USD","in_stock":true},{"title":"Highlighted \u0026 Tabbed Books + Online Self Study Course [+$295]","offer_id":45919393284149,"sku":null,"price":1195.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2522\/1688\/files\/2026NEWPRODUCTS-72-NC-WATER-LINES-HT.jpg?v=1787552615"}],"url":"https:\/\/contractorexampreps.com\/collections\/north-carolina-courses.oembed?page=3","provider":"Contractor Exam Preps","version":"1.0","type":"link"}